LR-N08-0174, Inservice Inspection Activities - 90-Day Report
| ML082270207 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/06/2008 |
| From: | Braun R Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N08-0174 | |
| Download: ML082270207 (6) | |
Text
PSEG Nuclear LLC P.O. Box 236,, Hancocks Bridge, NJ 08038-0236 0 PSEG Nuclear L.L. C.
August 6, 2008 LR-N08-0174 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555-001 Salem Nuclear Generating Station Unit 2 Facility Operating License No. DPR-75 NRC Docket No. 50-311
SUBJECT:
Inservice Inspection Activities Day Report This letter submits the Owners Activity Report for Inservice Inspection (ISI) activities conducted at the Salem Generating Station Unit No. 2 during the sixteenth refueling outage. This report is submitted in accordance with Code Case N-532-1 "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission Section XI, Division 1," and within its ninety (90) day reporting requirement. to this letter contains the required Salem Unit 2 Owners Activity Report.
Should you have any questions regarding this submittal, please contact E. H. Villar at (856) 339-5456.
Sincerely, Robert Braun Site Vice President - Salem Enclosures (1)
)4097
Nuclear Regulatory Commission August 6, 2008 Page 2 LR-N08-0174 C
Mr. S. Collins, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. R. Ennis, Project Manager - Salem U.S. Nuclear Regulatory Commission Mail Stop 08B1 Washington, DC 20555-0001 USNRC Senior Resident Inspector-Salem (X24)
Mr. P. Mulligan, Manager IV Bureau of Nuclear Engineering P. 0. Box 415 Trenton, NJ 08625 Mr. Milton Washington Chief Inspector NJ Department of Labor Division of Public Safety, Occupational Safety and Health Bureau of Boiler and Pressure Vessel Compliance P. O. Box 396 101 South Broad Street Trenton, NJ 08625-0392
Nuclear Regulatory Commission LR-N08-0174 Salem Unit 2 Owners Activity Report - S2R16 In Accordance With ASME Section XI Code Case N-532-1 1 -
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number S2RFO16 Owner PSEG Nuclear LLC, PO Box 236, Hancocks Bridge, NJ 08038 Plant Salem Generating Station UnitNo.
2 Commercial Service Date Oct. 31, 1981 Refueling Outage No. 16 Current Inspection Interval Third (3Qd)
{IWE/IWL (ISt)}
Current Inspection Period Second (2nd)
{IWE/IWL (3rd)}
Edition and Addenda of Section XI Applicable to the inspection plan 1998 Edition 2000 Addenda; IWE and IWL - 1998 Edition, 1998 Addenda; Appendix VIII examinations - 1995 Edition 1996 Addenda as amended by Final Rule Date and revision of inspection plan 11/2003, Revision 0 Edition & Addenda of Section XI Applicable to repairs and replacements, if different than the inspection plan ASME Class 1, 2 and 3 - 1998 Edition, 2000 Addenda; Class MC - 1992 Edition, 1992 Addenda (Unless specifically identified in the individual repair plan)
CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.
Certification of Authorization No.
N/A Signed ate
-aOwner or Owner's Designee, tle Expiration Date N/A
-7// 22 R
/
CERTIFICATEOF I4SERVCE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New Jersey and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, during the period November 2, 2006 to May 08, 2008.
and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described in this report. Furthermore, neither the Inspector nor his employer shall. be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions k 6 18,' -3 V AJ 1 3 9 a-AJ.
4 -J /
Inspector's Signature National Board, State, Prevince, and Endorsements Date q1-t /off 1 -
TABLE 1 - ABSTRACT OF EXAMINATIONS AND TESTS Exam Total Total Total Total Remarks Category Examinations Examinations Examinations Examinations Required for the Credited for the Credited (%) for Credited (%) To 3'd Interval 2 nd Period the 2 'd Period Date for the 3 rd Interval B-A 21 0
0 0
3 rd Interval. 2 nd Period; See Note I B-B 5
1 20 40 3 rd Interval. 2 d Period; See Note 5 B-D 30 3
10 27 3 d Interval. 2 nd Period; See Note 2 B-G-I 14 4
29 57 33rd Interval, 2 nd Period; See Note I B-G-2 84 17 20 60 3'd Interval, 2'd Period B-K 7
1 14 43 3 rd Interval, 2 nd Period B-L-1 1
0 0
0 3 rd Interval, 2 nd Period; See Note I B-L-2 1
0 0
0 3 rd Interval, 2nd Period; See Note 3 B-M-I 1
0 0
100 3 rd Interval, 2 d Period; See Note I B-M-2 8
2 25 38 3 rd Interval, 2 nd Period; See Note 3 B-N-I 8
0 0
20 3 rd Interval. 2 nd Period B-N-2 1
0 0
0 3 rd Interval, 2 nd Period; See Note 1 B-N-3 13 0
0 0
3 rd Interval, 2 nd Period; See Note 1 B-O 1
0 0
0 3 rd Interval, 2 nd Period; See Note 1 B-P 10 1
10 50 3 rd Interval, 2nd Period C-A 18 0
0 28 3rd Interval, 2 nd Period C-B 7
1 14 14 3 rd Interval, 2 nd Period; See Note 6 C-C 27 0
0 30 3 rd Interval, 2"d Period C-D 2
0 0
0 3rd Interval, 2 nd Period; See Note 7 C-G 3
0
.0 33 3rd Interval, 2"d Period; See Note 8 C-H 155 39 25 55 3rd Interval. 2nd Period D-A 32 1
3 38 3 rd Interval, 2nd Period D-B 171 50 29 63 3rd Interval, 2 nd Period F-A 318 7
2 31 3rd Interval, 2nd Period R-A 185 25 14 44 3 d Interval, 2 d Period; See Note 4 IWE/IWL 1st Interval 3rd Period 3rd Period 1st Interval E-A 480 154 32 99 1st Interval, 3,d Period; See Note 9 L-A 558 0
0 67 1" Interval, 3rd Period; Notes:
1) 2)3)
Deferral permissible for: B-A, B-E, B-G-l, B-L-I, B-M-1, B-N-2, B-N-3, B-O Reference Table IWB-2500-1, Exam Category B-D, Program (B) Notes 2 and 5 To be examined only if disassembled for maintenance, repair or volumetric exam. Reference Table IWB-2500-1, Exam Category B-L-2, B-M-2, Note 2
- 4) Risk Informed was implemented in the second interval, third period, replacing ASME categories B-F, B-J, C-F-1, and C-F-2.
- 5) Reference Table IWB-2500-1, Exam Category B-B, Note 1
- 6) Reference Table IWC-2500-1, Exam Category C-B, Note 4
- 7) Reference Table IWC-2500-1, Exam Category C-D, Note 2
- 8) Reference Table IWC-2500-1, Exam Category C-G, Note 1
- 9) Inaccessible components will be examined when they become accessible.
2 -
TABLE 2 - ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE No items with flaws or relevant conditions that required evaluation for continued service Exam
.Item Item Description Flaw Flaw or Relevant Condition Category Number Characterization Found During Scheduled (IWA-3300)
Section XI Examination or
'Test (Yes or No)
TABLE 3 - ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Code
- Repair, Item Description Description of Work Flaw or Relevant Date Repair/
Class Replacement, or Condition Found Completed Replacement Corrective During Scheduled Plan Number Measure Section XI Examination or Test (Yes or No) 3 Replacement Valve Replace valve Replace valve No 1/17/08 60072485 S2SW -2SW557 S2SW -2SW557 3
Replacement Instrument tubing to Valve Replace tubing No 4/28/08 60076364 S2SW -2SW449 3
Replacement Instrument tubing from Replace tubing No 12/2/07 60073579 Valve S2SW -2SW341 3
Replacement Instrument tubing from Replace tubing No 12/5/06 60066216 valve S2SW -25SW73 3
Replacement Instrument tubing leak on Replace tubing No 3/28/07 60068328 fan coil unit S2RM -
2RA9853 2
Replacement Rusted spring can hangers Replace spring cans No 4/24/08 60075919 S2RHR-2RHRH21-16 2
Replacement Instrument leak from valve Replace tubing No 6/3/07 60068724 S2CVC-2CV256 2
Replacement 3/4" Pipe leak upstream of Replace pipe No 12/8/06 60066694 valve S2CS-2CS61 2
Replacement 3/4" Pipe leak upstream of Replace pipe No 4/25/08 60076062 valve S2CC -2CC183 2
Replacement/
Excessive corrosion on Weld build up and No 4/24/08 60076064 Repair spool 2CC180 pipe spool replacement 3 -