ML20059M204
| ML20059M204 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/27/1990 |
| From: | Richards S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| NUDOCS 9010030275 | |
| Download: ML20059M204 (3) | |
Text
.
9 780
+
UNITED STATES
[
',g NUCLEAR REGULATORY COMMISSION NEGION V j
t.
t e,
,f 14b0 MARIA LANE, SUITE 210 0
WALNUT CREEK.CA'.lFORNid.94bE
%,..... g SEP 2 71990 i
NOTICE OF SIGNIFICANT MEETING i
Name of Licensee:
Name of Facility:
.51o Verde Nuclear Generating Station Units 1, 2,'and 3-4 Docket hos.:
50-528, 50-529, 50-530 Date and Time Wednesday, October 3, 1990, 8:30 a.m.
of meeting:
Location of Meeting:
NRC Region V Office - Walnut Creek', California Purpose of Meeting:
Management Meeting to discuss licensee's response to the Diagnostic Evaluation Team findings and.
overall status of programs-NRC Attendees:
J. Martin, Regional Administrator R. Zininerman, Director, Division of Reactor Safety and Projects R. Scarano, Director, Division' of Radiation Safety and Safeguards S. Richards, Chief, Reactor Projects Branch D. Kirsch, Chief, Reactor Safety Branch H. Wong, Chief, Reactor Projects.Section 11 S. Peterson, Project Manager, NRR.
e D. Coe, Senior Resident Inspector W. Ang, Project Inspector Licensee Attendees:
W. F. Conway, Executive Vice President, Nuclear E. C. Simpson, Vice President, Engineering and Construction J. N. Bailey, Vice President, Nuclear Safety.and Licensing
.B. E. Ballard,. Director, Quality Assurance W. C. Marsh, Director, Plant Operations and Maintenance-G. R. Overbeck, Director, Site Technical Support P. W. Hughes, General Manager, Site Radiation-Protection T. R. Bradish, Manager, Compliance 1
O HC.
i )
G E ct
~
9010030275 900927 PDR ADDCK 05000528' P
PNV '
.2 NOTE: Attendance at this meeting by HRC personnel other than those listed above should'be made known by. October 2,1990,12:00. noon via a telephone call to H. Wong,= FTS 463 3733.
Approved by: M
-S. A. Richards,_ Chief Reactor-Projects Branch Division of_ Reactor _ Safety'.
'and Projects.
t Distribution:
NRC Attendees listed above
{
J. Sniezek, DEDO T. Murley, NRR E. Jordan, AE0D
/
l S. Rubin,"AE00-
-J. Partlow, NRR S. Peterson, NRR J
C. Tranmell, NRR d
W. Russell, NRR/ADT J. Martin, RV B. - Faulkenberry, RV l
'G. Cook, RV' l
G. Yuhas, RV, DRSS
N R. Rosano, RV, DRSS i
=M. Slosson, OEDO l
PDR 1
-I i
i i
f l'
t t
2
.e.
9 4
'c NOTE: Attendance'.at' this mee' ting by NRC personne1' other than those listed.
I above should be maoe known by October 2, 1990,-12:00! noon via a telephone a
call to H. Wong, FTS 463-3733.
-Approved by: Ok I
- 3. A. Richards, Chief d
Reactor Projects Branch
- l Division'of Reactor Safety
'I and Projects Distribution..
l NRC Attendees: listed above 1
J. Sniezek, DEDO
'l T.- Murley, NRR E. Jordan, AE00 1
S. Rubin, AE0D'.
l J, Partlow,. NRR -
i S. Peterson, NRR
- 1 C. Tranne11, NRR =
W. Russell, NRR/ADT.
j J.!: Martin, RV.
B. Faulkenberry, RV G. Cook, RV
~
G.:Yuhas, RV, DRSS
.R.' Rosano, RVi DRSS.
M. Slosson',.,DED0 1
PDR l
c t
1 l
W
// W sb
\\
Ang N Wong Richards j
9 w/pa 7 /).7/9 0 9 h1 ho
/
R EST COPYJ 4) EST COPY] REQUEST COPY],
S / _ NO ES / N0 -YES / N0
?
f5EN T0 PDR]
(ES / N0 )
l f
'