LR-N07-0172, Inservice Inspection Activities - 90-Day Report

From kanterella
Jump to navigation Jump to search
Inservice Inspection Activities - 90-Day Report
ML072120526
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/20/2007
From: Braun R
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N07-0172
Download: ML072120526 (6)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 Nitclea. LLC T.S. 4.0.5 JUL 2 0 2OO7 10 CFR 50.55a (g)

LR-N07-0172 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555-001 Salem Nuclear Generating Station Unit 1 Facility Operating License No. DPR-70 NRC Docket No. 50-272

SUBJECT:

INSERVICE INSPECTION ACTIVITIES DAY REPORT This letter submits the Owners Activity Report for Inservice Inspection (ISI) activities conducted at the Salem Generating Station Unit No. 1 during the eighteenth refueling outage. This report is submitted in accordance with Code Case N-532-1 "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission Section Xl, Division 1," and within the specified ninety (90) day reporting requirement. to this letter contains the required Salem Unit 1 Owners Activity Report.

Should you have any questions regarding this submittal, please contact E. H. Villar at (856) 339-5456.

Sincerely, Robert Braun Site Vice President - Salem Enclosures (1) k4-7 95-2168 REV. 7/99

JUL 2o 207 Document Control Desk Page 2 LR-N07-0172 C Mr. S. Collins, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. R. Ennis, Project Manager - Salem U.S. Nuclear Regulatory Commission Mail Stop 08B1 Washington, DC 20555-0001 USNRC Senior Resident Inspector - Salem (X24)

Mr. P. Mulligan, Manager IV Bureau of Nuclear Engineering P. O. Box 415 Trenton, NJ 08625 Mr. Milton Washington Chief Inspector NJ Department of Labor Division of Public Safety, Occupational Safety and Health Bureau of Boiler and Pressure Vessel Compliance P. O. Box 396 101 South Broad Street Trenton, NJ 08625-0392

Nuclear Regulatory Commission LR-N07-0172 Salem Unit 1 Owners Activity Report - S1 R1 8 In Accordance With ASME Section XI Code Case N-532-1

SALEM GENERATING STATION UNIT I - SIRFO18 OAR REPORT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number SlRFO18 Owner PSEG Nuclear LLC, PO Box 236, Hancocks Bridge, NJ 08038 Plant Salem Generating Station Unit No. 1 Commercial Service Date July 1, 1977 Refueling Outage No. 18 Current Inspection Interval Third (3 rd)

Current Inspection Period Second (2nd)

Edition and Addenda of Section Xl Applicable to the inspection plan 1998 Edition 2000 Addenda; IWE and IWL - 1998 Edition, 1998 Addenda; Appendix VIII examinations - 1995 Edition 1996 Addenda as amended by Final Rule Date and revision of inspection plan 11/2003, Revision 1 Edition &Addenda of Section XI Applicable to repairs and replacements, if different than the inspection plan ASME Class 1, 2 and 3 - 1998 Edition, 2000 Addenda; Class MC - 1992 Edition, 1992 Addenda (Unless specifically identified in the individual repair plan)

CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.

Certification of Authorization No. N/A Expiration Date N/A Signed -a. N- *_* ./V7Wt7,* Date V ,/ p

  • Owner or Owner's Desighee, Title I /

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New Jersey and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, during the period November 7, 2005 to April 20, 2007, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or d with this inspection.

H S9 -C-7 Commissions _ _ _ __77 _.

Inspector's ýignature National Board, State, Province, and Endorsements Date ___//____

Page I of 3

SALEM GENERATING STATION UNIT 1 - SIRFO18 OAR REPORT TABLE I - ABSTRACT OF EXAMINATIONS AND TESTS Exam Total Total Total Total Remarks Category Examinations Examinations Examinations Examinations Required for Credited for Credited (%) Credited (%)

the Interval the Period for the Period To Date for the Interval B-A 21 0 0 5 3 rd Interval, 2 nd Period; See Note 1 B-B 5 2 40 60 3 rd Interval, 2 nd Period; See Note 5 B-D 30 7 23 37 3 rd Interval, 2 nd Period; See Note 2 B-G-1 20 7 35 55 3rd Interval, 2 nd Period; See Note 1 B-G-2 84 23 27 63 3 rd Interval, 2 nd Period B-K 8 3 38 125 3 rd Interval, 2 nd Period B-L-1 1 0 0 100 3 rd Interval, 2 nd Period; See Note 1 B-L-2 4 0 0 0 3 rd Interval, 2 nd Period; See Note 3 B-M-1 2 0 0 0 3 rd Interval, 2 nd Period; See Note 1 B-M-2 30 0 0 13 3 rd Interval, 2 nd Period; See Note 3 B-N-1 4 1 25 50 3 rd Interval, 2 nd Period B-N-2 1 0 0 0 3 rd Interval, 2 nd Period; See Note 1 B-N-3 14 0 0 0 3 rd Interval, 2 nd Period; See Note 1 B-0 1 0 0 0 3 TdInterval, 2 nd Period; See Note 1 B-P 6 2 33 67 3d Interval, 2d Period C-A 21 4 19 57 3rd Interval, 2 nd Period C-B 8 3 38 63 3rd Interval 2 nd Period; See Note 6 C-C 17 6 35 71 3 rd Interval, 2 nd Period C-D 2 0 0 50 3 rd Interval, 2 nd Period; See Note 7 C-G 3 1 33 67 3 rd Interval, 2 nd Period; See Note 8 C-H 177 59 33 67 3rd Interval, 2nd Period D-A 30 10 33 77 3 rd Interval, 2 nd Period D-B 165 55 33 67 3 rd Interval, 2 nd Period F-A 308 98 32 67 3 rd Interval, 2 nd Period R-A 146 53 36 70 3 rd Interval, 2 nd Period; See Note 4 E-A 475 158 33 99 1st Interval, 3rd Period; See Note 9 L-A 558 0 0 67 1St Interval, 3T Period; Notes:

1) Deferral permissible for: B-A, B-E, B-G-l, B-L-l, B-M-l, B-N-2, B-N-3, B-O
2) Reference Table IWB-2500-1, Exam Category B-D, Program (B) Notes 2 and 5
3) To be examined only if disassembled for maintenance, repair or volumetric exam. Reference Table IWB-2500-1, Exam Category B-L-2, B-M-2, Note 2
4) Risk Informed was implemented in the second interval, third period, replacing ASME categories B-F, B-J, C-F-i, and C-F-2.
5) Reference Table IWB-2500-1, Exam Category B-B, Note 1
6) Reference Table IWC-2500-1, Exam Category C-B, Note 4
7) Reference Table IWC-2500-1, Exam Category C-D, Note 2
8) Reference Table IWC-2500-1, Exam Category C-G, Note 1
9) Inaccessible components will be examined when they become accessible.

SALEM GENERATING STATION UNIT 1 - S1IRFOI 8 OAR REPORT TABLE 2 - ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Exam Item Item Description Flaw Flaw or Relevant Category Number Characterization Condition Found During (IWA-3300) Scheduled Section XI Examination or Test

_______________________________________________ ____________ (Yes or No)

D-B13 D2.1 0 Upstream instrument tubing weld to valve 11 SW493 Non-Planar No TABLE 3 - ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Code Repair, Item Description Description of Work Flaw or Relevant Date Repair/

Class Replacement, Condition Found Completed Replacement or Corrective During Scheduled Plan Number Measure Section XI Examination or Test (Yes or No) 3 Replacement Instrument tubing Replacement of No 04/16/2007 60068795 downstream of valve Instrument Tubing 11 SW405 3 Replacement Instrument tubing Replacement of No 04/11/2007 60068805 upstream of valve Instrument Tubing 11 SW493 3 Repair Drain line of radiation Repair weld No 03/23/2007 60067947 monitor 1RA3907 3 Replacement Drain line of radiation Replacement of pipe No 03/30/2007 60067946

__________monitor 1 RA3908 3 Replacement Tubing downstream of Replacement of No 10/25/2006 60061807 valve 12SW4 Instrument Tubing 3 Replacement Valve 12SW75 Replacement of No 08/19/2006 60064674 valve 3 Replacement Pipe Support 1-SWPG-049 Replace bolts No 12/23/2005 60060183

____________bolting 3 Replacement Instrument valve 115W4 Replace tubing No 12/08/2005 60059644 tubing 3 Replacement Valve 12CC 197 tubing to Replace tubing, No 03/09/2007 60067703 adapter weld adapter, and downstream

___________instrument valve 2 Repair Check valve 1CV1 73 body Structurally secured No 04/17/2007 60068869 to cover connection threaded connection

.with fillet weld 3 Replacement 1SWE32 CFCU motor Replace cooler head No 04/30/2004 30072946

______________cooler head to nozzle weld with spare