Similar Documents at Salem |
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARLR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0013, In-Service Inspection Activities - 90-Day Report2022-02-10010 February 2022 In-Service Inspection Activities - 90-Day Report LR-N21-0075, Updated Steam Generator Tube Inspection Report - March 2020 to Reflect TSTF-577 Reporting Requirements2021-11-0202 November 2021 Updated Steam Generator Tube Inspection Report - March 2020 to Reflect TSTF-577 Reporting Requirements LR-N21-0076, Updated Steam Generator Tube Inspection Report - Twenty-second Refueling Outage (2R22) to Reflect TSTF-577 Reporting Requirements2021-11-0101 November 2021 Updated Steam Generator Tube Inspection Report - Twenty-second Refueling Outage (2R22) to Reflect TSTF-577 Reporting Requirements LR-N21-0032, Report of Changes, Tests, and Experiments2021-04-0202 April 2021 Report of Changes, Tests, and Experiments LR-N21-0021, In-Service Inspection Activities - 90-Day Report2021-03-11011 March 2021 In-Service Inspection Activities - 90-Day Report LR-N21-0014, Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 20302021-02-16016 February 2021 Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 2030 LR-N20-0062, Steam Generator Tube Inspection Report - March 20202020-09-17017 September 2020 Steam Generator Tube Inspection Report - March 2020 LR-N19-0106, Submittal of Program for Salem Units 1 and 2 Fifth Ten-Year Interval Inservice Testing Program2019-11-25025 November 2019 Submittal of Program for Salem Units 1 and 2 Fifth Ten-Year Interval Inservice Testing Program LR-N19-0089, In-Service Inspection Activities - 90-Day Report2019-09-12012 September 2019 In-Service Inspection Activities - 90-Day Report LR-N19-0011, In-Service Inspection Activities - 90-Day Report2019-02-11011 February 2019 In-Service Inspection Activities - 90-Day Report LR-N18-0054, Steam Generator Tube Inspection Report: Twenty-fifth Refueling Outage (1R25)2018-05-0707 May 2018 Steam Generator Tube Inspection Report: Twenty-fifth Refueling Outage (1R25) LR-N17-0174, Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (2R22)2017-11-21021 November 2017 Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (2R22) LR-N17-0134, In-Service Inspection Activities, 90-Day Report2017-08-28028 August 2017 In-Service Inspection Activities, 90-Day Report LR-N17-0009, Steam Generator Tube Inspection Report - Twenty-fourth Refueling Outage (1R24)2017-01-20020 January 2017 Steam Generator Tube Inspection Report - Twenty-fourth Refueling Outage (1R24) LR-N16-0187, In-Service Inspection Activities - 90-Day Report, Owner'S Activity Report S1RFO242016-10-11011 October 2016 In-Service Inspection Activities - 90-Day Report, Owner'S Activity Report S1RFO24 LR-N16-0025, In-Service Inspection Activities - 90-Day Report2016-02-26026 February 2016 In-Service Inspection Activities - 90-Day Report LR-N15-0037, In-Service Inspection Activities - 90-Day Report2015-02-23023 February 2015 In-Service Inspection Activities - 90-Day Report LR-N14-0232, Steam Generator Tube - Inspection Report - Twentieth Refueling Outage (2R20)2014-10-30030 October 2014 Steam Generator Tube - Inspection Report - Twentieth Refueling Outage (2R20) ML14070A2542014-03-26026 March 2014 Review of the Fall 2012 Steam Generator Tube Inservice Inspections During Refueling Outage 2R19 LR-N13-0256, Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval2013-11-11011 November 2013 Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval LR-N13-0159, In-Service Inspection Activities - 90-Day Report2013-07-24024 July 2013 In-Service Inspection Activities - 90-Day Report LR-N13-0021, Salem Nuclear Generating Station Unit 2 - Inservice Inspection Activities - 90-Day Report2013-02-0101 February 2013 Salem Nuclear Generating Station Unit 2 - Inservice Inspection Activities - 90-Day Report LR-N13-0021, Inservice Inspection Activities - 90-Day Report2013-02-0101 February 2013 Inservice Inspection Activities - 90-Day Report LR-N11-0382, Inservice Inspection Activities - 90-Day Report2012-01-19019 January 2012 Inservice Inspection Activities - 90-Day Report LR-N11-0213, Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval2011-08-11011 August 2011 Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval LR-N10-0361, Request for Relief from ASME Code Pressure Test for Service Water Supply Buried Piping2010-10-12012 October 2010 Request for Relief from ASME Code Pressure Test for Service Water Supply Buried Piping LR-N10-0256, Submittal of Inservice Inspection Activities - 90-Day Report2010-07-20020 July 2010 Submittal of Inservice Inspection Activities - 90-Day Report LR-N10-0007, Additional Information Related to Relief Requests S1-I3R-93, S2-I3R-94, and SC-I3R-952010-01-13013 January 2010 Additional Information Related to Relief Requests S1-I3R-93, S2-I3R-94, and SC-I3R-95 LR-N10-0002, Inservice Inspection Activities - 90-Day Report2010-01-0808 January 2010 Inservice Inspection Activities - 90-Day Report ML1034404472009-12-23023 December 2009 Document: Inservice Testing Auxiliary Feedwater Valves Mode 3. S2.OP-ST.AF-0007Q Rev. 20 LR-N09-0295, Units 1 and 2, Supplement to License Amendment Request S09-06, Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code Components2009-12-21021 December 2009 Units 1 and 2, Supplement to License Amendment Request S09-06, Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code Components LR-N09-0016, Inservice Inspection Activities - 90-Day Report2009-02-0505 February 2009 Inservice Inspection Activities - 90-Day Report LR-N08-0174, Inservice Inspection Activities - 90-Day Report2008-08-0606 August 2008 Inservice Inspection Activities - 90-Day Report ML0807200682008-02-25025 February 2008 Re-Submittal of Inservice Testing Program Relief Requests P01, V03 and V04 LR-N07-0172, Inservice Inspection Activities - 90-Day Report2007-07-20020 July 2007 Inservice Inspection Activities - 90-Day Report LR-N07-0071, Generation - Unit 2, Withdrawal of Inservice Inspection Program Relief Requests S2-I2-RR-B01 and S2-I2-RR-C012007-03-26026 March 2007 Generation - Unit 2, Withdrawal of Inservice Inspection Program Relief Requests S2-I2-RR-B01 and S2-I2-RR-C01 LR-N07-0045, Steam Generator Tube ISI Summary Report2007-03-0101 March 2007 Steam Generator Tube ISI Summary Report LR-N05-0380, Inservice Inspection Activities - 90 Day Report Fourteenth Refueling Outage Salem Generating Station Unit 22005-08-11011 August 2005 Inservice Inspection Activities - 90 Day Report Fourteenth Refueling Outage Salem Generating Station Unit 2 LR-N05-0240, Inservice Inspection Program Relief Request S2-13-RR-F012005-04-24024 April 2005 Inservice Inspection Program Relief Request S2-13-RR-F01 LR-N05-0168, Relief, Inservice Inspection Program Relief Request S2-13RR-F01 Re Requirements for Testing Dynamic Restraints2005-04-0808 April 2005 Relief, Inservice Inspection Program Relief Request S2-13RR-F01 Re Requirements for Testing Dynamic Restraints LR-N04-0328, Inservice Inspection Activities - 90 Day Report Sixteenth Refueling Outage2004-09-0101 September 2004 Inservice Inspection Activities - 90 Day Report Sixteenth Refueling Outage LR-N04-0299, Inservice Inspection Program Relief Requests S1-RR-04-V01 and V022004-07-0909 July 2004 Inservice Inspection Program Relief Requests S1-RR-04-V01 and V02 ML0408000072004-05-0404 May 2004 Review of Inservice Inspection Reports for Steam Generator Tube Inspections Conducted During the 2002 Refueling Outages LR-N04-0130, Update ASME XI Code of Record, Request That Relief Request S1-I3-RR-A13 Be Withdrawn2004-03-24024 March 2004 Update ASME XI Code of Record, Request That Relief Request S1-I3-RR-A13 Be Withdrawn LR-N04-0242, Unit 2 - Inservice Inspection Program, Long Term Plan, Third Interval, Revision 0, Volume a, Drawing ISI301 Through ISI2462003-11-30030 November 2003 Unit 2 - Inservice Inspection Program, Long Term Plan, Third Interval, Revision 0, Volume a, Drawing ISI301 Through ISI246 LR-N04-0424, Unit 2 - Inservice Inspection Program, Long Term Plan, Third Interval, Revision 0, Volume a, Appendix C Through Appendix E2003-11-30030 November 2003 Unit 2 - Inservice Inspection Program, Long Term Plan, Third Interval, Revision 0, Volume a, Appendix C Through Appendix E LR-N02-0453, Supplemental Information Inservice Inspection Program Relief Requests S2-RR-03-V01 and V022003-10-24024 October 2003 Supplemental Information Inservice Inspection Program Relief Requests S2-RR-03-V01 and V02 2024-02-05
[Table view] Category:Letter type:LR
MONTHYEARLR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion LR-N23-0072, Core Operating Limits Report – Cycle 302023-11-0101 November 2023 Core Operating Limits Report – Cycle 30 LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report – Cycle 272023-04-26026 April 2023 Core Operating Limits Report – Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0096, And Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 And Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20222022-12-20020 December 2022 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2022-09-27027 September 2022 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0063, Spent Fuel Cask Registration2022-08-10010 August 2022 Spent Fuel Cask Registration LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0062, Spent Fuel Cask Registration2022-07-21021 July 2022 Spent Fuel Cask Registration LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0043, Core Operating Limits Report - Cycle 292022-05-0909 May 2022 Core Operating Limits Report - Cycle 29 2024-07-24
[Table view] |
Text
PSEG Nuclear LLC P.O. Box 236, Ha ncocks Br idge, NJ 08038-0236
0 PSEG NuclearLLC
ASME Code Case N-532-5 February 10, 2022
LR-N22-0013
U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington DC 20555-0001
Salem Generating Station Unit 2 Renewed Facility Operating License DPR-75 NRC Docket No. 50-311
Subject:
In-Service Inspection Activities - 90-Day Report
This letter submits the Owner ' s Activity Report for In-Service Inspection (ISi) activities conducted at the Salem Generating Station Unit 2 during the twenty-fifth refueling outage.
This report is submitted in accordance with Code Case N-532-5 "Repair/Replacement Activity Documentation Requirements and In-Service Summary Report Preparation and Submission Section XI, Division 1," and within its ninety day reporting requirement.
to this letter conta ins the required Salem Unit 2 Owner ' s Activity Report.
There are no commitments contained in this letter.
Should you have any questions regarding this submittal, please contact Ms. Bernadette Humphrey at 856-339-1308.
Sincerely,
Richard J. Desanctis Plant Manager-Salem Salem Generating Station
Enclosure LR-N22-0013 Page 2
cc: USNRC -Administrator-Region 1 USNRC -Licensing Project Manager-Salem USNRC Senior Resident Inspector Chief, NJBNE Salem Commitment Tracking Coordinator Corporate Commitment Tracking Coordinator Chief Inspector-Occupational Safety and Health Bureau of Boiler and Pressure Vessel Compliance LR-N22-0013
Salem Unit 2 Owner's Activity Report - S2RFO25 In Accordance With ASME Section XI Code Case N-532-5 FORM OAR-1 OWNER'S ACTIVITY REPORT
Report Number~S=2~R=F~O~2=5 ____________________________ _
Plant Salem Generating Station
Unit No. ~2~------ Commercial service date October 13, 1981 Refueling outage no....,,2..,,5<--------or applicable)
Current inspection interval ISi - Fourth (4th), CISI - Third (3 rd )
(1s1, 2nd, 3rd, 41h, other)
Current inspection period ISi - Third (3 rd ), CISI - First (1 st)
(1sl, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans ISi 2004 Edition, CISI 2013 Edition
Date and revision of inspection plans ISi Revision 6 1 August 2021 1 CISI Revision 0 1 February 2021
Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ___ _
Same as ISi and CISI Plans
Code Cases used for inspection and evaluation: N-460, N-532-5, N-566-2, N-613-2, N-648-2, N-695-1, N-696-1, N-716-1.N-722-1, N-731. N-770-5, N-798, N-800 N-845 & N-854 Qf appllcable, Including cases modified by Case N-532 and later revisions)
CERTIFICATE OF CONFORMANCE
I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of -=S:.::2:.:.R.a:F_0;..;25"'------
Conform to the requirements of Section XI. (refueling outage number)
Signed Edie T Giles / ISi Pro ram Owner Date Owner or owner's Desi nee Tille
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission Issued by the National Board of Boller and Pressure Vessel Inspectors and employed by Hartford Steam Boiler Inspection and Insurance Company of Hartford, Connecticut have inspected the Items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described In this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date t(~t ('ZoZ-Z...
- 1
- FORM OAR-1 OWNER'S ACTIVITY REPORT
TABLE1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Exam Item Item Description Evaluation Description Category Number
N-770-5 B-2 Reactor Pressure ASME-IWB-3600 Acceptability Evaluation for Vessel No. 23 Cold inside diameter connected planar flaw, Order Leg Nozzle to Safe-70220273 End Alloy 600 Weld (weld not mitii:1ated)
B-N-3 B13.70 Reactor Pressure Operability Assessment for Degraded Clevis Vessel Lower Radial Insert Bolts at Salem Unit 2, Order 70220082 Support Clevis Assembly at 60°,
two Clevis Insert Bolts degraded
TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description of Work Date Repair/Replacement Class Description Completed Plan Number
3 Through-wall leak Replaced 3/8" stainless 10/22/2020 60147894 identified on 3/8" steel capillary tubing at stainless steel capillary leak location.
t, Ibing between panel 234 and root valve 22SJ24 caused by fretting.
3 3/8" stainless steel Replaced Valve 2SW340 02/12/2021 60148597 instrument line to and 3/8" stainless steel pressure gauge tubing to pressure gauge 2PL9283 was found 2PL9283.
broken off at its tie in connection at outlet of isolation valve 2SW340.
MC License Renewal Performed weld overlay of 01/25/2022 60142730 inspection of 6 inch by 6 inch area to containment liner restore liner plate to beneath insulation nominal thickness.
system was found corroded just below design minimum wall thickness, not through wall.
- 2 -