ML20134A594

From kanterella
Jump to navigation Jump to search
Forwards Const Insp Rept 50-389/71-01 on 710929-1001.Util Requested Discontinuance of Application Review for Facility. Therefore,Insp Will Not Be Followed Up
ML20134A594
Person / Time
Site: 05000000, Saint Lucie
Issue date: 12/27/1971
From: Long F
US ATOMIC ENERGY COMMISSION (AEC)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML17198A269 List: ... further results
References
FOIA-84-293 15388, NUDOCS 8508150351
Download: ML20134A594 (1)


Text

.

3.*,

UNIfLO STATES h

't ATOMIC ENERGY COMMISSION g

DlVislON OF COMPLIANCE.

i e, e

e i

M E G10 N 16 = 'lulT E die

,231 P E AC Hf M E R %f HE ET. NCMT Hwt 47,

,,L,,,,,,,

,,u,,,,,,,,g, v

Af n., ANT A, oc onol A 10303 Dacomber 27, 1971 J. D. llendornon, Chief, Ranctor Construction D anch $

Division of Compliance, Headquarters FLORIDA POWER AND LIGlT C0!4PANY ('JUTCli1NSON ISLAND NO. 2)

LICENSE NO. PENDING, DOCKET NO. 50-389 Attached Construction Inspection Report No. 50-389/71 1 covering the quality Annuranco Audit conducted on Septomber 29-October 1,1971, ts

(,e information.

Deficiencios were brought to the attention of FP&L management on October 1,1971, by the inspectors as unrosolved ite.:ca.

Subsequent to the inspection, we were advised that FP&L had roquanted DRL to discontinua review of application for thin facility.

We,thoroforo, did not send a lector to the applicant regarding this inspection and plan no further followup action.

Ybb F. J. Long a CO III FJL Senior Reactor Inr octor Enclosura:

C0 Rpt No. 50-389/71-1 (Crossman) cc w/onc1:

C. G. Cano, DRS (3)

R.11. Enge lken, CO

11. R. Danton, DRS (2)

J. P. O ' Ro111y, C0 : 1 R. 3. Doyd, DRL (2)

D. II. Grier, C0 III B. C. DeYoung, DRL (2)

J. W. Flora, CO IV D. J. Skovholt DRL (3)

R. W. Smith, 00 V A. G iamb us s o, C0 DR Contral Files L. Kornblich, J r., CO j

0$001D03D1 0D0703 pDH FOIA LCt0HiUU4-2'/3 PDU FotA-184-M3 1 5288 L[102.

- ----- -