IR 05000528/1974002
Similar Documents at 05000000, Palo Verde | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217A8641999-10-0606 October 1999
[Table view]Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20138K0131997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970324-28 ML20138K0091997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (as-given Operating Exam) for Tests Administered on 970324-28 ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20135E7161997-03-0303 March 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961118-22 ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20236U9391995-12-20020 December 1995 Discusses Oi,Region IV Rept of Investigation,Dtd 940511, Case 5-93-023R,which Reported OI Investigative Efforts Re Alleged Employee Discrimination at Plant Units 1,2 & 3.Rept Was Sent to Us Attorney Office in Phoenix,Az in May 1994 ML20138E4151994-09-0707 September 1994 Requests That PM for Each CE Plant Review Licensee Response to GL 89-19 to Ensure That 901031 Submittal Applicable to Plant & That Licensee Response Addressed Operator Training Procedures.Ser,Sample Closeout & Sample RAI Ltrs Encl ML20138F9871994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by IA-96-341, Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr1994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr NUREG-1231, Forwards Documents Referenced in Suppl 16 to NUREG-09331993-11-29029 November 1993 Forwards Documents Referenced in Suppl 16 to NUREG-0933 ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20044C6571993-04-12012 April 1993 Requests Transfer of Lead Responsibility to NRR for Review of Licensee Evaluation of Battery Seismic Qualification (Mncr 93-PK-1003) ML20198E3271992-10-20020 October 1992 Notification of Significant Licensee Meeting W/Util on 921027 to Discuss Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Programs within Security Dept ML20126L8441992-09-14014 September 1992 Provides Status Rept Concerning Actions Re Det Performed at Plant ML20127C2461992-03-0202 March 1992 Forwards AEOD SALP Input for Facilities in Support of Ongoing SALP Reviews.Two of Six Important Operating Events Involved Deficiencies of Reactor Power Cutback Sys Which Relies on Proper Functioning of Steam Bypass to Condenser ML20127B6281990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility IA-92-218, Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility1990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility ML20127B5671990-12-12012 December 1990 Forwards NRR Input for SALP Rept,Per NRC Ofc Ltr 907,Rev 1 ,NRC Manual Chapter 0516 & 901120 Memo ML20059M2041990-09-27027 September 1990 Notification of Significant Licensee Meeting W/Util on 901003 to Discuss Licensee Response to Diagnostic Evaluation Team Findings & Overall Status of Programs. Addl NRC Attendees Should Be Made Known by 901002 ML20059L6531990-09-20020 September 1990 Notification of 900921 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives & Status in Area of QA ML20059D6361990-08-27027 August 1990 Notification of 900831 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Medical Qualifications & Exams of Licensed Operators ML20127B4571990-08-24024 August 1990 Comments on Response to Facility Diagnostic Evaluation Team Rept.Suggests That Region V Followup & Closely Monitor Development & Implementation of Specific Tasks Which Will Address Team Findings ML20058M3441990-08-0606 August 1990 Forwards List of Open Items in Sims for Plant.Documented Basis Exists for Closure of TMI Related Items at Plant ML20044A9321990-07-0606 July 1990 Notification of 900710 Enforcement Conference W/Util to Discuss Emergency Lighting & Mgt Meeting Re Licensed Operator Medical Records.Meeting Agenda Encl ML20126L8271990-06-14014 June 1990 Provides Summary of Schedule & Status of Items Re Det of Plant Performed by Aeod,In Response to 900314 Memo ML20042F4901990-05-0202 May 1990 Notification of 900502 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives in Fire Protection,Security & Procurement ML20063P9191990-04-12012 April 1990 Reviews 900111 Submittal of Draft Info Notice Entitled, Adequacy of Emergency & Essential Lighting. Info Notice Not Warranted as Incident Found to Be Isolated Case ML20033H1951990-04-0404 April 1990 Notification of 900410 Meeting W/Util in Phoenix,Az to Discuss Mgt Meeting,Including Status of Facility Restart Activities IR 05000528/19900041990-03-21021 March 1990 Notification of 900330 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Repetitive Occurrences of Inadequate Access Controls for Locked High Radiation Areas Documented in Insp Repts 50-528/90-04 & 50-528/90-13 ML20217C1001990-03-20020 March 1990 Forwards Listed Info Re Qualification of Emergency Lighting Sys Installed at Facility,Per Request ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20127B2171990-01-18018 January 1990 Forwards AEOD Input for Commissioner Curtiss Visit to Plant on 900201,consisting of Summary of Operating Experience from Oct 1988 to Dec 1989 ML20127B1681989-11-0909 November 1989 Forwards NRR Input to SALP for Facilities.Category 2 Rating Assigned in Functional Areas of Plant Operations, Radiological Controls,Emergency Preparedness,Security & Safety Assessment/Quality Verification ML20043F4151989-10-0404 October 1989 Discusses Review Re Disposal of Radioactive Cooling Tower Sludge in Sludge Landfill of Palo Verde.Util Agrees W/ Arizona Radiation Regulatory Agency Conclusions ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20246N7371989-08-29029 August 1989 Notification of Maint Team Insp Meeting on 890901 W/Util in Phoenix,Az to Discuss Status of Licensee Commitments from 890605 Mgt Meeting in Consideration of Unit 3 Restart ML20127B1401989-08-0707 August 1989 Forwards for Info & Consideration for Info Notice,Lers Describing Potter & Brumfield Relay Problems & Atmospheric Dump Valve Deficiencies.Info Provided as Part of AEOD Function to Identify Potential Adverse Events ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization 1999-08-27 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217A8641999-10-0606 October 1999
[Table view]Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20138K0091997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (as-given Operating Exam) for Tests Administered on 970324-28 ML20138K0131997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970324-28 ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20135E7161997-03-0303 March 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961118-22 ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20236U9391995-12-20020 December 1995 Discusses Oi,Region IV Rept of Investigation,Dtd 940511, Case 5-93-023R,which Reported OI Investigative Efforts Re Alleged Employee Discrimination at Plant Units 1,2 & 3.Rept Was Sent to Us Attorney Office in Phoenix,Az in May 1994 ML20138E4151994-09-0707 September 1994 Requests That PM for Each CE Plant Review Licensee Response to GL 89-19 to Ensure That 901031 Submittal Applicable to Plant & That Licensee Response Addressed Operator Training Procedures.Ser,Sample Closeout & Sample RAI Ltrs Encl IA-96-341, Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr1994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr ML20138F9871994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by NUREG-1231, Forwards Documents Referenced in Suppl 16 to NUREG-09331993-11-29029 November 1993 Forwards Documents Referenced in Suppl 16 to NUREG-0933 ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20044C6571993-04-12012 April 1993 Requests Transfer of Lead Responsibility to NRR for Review of Licensee Evaluation of Battery Seismic Qualification (Mncr 93-PK-1003) ML20198E3271992-10-20020 October 1992 Notification of Significant Licensee Meeting W/Util on 921027 to Discuss Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Programs within Security Dept ML20126L8441992-09-14014 September 1992 Provides Status Rept Concerning Actions Re Det Performed at Plant ML20127C2461992-03-0202 March 1992 Forwards AEOD SALP Input for Facilities in Support of Ongoing SALP Reviews.Two of Six Important Operating Events Involved Deficiencies of Reactor Power Cutback Sys Which Relies on Proper Functioning of Steam Bypass to Condenser IA-92-218, Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility1990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility ML20127B6281990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility ML20127B5671990-12-12012 December 1990 Forwards NRR Input for SALP Rept,Per NRC Ofc Ltr 907,Rev 1 ,NRC Manual Chapter 0516 & 901120 Memo ML20059M2041990-09-27027 September 1990 Notification of Significant Licensee Meeting W/Util on 901003 to Discuss Licensee Response to Diagnostic Evaluation Team Findings & Overall Status of Programs. Addl NRC Attendees Should Be Made Known by 901002 ML20059L6531990-09-20020 September 1990 Notification of 900921 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives & Status in Area of QA ML20059D6361990-08-27027 August 1990 Notification of 900831 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Medical Qualifications & Exams of Licensed Operators ML20127B4571990-08-24024 August 1990 Comments on Response to Facility Diagnostic Evaluation Team Rept.Suggests That Region V Followup & Closely Monitor Development & Implementation of Specific Tasks Which Will Address Team Findings ML20058M3441990-08-0606 August 1990 Forwards List of Open Items in Sims for Plant.Documented Basis Exists for Closure of TMI Related Items at Plant ML20044A9321990-07-0606 July 1990 Notification of 900710 Enforcement Conference W/Util to Discuss Emergency Lighting & Mgt Meeting Re Licensed Operator Medical Records.Meeting Agenda Encl ML20126L8271990-06-14014 June 1990 Provides Summary of Schedule & Status of Items Re Det of Plant Performed by Aeod,In Response to 900314 Memo ML20042F4901990-05-0202 May 1990 Notification of 900502 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives in Fire Protection,Security & Procurement ML20063P9191990-04-12012 April 1990 Reviews 900111 Submittal of Draft Info Notice Entitled, Adequacy of Emergency & Essential Lighting. Info Notice Not Warranted as Incident Found to Be Isolated Case ML20033H1951990-04-0404 April 1990 Notification of 900410 Meeting W/Util in Phoenix,Az to Discuss Mgt Meeting,Including Status of Facility Restart Activities IR 05000528/19900041990-03-21021 March 1990 Notification of 900330 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Repetitive Occurrences of Inadequate Access Controls for Locked High Radiation Areas Documented in Insp Repts 50-528/90-04 & 50-528/90-13 ML20217C1001990-03-20020 March 1990 Forwards Listed Info Re Qualification of Emergency Lighting Sys Installed at Facility,Per Request ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20127B2171990-01-18018 January 1990 Forwards AEOD Input for Commissioner Curtiss Visit to Plant on 900201,consisting of Summary of Operating Experience from Oct 1988 to Dec 1989 ML20127B1681989-11-0909 November 1989 Forwards NRR Input to SALP for Facilities.Category 2 Rating Assigned in Functional Areas of Plant Operations, Radiological Controls,Emergency Preparedness,Security & Safety Assessment/Quality Verification ML20043F4151989-10-0404 October 1989 Discusses Review Re Disposal of Radioactive Cooling Tower Sludge in Sludge Landfill of Palo Verde.Util Agrees W/ Arizona Radiation Regulatory Agency Conclusions ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20246N7371989-08-29029 August 1989 Notification of Maint Team Insp Meeting on 890901 W/Util in Phoenix,Az to Discuss Status of Licensee Commitments from 890605 Mgt Meeting in Consideration of Unit 3 Restart ML20127B1401989-08-0707 August 1989 Forwards for Info & Consideration for Info Notice,Lers Describing Potter & Brumfield Relay Problems & Atmospheric Dump Valve Deficiencies.Info Provided as Part of AEOD Function to Identify Potential Adverse Events ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization 1999-08-27 |
Inspection Report - Palo Verde - 1974002 | |
---|---|
Assessments
|
Text
.
=
',
~
. ~.
,
_
UNITCS STATES s
[.,,2 Mg ATOMIC ENERGY OOMMISSION
% '
\\
Din ECTOR ATE OF FtEGULATORY O*ER ATIONS fg '
'.f
'
REGION V
,
1990 N. CALIFORNIA BOULEVARD d
s
- -
s
WALNUT CREEK PLAZA SulTE 202
% '"' N-/
f
~
W ALNUT CREEM. C ALIFORNI A. 94596 T E L g en o s.g.
( 415 ). J4.a le t tiDV 1 8 1974 H. D. Thornburg, Chief, Field Support & Enforcement Br.
Directorate of Regulatory Operations, HQ ARIZ0"A PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION UNITS 1-3 DOCKET NOS. 50-528, -529, -530
.
Attached is our report of the " initial" QA inspection on November 4-5, 1974 of the icplementation of the QA program by APS for the Palo Verde proj ect. He found that the applicant has implemented the QA program for
,
design and procurement activities consistent with the status of the proj ect. No violations of AEC requirements were identified during the inspection.
.
~
'
Mc.? t.
G.S. Spencer, Chief Reactor Construction and Operations Branch Enclosure:
RO Inspection Report No. 50-528, 529, 530/74-02 cc w/ enclosure:
G. Smith, RO:HQ RO:HQ (5)
RO Fil DR Central riles Regulatory Standards (3)
Directorate of Licensing (13)
'
.
i-
- :
'
...A...........
.. '.
.
!
O E G t'/ C i.~.>.' $2';;
03Al202L'
j l
8508150300 850703 GH-293 WR l
.
-