Preconst Insp Rept 50-389/75-03 on 750811-15.No Deviations Noted.Major Areas Inspected:Qa Program
ML20134B004
Person / Time
Site: 05000000, Saint Lucie
Issue date: 09/12/1975
From: Bryant J, Foster L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17198A269 List: ... further results
References
FOIA-84-293 50-389-75-03, 50-389-75-3, NUDOCS 8508150490
Download: ML20134B004 (5)


Text

.

,.

-

UNITED STATES

,

. *

-

.

'

.I'

NUCLgAR RCULATORY COMMISSION

.

naGloNIt

,

-

  • 330 PEACHTREE STREET. N. W. SUITE S10 ATLANTd[ GEORGIA 30303...

-

-.o

'

.

.

"

'f'

IE Inspection Repore No. 5b-389/75-3

o_

-

Licensees norida Power and Light Company

-

4200 n agler Street

,

F. O. Box 013100-

.

Miami, norida 33101

.

!

Facility Names St. Lucie Unit 2 l

Docket No.:

50-389 I

License No.:

Not Issued

~

~

.

Category:

Al

.

-

Location: Hutchinson Island, Morida

.

.

.

e Type of Licenses 800 Hva (CE)

Type of Inspection:

Routine, hnannounced Pre-Construction

Dates of Inspection:

August 11-14, 1975

-

,

Dates of Previous Inspection: April 8-10, 1975 l*

Principal Inspector:

L. E. Foster, Reactor Inspector

,

Facilities Section Facilities Construction Branch

-

.

.

-

. Accompanying Inspector:

R. W. Wright, Reactor Inspector Engineering Section

'

Facilities Construction Branch

,

i

Other Accompanying Personnel None I

Q 7 M/7I

.

Principal Inspector:

M.

  1. Date L. E. Foster, Reactor Inspector

,

Facilities Section Facilities construction Branch 2,u M

7['

'

Reviewed by:

/ Date

]

J. C. B ti Seniotsinspector Facil es Section

,

b Faci ies Construction Branch

.s

-

)1 LuflO9 J

d 0500100490 000703

't PDR FOIA g

LEICHT004-293 PDR

!

,,,

.

a

/pg, ggt

-

.,

- 9 oo *e = =

+e

-*se= = * *

me - =-

.

si a

_e---

nemo ammm senmm

--

"

-

!: :,'

.

O

. J. '

.

.

-

.

.

.

..

'

'

'

IE Ept. No. 50-389/75-3-2-

'.

.

-

~

.

.

-

i

.-

j{

..

-

SUIMARY OF FINDINGS g

...

,.

..

.

..

.,,

..

.

.

i I.

Deviations

-

.

-

,

n===

l

-

,

]

II. Maensee Action *on Previously Identified Deviations

-

None i

I III. New Unresolved Items

,

'

.

-

+

yone

't IV. Status of Previously Reported Unresolved Items

,

.

Nome

,

.

V.

Desian Channes

'

'

Mone

-

,

".

VI. Unusual Occurrences

.

.

-

.

None

,

VII.

Other Sinnificant Findinas

Excavation work *under an LWA is not expected to start until after mid-September 1975.

.

'

The licenses stated that FP&L had submitted a QA Topical Report to Licensing on July 28, 1975.

TP&L intends to revise the present QA

Hanual to be compatible with the Topical Report and will replace Chapter XVII of the SAR with the Top 1 cal Report, if approved.

,

VII7.. Manaaement Interview _

,

A management interview wu held with Mr. J. E. Vessely, Manager. QA,

'

and members of his staff at the conclusion of the inspection.

The results and findings of the inspection were discussed in detail.

.

ei e

.

""

    • 'M MN- -

>=Eree emespum. se_-

  • e 4 a e e

,,,,

,,

_

.

.

o

.y

,,..

.

.

.

.

.

.

.

<

.,

..

,

.

s

~

'

'

~

IE Ryt. No. 50-389/75-3 I-1

-

e

,

... -

DETAILS I Prepared by h 7t

.

.

M i

R.W.,WrightdRgctorInspep, tor Data

,

.

Engineering Section Facilities Construction Branch

.

.

i 2'E -kK i 9Mr

'

-

L. E. Foster, Reactor Inspector Date Facilities Section

-

'

Facilities Construction Branch

'.

.

Dates of Inspection: Augus,11-14, 1975

Reviewed by:

Th'.

d CA /

b-

'

.

,

L. L. Beratan, Senior Inspector Data

'

.

'

Engineering Section

-

.

,

Facilities Construction Branch 1.

Individuals contacted Florida Power and Liaht Company (FP&L)

J. E. Vessely - Manager, QA

.

,

,

H. D. Mantz - Assistant QA Manager

.

A. M. Anderson - QA Engineer, Electrical

.

,,

,

H J. R. Forbes - QA Engineer, Civil

.-

C. F. Herron - QA Engineer, Civil D. Stone - Project QC Supervisor D. L. Hartsfield - Superintendent, Construction QC

'

,

,

2.

General

,

,,

The commencement of work activities associated with the LWA-2

'

authorization has been delayed until after September 15, 1975.

.

'

3.

Organization & Functions

'

,

.

The QA and QC organization charts have not changed since the

,

previous inspection.

J. E. Vessely, formerly Assistant QA Hanager has been appointed to the position of Manager, QA.

,

The licensee has added a position titled "QC Coordinators." The per-sonnel filling these positions are engineering graduates and their function is to supply technical support.

They review procedures, specifications and instructions to ensure a quality product.

FP&L's QC personnel will be responsible for preparing construction sita proceduros and administrativa sito proceduros and will also bn responsible for performing all the inspection activities and specify

'

.

s

-*

woe s eerieasenem eu e saegren erne i sa

.*

.

.

,

.

L. :.'

O Q.

-

.

.

.

.

.

.

.

.

.

.

-

.

,.

.

.

.

,

.

, -2 IE Ryt. No. 50-339/75-3 l

I

..

.

.

.

'

g l

hold and iritness poin'es' a's requir'd. The QA organization and functions e

j at the site will be the.some as that used during construction of St. Lucia 1.

I Ebasco will have the responsibility for producing process contr'o1 documente and qualifying procedures for their site construction

,

personnel. These procedures will be approved by the licensee.

,

.

'

l j

4.

Civil QC Oreanisation Conversation with FF&L's Project QC Supervisor disclosed that an Area

._

  • QC supervisor (Civil) had been hi*ed and is scheduled to report to r

the site shortly. The licenses has contracted with U. 5. Testing to j

perform all site laboratory testing and field inspection (QC functions)

,

.

for the soilsaand concrete phases of construction.

Tentatively, the

,

i

FF&L organisation staffing calls for three Level III U. 5. Testing

..

inspectors (field, concrete, soils) certified in accordance with QI2.1

'

,

f to supervise and direct Level II and Level I inspectors in their j

respective tasks.

Presently, two of the three Level III inspector positions (field and soils) have been filled and two Level I soil

'

}

inspectors are on site.

It is noted that the U. 5. Testing personnel

.

will be required to meet FF&L standards plus the N45.6 requirements.

'

FF&L will also review and endorse all U. S. Testing proceduies used

,

at the site.

.

l 5.

Other Discipline QC

.

!

.

.

,

The mechanical, electrical and instrumentation QC functions will be

!

performed similar to the aforementioned civil QC functions.

Either U. S. Testing or some other qualified organisation will supply personnel

.

who will be under the supervision of the licensee's QC area supervisors.

.

6.

oc specification and Procedure Review

-

.

,

The following approved specifications and quality control instructions and procedures for groundwater and earthwork operational the manufacturing, placing, testing and control of structural grada concrete: the furnishing, fabrication and delivery of reinforcing steelt and the certification of

,

QC inspection personnel were examined for conformance to SAR comitments and applicable codes and standards.

.

Specification / Quality Instruction No.

,QQ,

.

.

FLO 2998.471 R2 Excavation and Backfill FLO 2998.472 R4 Dewatering FLO 2998.473 R1 Concrete FLO 2998.47.4 R2 Concrete Reinforcing Steel

.

.

'

.

t e est em se o ansammagrose 5 e, e - e e + een e a r

-4 4 asu.. a, as-- e

.ee a---

. n

....

O 3-

.s

-

.

.

.

.

.

-

.

..

.

.

,

,

,

,

,

e*

,

IE Ryt. No. 506-389/75-3 I-3

-

-

,

e.**',

,,

.

'

...Certifica$1on of Flant Construction q12.1 o

..

.-

,

QC Inspection Personnel q110.1 General 1%structions fo,r Conduct

,

'

'

of Inspections

,

q110.8 Inspection of Dewaterin's and

,

Controlled Watering

-

.

q111.1

Calibration of Tools, Gauges and Test Devices

,

No itens of procedural noncompliance were identified.

'In addition to the above review, several prepared but as yet not

-

.

approved FF&L quality control instructions pertinent to the LWA

,

were reviewed.

They are:

QIl0.2 Batch Plant Inspection q110.7 Inspection of Fill Compaction

q110.10 Inspection of Excavations 7.

Quality Instructions and Procedures

.

.

The licenses has prepared a list of quality instructions for use during construction.

At present there are 60 QI's under development.

Eighteen

'

,

of these QI's had been released as of August 12, 1975.

'

-

-