IE Inspection Repore No. 5b-389/75-3
o_
-
Licensees norida Power and Light Company
-
4200 n agler Street
,
F. O. Box 013100-
.
Miami, norida 33101
.
!
Facility Names St. Lucie Unit 2 l
Docket No.:
50-389 I
License No.:
Not Issued
~
~
.
Category:
Al
.
-
Location: Hutchinson Island, Morida
.
.
.
e Type of Licenses 800 Hva (CE)
Type of Inspection:
Routine, hnannounced Pre-Construction
Dates of Inspection:
August 11-14, 1975
-
,
Dates of Previous Inspection: April 8-10, 1975 l*
Principal Inspector:
L. E. Foster, Reactor Inspector
,
Facilities Section Facilities Construction Branch
-
.
.
-
. Accompanying Inspector:
R. W. Wright, Reactor Inspector Engineering Section
'
Facilities Construction Branch
,
i
Other Accompanying Personnel None I
Q 7 M/7I
.
Principal Inspector:
M.
- Date L. E. Foster, Reactor Inspector
,
Facilities Section Facilities construction Branch 2,u M
7['
'
Reviewed by:
/ Date
]
J. C. B ti Seniotsinspector Facil es Section
,
b Faci ies Construction Branch
.s
-
)1 LuflO9 J
d 0500100490 000703
LEICHT004-293 PDR
!
,,,
.
a
/pg, ggt
-
.,
- 9 oo *e = =
+e
-*se= = * *
me - =-
.
si a
_e---
nemo ammm senmm
--
"
-
!: :,'
.
O
. J. '
.
.
-
.
.
.
..
'
'
'
IE Ept. No. 50-389/75-3-2-
'.
.
-
~
.
.
-
i
.-
j{
..
-
SUIMARY OF FINDINGS g
...
,.
..
.
..
.,,
..
.
.
i I.
Deviations
-
.
-
,
n===
l
-
,
]
II. Maensee Action *on Previously Identified Deviations
-
None i
I III. New Unresolved Items
,
'
.
-
+
yone
't IV. Status of Previously Reported Unresolved Items
,
.
Nome
,
.
V.
Desian Channes
'
'
Mone
-
,
".
VI. Unusual Occurrences
.
.
-
.
None
,
VII.
Other Sinnificant Findinas
Excavation work *under an LWA is not expected to start until after mid-September 1975.
.
'
The licenses stated that FP&L had submitted a QA Topical Report to Licensing on July 28, 1975.
TP&L intends to revise the present QA
Hanual to be compatible with the Topical Report and will replace Chapter XVII of the SAR with the Top 1 cal Report, if approved.
,
VII7.. Manaaement Interview _
,
A management interview wu held with Mr. J. E. Vessely, Manager. QA,
'
and members of his staff at the conclusion of the inspection.
The results and findings of the inspection were discussed in detail.
.
ei e
.
""
- 'M MN- -
>=Eree emespum. se_-
- e 4 a e e
,,,,
,,
_
.
.
o
.y
- ,,..
.
.
.
.
.
.
.
<
.,
..
,
.
s
~
'
'
~
IE Ryt. No. 50-389/75-3 I-1
-
e
,
... -
DETAILS I Prepared by h 7t
.
.
M i
R.W.,WrightdRgctorInspep, tor Data
,
.
Engineering Section Facilities Construction Branch
.
.
i 2'E -kK i 9Mr
'
-
L. E. Foster, Reactor Inspector Date Facilities Section
-
'
Facilities Construction Branch
'.
.
Dates of Inspection: Augus,11-14, 1975
Reviewed by:
Th'.
d CA /
b-
'
.
,
L. L. Beratan, Senior Inspector Data
'
.
'
Engineering Section
-
.
,
Facilities Construction Branch 1.
Individuals contacted Florida Power and Liaht Company (FP&L)
J. E. Vessely - Manager, QA
.
,
,
H. D. Mantz - Assistant QA Manager
.
A. M. Anderson - QA Engineer, Electrical
.
,,
,
H J. R. Forbes - QA Engineer, Civil
.-
C. F. Herron - QA Engineer, Civil D. Stone - Project QC Supervisor D. L. Hartsfield - Superintendent, Construction QC
'
,
,
2.
General
,
,,
The commencement of work activities associated with the LWA-2
'
authorization has been delayed until after September 15, 1975.
.
'
3.
Organization & Functions
'
,
.
The QA and QC organization charts have not changed since the
,
previous inspection.
J. E. Vessely, formerly Assistant QA Hanager has been appointed to the position of Manager, QA.
,
The licensee has added a position titled "QC Coordinators." The per-sonnel filling these positions are engineering graduates and their function is to supply technical support.
They review procedures, specifications and instructions to ensure a quality product.
FP&L's QC personnel will be responsible for preparing construction sita proceduros and administrativa sito proceduros and will also bn responsible for performing all the inspection activities and specify
'
.
s
-*
woe s eerieasenem eu e saegren erne i sa
.*
.
.
,
.
L. :.'
O Q.
-
.
.
.
.
.
.
.
.
.
.
-
.
,.
.
.
.
,
.
, -2 IE Ryt. No. 50-339/75-3 l
I
..
.
.
.
'
g l
hold and iritness poin'es' a's requir'd. The QA organization and functions e
j at the site will be the.some as that used during construction of St. Lucia 1.
I Ebasco will have the responsibility for producing process contr'o1 documente and qualifying procedures for their site construction
,
personnel. These procedures will be approved by the licensee.
,
.
'
l j
4.
Civil QC Oreanisation Conversation with FF&L's Project QC Supervisor disclosed that an Area
._
- QC supervisor (Civil) had been hi*ed and is scheduled to report to r
the site shortly. The licenses has contracted with U. 5. Testing to j
perform all site laboratory testing and field inspection (QC functions)
,
.
for the soilsaand concrete phases of construction.
Tentatively, the
,
i
FF&L organisation staffing calls for three Level III U. 5. Testing
..
inspectors (field, concrete, soils) certified in accordance with QI2.1
'
,
f to supervise and direct Level II and Level I inspectors in their j
respective tasks.
Presently, two of the three Level III inspector positions (field and soils) have been filled and two Level I soil
'
}
inspectors are on site.
It is noted that the U. 5. Testing personnel
.
will be required to meet FF&L standards plus the N45.6 requirements.
'
FF&L will also review and endorse all U. S. Testing proceduies used
,
at the site.
.
l 5.
Other Discipline QC
.
!
.
.
,
The mechanical, electrical and instrumentation QC functions will be
!
performed similar to the aforementioned civil QC functions.
Either U. S. Testing or some other qualified organisation will supply personnel
.
who will be under the supervision of the licensee's QC area supervisors.
.
6.
oc specification and Procedure Review
-
.
,
The following approved specifications and quality control instructions and procedures for groundwater and earthwork operational the manufacturing, placing, testing and control of structural grada concrete: the furnishing, fabrication and delivery of reinforcing steelt and the certification of
,
QC inspection personnel were examined for conformance to SAR comitments and applicable codes and standards.
.
Specification / Quality Instruction No.
,QQ,
.
.
FLO 2998.471 R2 Excavation and Backfill FLO 2998.472 R4 Dewatering FLO 2998.473 R1 Concrete FLO 2998.47.4 R2 Concrete Reinforcing Steel
.
.
'
.
t e est em se o ansammagrose 5 e, e - e e + een e a r
-4 4 asu.. a, as-- e
.ee a---
. n
....
O 3-
.s
-
.
.
.
.
.
-
.
..
.
.
,
,
,
,
,
e*
,
IE Ryt. No. 506-389/75-3 I-3
-
-
,
e.**',
,,
.
'
...Certifica$1on of Flant Construction q12.1 o
..
.-
,
QC Inspection Personnel q110.1 General 1%structions fo,r Conduct
,
'
'
of Inspections
,
q110.8 Inspection of Dewaterin's and
,
Controlled Watering
-
.
q111.1
Calibration of Tools, Gauges and Test Devices
,
No itens of procedural noncompliance were identified.
'In addition to the above review, several prepared but as yet not
-
.
approved FF&L quality control instructions pertinent to the LWA
,
were reviewed.
They are:
QIl0.2 Batch Plant Inspection q110.7 Inspection of Fill Compaction
q110.10 Inspection of Excavations 7.
Quality Instructions and Procedures
.
.
The licenses has prepared a list of quality instructions for use during construction.
At present there are 60 QI's under development.
Eighteen
'
,
of these QI's had been released as of August 12, 1975.
'
-
-