ML103440447

From kanterella
Jump to navigation Jump to search
Document: Inservice Testing Auxiliary Feedwater Valves Mode 3. S2.OP-ST.AF-0007Q Rev. 20
ML103440447
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/23/2009
From:
Public Service Electric & Gas Co
To:
Office of Information Services
References
FOIA/PA-2010-0334 S2.OP-ST.AF-0007(Q), Rev. 20
Download: ML103440447 (13)


Text

PSEG Internal Use Only Page I of 1 PSEG NUCLEAR L.L.C.

SALEM/OPERATIONS S2.OP-ST.AF-0007(Q) - REV. 20 INSERVICE TESTING AUXILIARY FEEDWATER VALVES MODE 3 USE CATEGORY: I

  • Biennial Review Performed: Yes_ No,/_
  • Change Packages and affected document numbers incorporated into this revision: None
  • OTSC(s) incorporated into this revision: None
    • OPEX(s) incorporated into this revision: None REVISION

SUMMARY

  • The following changes are considered editorial in nature as described in AD-AA-101 as previously approved in other AFW procedures. (70103182)
1. 2.1 - Updated second bulleted step to include the new permanently installed Controlotron 1010 flow measurement device.
2. 3.5 - Added Precaution and Limitation to state that the Controlotron 1010 needs to be zeroed only if it does not display a "0" indication.
3. 5.1.5 - Added step to check for "0" indication and to direct maintenance to zero the Controlotron if "0" is not displayed.
4. 5.1.25 - Added step that if the Panametrics flow measurement device was used, then to direct maintenance to remove' the Panametrics.
5. 7.6.2 - Updated reference to SC.IC-DC.ZZ-0003(Q), Controlotron Model 960, 990 and 1010 Flow Computer Zero Adjustment.
6. Attachment 1, Section 5.0 - Updated reference to SC.IC-DC.ZZ-0003(Q), Controlotron Model 960, 990 and 1010 Flow Computer Zero Adjustment.
7. Attachment 1, Section 4.0 - Added additional identifier nomenclature to Temporary Test Equipment Installation Point to ensure the test point is properly identified.

IMPLEMENTATION REQUIREMENTS: Effective Date 12/23/09 S* None

S2.OP-ST.AF-0007(Q) 1.0 PURPOSE 1.1 Performance of this procedure is used to partially satisfy the requirements of Technical Specifications 4.0.5 various valves associated with the Auxiliary Feedwater System. This requirement is applicable in Modes 1-3. [C02651 1.2 Performance of this procedure satisfies the full flow test requirements for the 23 Auxiliary Feed Pump per the requirements of NLR-N89196.

This requirement is applicable in Modes 1-3. [C06001 1.3 Performance of this procedure is required during each Refueling Outage or as otherwise specified for post-maintenance operational retest requirements.

IAW ER-AA-32 1, Administrative Requirements for Inservice Testing, the procedure may be required following a Cold Shutdown, if NOT performed in the last 92 days. (70038509) 1.4 This procedure is performed in Mode 3 with RCS Tavg <543°F and S/G pressure >680 psig.

2.0 PREREQUISITES 2.1 The following test equipment setup and preparation may be performed in any Mode:

_ENSURE Qualified Individual is available to perform Vibration Data Collection of 23 Auxiliary Feedwater Pump utilizing a Vibration Data Collector

_ ENSURE Maintenance is available to zero either of the 2 flow instruments listed, if required:

  • SC.IC-DC.ZZ-0003(Q), Controlotron Model 960, 990 and 1010 Flow Computer Zero Adjustment.

OR

  • SC.IC-GP.ZZ-0177(Q). Panametrics Flow Instrument Data Procedure.

+ Direct a Qualified Individual to PERFORM the following:

  • ENSURE the outlets used for powering test equipment, such as Controlotrons / Panametrics, are "live" by plugging in the proper voltage electrical device, such as a drop light.
  • RECORD calibration Data for the M&TE and Vibration Data Collection Equipment listed in Attachment 1, Section 3.0 and 4.0. [C02891
  • INSTALL temporary test equipment as specified in Attachment 1, Section 4.0.

Salem2 Page 2 of 24 Rev. 20

S2.OP-ST.AF-0007(Q) 3.6 23 AF Pump should NOT exceed 4000 rpm.

3.7 DO NOT operate 23 AF Pump if suction pressure is <8.0 psig.

3.8 Governor Oil Reservoir level must remain observable in sightglass during performance of this procedure.

3.9 IF substitution of Measuring and Test Equipment (M&TE) is required, IST THEN the IST Implementation Engineer has specified range, accuracy and documented substitution in the Comments Section of Attachment 4.

3.10 21 and 22 Auxiliary Feedwater Pumps should be OPERABLE during performance of this surveillance.

3.11 IF 23 Auxiliary Feedwater Pump is tripped (MS52) during restoration, THEN requirements of Technical Specification 3.7.1.2 are applicable.

3.12 22 Blowdown tank will spill over into 23 Aux Feed Pump Turbine Steam Header Drain Line at z 91.6% (66") level. Line will fill with water and present backpressure problems for drains affecting turbine performance.

3.13 Motor driven Auxiliary Feedwater Pumps should be out of service when data is to be obtained. With the motor driven Auxiliary Feedwater Pumps inservice the flow is the sum of the flow from the motor driven and steam driven auxiliary feedwater pumps.

4.0 EQUIPMENT/MATERIAL REOUIRED 4.1 Additional Tools and Equipment:

  • Vibration Data Collector
  • Triaxial Accelerometer 4 Calibrated Stopwatch 4 One (1) Heise Gauge or equivalent, range 0-60/0-100 psig, accuracy +/-0.1%

of full scale and uncertainty factor of +/-0.06 psig or better.

4 One (1) Heise Gauge or equivalent, range 0-3000 psig, accuracy +/-0.1%

of full scale and uncertainty factor of +/-3.0 psig or better.

4.2 Procedure(s)

  • S2.RA-ST.AF-0007(Q), Inservice Testing - Auxiliary Feedwater System Mode 3 Acceptance Criteria, if applicable Salern2 Page 4 of 24 Rev. 20

s 2 .OP-ST.AF..0007(Q) 5.1.6 IF a Panametrics is to be used in place of Controlotron, THEN direct Maintenance Technician to:

A. INSTALL Panametrics Flow Instrument.

B. PERFORM Panametrics Flow Instrument Data adjustment JAW SC.IC-GP.ZZ-0177(Q), Panametrics Flow Instrument Data Procedure.

C. RECORD Panametrics calibration data AND completion data in Attachment 1, Section 5.0.

5.1.7 START 23 Auxiliary Feedwater Pump IAW S2.OP-SO.AF-0001(Q),

Auxiliary Feedwater System Operation.

NOTE The recommended Steam Generator NR level band is 24% to 54%. (P&L 3.2)

CAUTION The following steps supply Steam Generators with full Aux Feedwater flow.

Any Steam Generator Level exceeding 67% will cause an ESF Actuation for Turbine Trip and Feedwater Isolation.

23 Auxiliary Feedwater Pump should be stopped if any SG NR Level is >55%470067944) 5.1.8 PERFORM the following to exercise Check Valve 21 AF921 to the full-stroke OPEN position:

A. ADJUST 21 AF 11, STEAM GENERATOR INLET VALVE, to obtain

Ž1_11E04 lbm/hr indicated on 2FA5751, 21 S/G AUX FEED FLOW.

B. RECORD 21AF921 OPEN "Test Results" by initialing S the SAT or UNSAT columns using Acceptance Criteria in Attachment 2, Section 1.0.

C. ADJUST 21AF 11, STEAM GENERATOR INLET VALVE, as required, to maintain 21 Steam Generator level.

Salern2 Page 6 of 24 Rev. 20

S2 .OP-ST.AF-0007(Q)

NOTE The recommended Steam Generator NR level band is 24% to 54%. (P&L 3.2)

CAUTION 4000 RPM should not be exceeded as turbine damage may result.

The following steps supply Steam Generators with full Aux Feedwater flow.

Any Steam Generator Level exceeding 67% will cause an ESF Actuation for Turbine Trip and Feedwater Isolation.

23 Auxiliary Feedwater Pump should be stopped if any SG NR Level is >55%. (70067944)

Additional steam flow during 23 Auxiliary Feedwater Pump operation and feeding Steam Generators at >44E04 Ibm/hr will cooldown the RCS. Pzr LvI should be maintained between 30-53% to prevent Letdown Isolation during testing.

Values outside of those listed in the acceptable range of S2.RA-ST.AF-0007(Q),

for Pump Total Flow Rate, do not necessarily make the pump inoperable, but do invalidate the performance of the procedure.

5.1.12 Simultaneously PERFORM the following to establish 44.5E04 lbm/hr Full Flow Performance conditions:

+ ADJUST speed to 3600 (3550-3650) rpm as indicated by 2SA5740.

+ ADJUST 21-24AF 11, as necessary, to obtain a S/G Total Aux Feed Flow rate of 44.5E04 Ibm/hr (44.1E04 - 44.9E04 lbml/hr) as indicated on 2FA5751, 2FA5752, 2FA5753 and 2FA5754:

+

_ ENSURE Pump Total Flow Rate is within the Acceptable Range as shown in S2.RA-ST.AF-0007(Q).

_

  • IF Pump Total Flow Rate is NOT within the Acceptable Range, THEN RE-ADJUST S/G Total Aux Feed Flow rate until Pump Total Flow Rate is in the Acceptable Range.

4

_ IF Pump Total Flow Rate is NOT within the Acceptable Range, after re-adjustment of S/G Total Aux Feed Flow rate, S1. UNLOCK AND OPEN 2AF144,23 AUX FD PMP TST LN ISO.

2. UNLOCK AND THROTTLE 2AF146,23 AUX FD PMP TST LN THROT VLV, as necessary, to attain S/G Total Aux Feed Flow rate.

Salem2 Page 8 of 24 Rev. 20

S2.OP-ST.AF-0007(Q)

NOTE Steps 5.1.17 through 5.1.26 maybe performed concurrently with step 5.1.16 5.1.17 CLOSE 23AF5, AF PMP SUCT PRESS TAP.

5.1.18 REDUCE 23 Auxiliary Feedwater Pump flow, as required, to support current unit conditions.

5.1.19 IF 23 Auxiliary Feedwater Pump is to be removed from operation, THEN TRANSFER Auxiliary Feedwater Flow from the 23 Auxiliary Feedwater Pump to the 21 and 22 Auxiliary Feedwater Pumps, as required, IAW S2.OP-SO.AF-000 1(Q), Auxiliary Feedwater System Operation.

5.1.20 ADJUST Charging flow to establish Pressurizer level at program.

5.1.21 ADJUST Steam Generator Blowdown flow to maintain Steam Generator levels.

5.1.22 RESTORE 21AF 11, 22AF1 1, 23AF 1I and 24AF1 1, STEAM GENERATOR INLET VALVES to Pretest Positions AND RECORD in Attachment 3.

5.1.23 PLACE the No. 2 Aux Feed Storage Tank Heater Pump in AUTO.

5.1.24 IF 2AF146 was throttled IAW Step 5.1.12, THEN A. CLOSE AND LOCK 2AF144,23 AUX FD PMP TST LN ISO B. LOCK 2AF146, AUX FD PMP TST LN THROT VLV, in the throttled position.

5.1.25 IF a Panametrics Flow Instrument was used in this test, THEN A. PLACE Panametric Power Supply Switch to OFF position.

B. DIRECT Maintenance Technician to disconnect and remove the Panametrics Flow Instrument.

5.1.26 Direct a second Operator to PERFORM Independent Verification of the following:

Calculations performed in Attachment 2, Section 3.0. [C0284]

Component positions specified on Attachment 3. [C0290]

5.1.27 IF this surveillance is being performed as a regular scheduled surveillance

$ OR to verify post-maintenance'operability of the 23 Auxiliary Feed Pump, THEN RECORD 23 Auxiliary Feed Pump Full Flow "Test Results" by initialing the SAT or UNSAT columns using Acceptance Criteria in Attachment 2, Section 2.0. [C06001 Salem2 Page 10 of 24 Rev. 20

S2.OP-ST.AF-0007(Q) 5.3 Completion and Review 5.3.1 COMPLETE Attachment 4, Sections 1.0 and 2.0, AND FORWARD this procedure to the SM/CRS.

5.3.2 SM/CRS PERFORM the following:

A. REVIEW this procedure with Attachments 1-4 for completeness and accuracy.

B. IF all pump Technical Specification Acceptance Criteria (ASMIE) parameters are SAT AND in the ACCEPTABLE RANGE, THEN DECLARE Pump OPERABLE.

C. IF ANY pump Technical Specification Acceptance Criteria (ASME) parameter is UNSAT, in the REQUIRED ACTION RANGE, THEN:

4' DECLARE pump inoperable.

+ EVALUATE Technical Specifications for system operability.

+ INITIATE a NOTF IAW LS-AA-120, Issue Identification and Screening Process.

4 RECORD NOTF number(s) on Attachment 4 in the Comments Section.

(step continued on next page)

Salem2 Page 12 of 24 Rev. 20

s2.OP-ST.AF-0007(Q) 6.0 RECORDS Retain the following IAW RM-AA- 101, Records Management Program:

  • Attachment 1
  • Attachment 2
  • Attachment 3
  • Attachment 4
  • Copy of S2.RA-ST.AF-0007(Q), Inservice Testing - Auxiliary Feedwater System Mode 3 Acceptance Criteria (as applicable)
  • 23 Auxiliary Feed Pump Vibration Analyzer Printout

7.0 REFERENCES

7.1 Updated Final Safety Analysis Report:

  • Section 15.2.8, Loss of Normal Feedwater 7.2 Technical Specifications - Unit 2:
  • 3.7.1.3, Auxiliary Feed Storage Tank

7.3 Procedures

  • ER-AA-321, Administrative Requirements for Inservice Testing
  • NC.NA-AP.ZZ-0050(Q), Station Testing Program NC.NA-AP.ZZ-0022(Q), Measuring & Test Equipment, Lifting & Rigging and Tool Control

7.4 Drawings

205336, Unit 2 Auxiliary Feedwater

7.5 Others

  • Section XI of ASME Boiler and Pressure Vessel Code (1983 Edition with Addenda through Summer 1983)
  • OMa-6, Inservice Testing of Pumps in Light-Water Reactor Power Plants (1987 Edition with 1988 Addenda)
  • Salem Generating Station IST Manual 4 NUREG-1482, Guidelines for Inservice Testing at Nuclear Power Plants Salem2 Page 14 of 24 Rev. 20

s2 .OP-ST.AF-0007(Q)

ATTACHMENT 1 INSTRUMENTATION AND TEST EQUIPMENT DATA (Page I of 3) 1.0 WORK ORDER DATA SAP Order Number(s): Reason for Test Scheduled Surveillance Post-Maintenance Operability Establish New Baseline Data Other (Explain in Comments) 2.0 INSTRUMENT/TEST EQUIPMENT Instrument/ Test Description Calibration Initials Equipment Overdue Date 2FA3969

  • 21 S/G AFW Flow / Channel 2FA1087 21 S/G AFW Flow / Sensor 2FA3970
  • 22 S/G AFW Flow / Channel 2FA1091 22 S/G AFW Flow / Sensor 2FA3971
  • 23 S/G AFW Flow / Channel 2FA1095 23 S/G AFW Flow / Sensor 2FA3972
  • 24 S/G AFW Flow / Channel 2FA1097 24 S/G AFW Flow / Sensor 2SA5740 23 AFW Pump Speed Indication 2SA5961 23 AFW Pump Speed Demand Ind.

Calibration of associated control room console indicator is performed in conjunction with listed channel.

Salem2 Page 16 of 24 Rev. 20

S2.OP-ST.AF-0007(Q)

ATTACHMENT 1 INSTRUMENTATION AND TEST EQUIPMENT DATA (Page 3 of 3) 5.0 CONTROLOTRON/PANAMETRICS DATA (Section 5.1 only)

Description ID Number Calibration Overdue Date Controlotron 2FL14752 Panametrics If required, SC.IC-DC.ZZ-0003(Q), Controlotron Model 960, 990 and 1010 Flow Computer Zero Adjustment has been completed.

OR SC.IC-GP.ZZ-01 77(Q), Panametrics Flow Instrument Data Procedure has been completed.

Performed By: Date: Time:

6.0 POST TEST CALIBRATION RESULTS Description ID Number SAT UNSAT Initials Heise CM or equivalent 0-60/0-100psig.

(1)

Heise CM or equivalent 0-3000psig.

(1)

(1) Post-Test Calibration is NOT required when Electronic Pressure Modules (digital) are used.

Performed by Date M&TE Technician Performed by Date M&TE Supervisor Salem2 Page 18 of 24 Rev. 20

s2.OP-ST.AF-0007(Q)

ATTACHMENT 2 23 AF PUMP SURVEILLANCE DATA (Page 2 of 3) 2.0 VIBRATION READINGS:

Vibration Position 1: TURBINE OUTBOARD Vibration Position 2: TURBINE INBOARD Vibration Position 3: PUTMP INBOARD Vibration Position 4: PUMP OUTBOARD Test Results 23 AF Pump Vibration Results Acceptable Range Required Action SAT UNSAT Non-Technical Specification Acceptance Criteria (Non-ASME)

Vibration Position IA in/sec (1)

Vibration Position 1H in/sec (1)

Vibration Position IV in/sec (1)

Vibration Position 2A in/sec (1)

Vibration Position 2H in/sec (1)

Vibration Position 2V in/sec (1)

Vibration Position 3A in/sec (1)

Technical Specification Acceptance Criteria (ASME)

Vibration Position 3H in/sec (1)

Vibration Position 3V in/sec (1)

Vibration Position 4A in/sec (1)

Vibration Position 4H in/sec (1)

Vibration Position 4V in/sec (1)

Acceptance Criteria: Vibration Results for the 23 Auxiliary Feedwater Pump are within bands specified in S2.RA-ST.AF-0003(Q), Inservice Testing - 23 Auxiliary Feedwater Pump Acceptance Criteria OR data represents new baseline data as determined by the IST Implementation Engineer.

(1) Vibration data is only required to be recorded, when a Vibration Analyzer Printout is NOT available.

Salem2 Page 20 of 24 Rev. 20

s.OP-ST.AF-0007(Q)

ATTACHMENT 3 INDEPENDENT VERIFICATION (Page 1 of 1) toPretest Restoration Component Description Position/ to Pretest Restoration Date Initials Initials Initials IV 23AF5 AF PMP SUCT PRESS TAP 21AF1 I STEAM GENERATOR INLET VALVE STEAM GENERATOR INLET VALVE 23AFI 1 STEAM GENERATOR INLET VALVE 24AFl I STEAM GENERATOR INLET VALVE 2AF144 23 AUX FD PMP TST LN ISO 2AF 146 23 AUX FD PMP TST LN THROT VLV Salern2 Page 22 of 24 Rev. 20

s 2 .OP-ST.AF-0007(Q)

ATTACHMENT 4 COMPLETION SIGN-OFF SHEET (Page 2 of 2)

2.0 SIGNATURES

Print Initials Signature Date INDEPENDENT VERIFICATION:

3.0 SMICRS FINAL REVIEW AND APPROVAL:

This procedure with Attachments 1-4 is reviewed for completeness and accuracy.

All deficiencies, including corrective actions, are clearly recorded in the COIMMENTS Section of this attachment. Technical Specification compliance, procedure compliance, and Acceptance Criteria are evaluated. [C02831 Signature: Date/Time:

SM/CRS 4.0 IST IMPLEMENTATION ENGINEER REVIEW:

Test Results are reviewed for acceptability. If required, revision of Acceptance Criteria is initiated. Forward completed procedure to Operations Staff.

Signature: Date/Time:

IST Implementation Engineer Salern2 Page 24 of 24 Rev. 20