CORRECTED COPY.

.

,

.

.

,,,

Y

t

.

'

' ~

IE Rpt. No. 50-389/75-1 II-2

"

-

.. "

...

b.

OrganizationChangeandAnt[cipatedConstructionDevelopments

~~

FP&Lisinthe'processofdevelo'pingAndmaEagingthe QA/QC and record control functions for Unit 2 utilizing licensee personnel exclusively.

Conversation with FP&L l management revealed that FP&L had hired a Field QC Super-visor for Lucie No. 2, and he will eventually be assisted by seven people, three clerical and four area QC super-visory type personnel. The above subject personnel are to report onsite shortly to become familiar with the site and the contractoi to effect a smooth transition. N y

QMMemore =T f

.

_

g u]'

c nm,p -

..

~~~

_

j

-.

,

i l

FP&L is. currently receiving work package bids from various

'

material suppliers, contractors and service organizations

<

t for work connected with LWA-2.

A new concrete batch plant

,

q has been recommended and is being considered by FP&L'to

'

increase concrete production and permit larger monolithic

'

-

t pours.

[

c.

QC Specification and Procedure Review

,

i '?

The following specifications and quality control procedures for i

groundwater and earthwork operations, the manufacturing, placing, testing and control of structural grada concrete were examined

<

l f

for conformance to SAR commitments and applicable codes and

l

standards.

(

-

Specification FLO 2998.471 " Excavation and Backfill" Procedure CSP-1

" Excavation and Backfill" Procedure ASP-1

" Environmental Protection Control Procedus Specification FLO 2998.473 " Concrete, Seismic Class I"

,

Specification FLO 2998.474 " Concrete Reinforcing Steel, Furnishing, l

Fabrication and Delivery" No items of noncompliance were identified; however, the ir.spector expressed concern in that the above procedures were in genetal all-in::1usive but they did not clearly

'

delineate or specify specific inspector involvement, responsibility and duties.

The licensee commented that these civil inspection procedures are being prepared and will be available for review prior to the LWA-2 work l

commencing.

The following inspection procedures are to be provided:

,

,

,

.

.

Offg}0G50703

.

LEICH7084-293 PDR CORRECTED COPY

.

.

.

CORRECTED COPL.,

,

-

,

,

,

.

.

..

.

'

IE Rpt. No,50-389/75-1 II-2

-

,

.

,

,

,,, -

.

,

.

,

,,

b.

Organization Change and Anti'cipated Construction Developments

,

FP&L is in the* process of lievelo' ping $1d maEaging the QA/QC and record. control functions for Unit 2 utilizing

-

licensee personnel. exclusively.

Conversation with FP&L '

.

management revealed that FP&L had hired a Field QC Super-visor for Lucia No. 2, and he will eventually be assisted

.

j by seven people, three clerical and four area QC super-visory type personnel.

The above subject personnel are to report.onsite shortly to become familiar with the site and the contractoi to effect a smooth transition. 6

-

-

d %,, y p h y s p r y k

, ~,.

..:

i

'k.,,1

[.

.

.

,

f 5433r.

l FP&L is currently receiving work package bids from various

'

material suppliers, contractors and service organizations for work connected with LWA-2.

A new concrete batch. plant

,

has been recommended and is being considered by FP&L 'to i

increase concrete production and permit larger monolithic

-

j pours.

'

c.

QC Specification and Procedure Review j

,

,

s

l The following specifications and quality control procedures for groundwater and earthwork operations, the manufacturing, placing, testing and control of structural grade concrete were examined

-

for conformarce to SAR commitments and applicable codes and standards.

Specification I'LO 2998.471 " Excavation and Backfill"

l Procedure CSP-1

" Excavation and Backfill" Procedure ASP-1

" Environmental Protection. Control Procedul Specification FLO 2998.473 " Concrete, Seismic Class I" Specification FLO 2998.474 " Concrete Reinforcing Steel, Furnishing, l

Fabrication and Delivery" i

l No items of noncompliance were identified; however, the inspector expressed concern in that the above procedures were in general all-inclusive but they did not clearly delinence or specify specific inspector involvement, responsibility and duties.

The licensee commented that these civil inspection procedures are being prepared and will be available for review prior to the :NA-2 work commencing.

The following inspection procedures are to be provided:

.

.

O CORRECTED COPY

..

.

..

--.

.

.

..

O I