._.

APPENDIX A Ari:ena Public Service Company P. O. Box 21666 Phoenix, Ari:ena 55036 Docket No. 50-528 Construction Permit No. CPPR-141 NOTICE OF VIOLATI0ii Based on tne results of an NRC inspection conducted on December 14-17, 1976, it appears that certain of your activities were not conducted in full cortpliance with NRC requirements as indicated below:

A.

10 CFR 50, Appendix B, Criterion XV, as implemented by PSAR (Chapter 17), requires that nonconfonning materials be controlled to prevent their inadvertent use or installation.

Contrary to the above requirement, on December 14,1976, concrete witn nonconfoming slump, identifisc by testing performed on batch trip ticket lios. 00611, 00622 and 00634, was placed in the Unit No.1 Reactor Pit Basemat (Lift 1C010-0).

This is an infraction.

B.

10 CFR 50, Appendix B, Criterion V, as implemented by PSAR (Chapter.

17), requires that activities affecting quality be accomplished as prescribed oy documented instructions and procedures.

Construction Specification No.13-CM-191 (Testing of Concrete Materials) requires that testing for air content, temperature and slump be accomplished once for every fifty cubic yards placed and testing for compressive strength be perfomed for every one hundred cubic yards placed.

Contrary to the above requirements, on December 14, 1976, tests for air content, temperature, slump and compressive strength were perforced less frequent than specified on concrete placed in the Unit ilo. 1 Reactor Pit Basemat (Lift IC010-0).

This is an infraction.

C.

10 CFR 50, Appendix B, Criterion VI, as implemented by the PSAR (Chapter 17),thePaloVerdeNuclearGenerating)StationQAManual (QAD 6.0), and the Bechtel Procedures (WP/P 3.0, requires that changes to documents, such as drawings, be distributed to the work locations.

Contrary to tne above requirement, change DCII No. S to drawing 13-C-ZAS-116. Revision 4, dated November 4, 1976, had not been distri-buted to tne work stations by December 15,1976.

This is an infraction.

8500150566 050703 PDR FOIA LEICHTOO4-293 PDH

-