ML20134M247

From kanterella
Jump to navigation Jump to search
Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13
ML20134M247
Person / Time
Site: Palo Verde, Wolf Creek, Grand Gulf, River Bend, Waterford, South Texas  
Issue date: 02/14/1997
From: Chamberlain D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Klingler G
NRC (Affiliation Not Assigned)
References
GL-89-13, NUDOCS 9702200159
Download: ML20134M247 (4)


Text

.

s i

OG W,$'

UNITED STATES t

fe g

NUCLEAR REGULATORY COMMISSION

[$

REGloN IV 6

[

611 RYAN PLAZA oRIVE, SulTE 400 0'

+,

AR LINGToN, TEXAS 760118064 FEB I 41997 MEMORANDUM TO:

Gerald R. Klingler inspection Program Branch Division of Inspection and Support Programs 0" icq uct R act r Regulation FROM:

Dw' t D. Ch, m e ain, Acting Deputy Director Division of Reactor Projects, Region IV r

SUBJECT:

Ti 2515/118-SERVICE WATER SYSTEM PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT - GENERIC LETTER 89-13 Tl 2515/118 directed the regions to select plants at which to perform this inspection on the basis of factors such as service water system (SWS) operating experience; contribution of SWS to plant risk assessment; licensee programs in response to Generic Letter 89-13; complexity of SWS; and potential for SWS degradation. The following plants did not meet the selection t; therefore, this Tl was not performed for: Grand Gulf; Palo Verde, Units 1,2, and 3; River Bend Station: South Texas Project, Units 1 and 2: Waterford 3; and Wolf Creek. Per your direction, we will update the the Safety Issue Management System (SIMS) to show "NA" in the " VERIFY COMPLETE" column and reference the assession number of this memorandum in the " INSPECTION REPORT NUMBERS" column for these plants.

Dockets:

50-416-50-528;50-529;50-530 50-458 50-498;50-499 50-382 50-482 9702200159 970214 PDR ADOCK 05000382 G

PDR

._, _ _ _. _.., - - _... _ _ - _. ~.. -... -. _. _ _... _ _ _. _..

i i'

J 4

i

' Gerald R. Klingler :

i-

]

cc via E-mail-l 1

D. Chamberlain (DDC) i K. Brockman (KEB)

P. Harrell (PHH) l

'J. Tapia (JIT) i 2

- T. Boyce, NRR (THB) l R. Azua (RVA)

- H. Wong (HJW)

W. Johnson (WDJ) i cc via E-mail to NRR:

l L. Barnett (LWB) i J. Donohew (JND) i-D. Wigginton (DLW)

T. Alexion (TWA) l C. Patel (CPP) i J. Stone (JCS3)

J. Clifford (JWC) 3 r

?

{

'{

I i

)

1

?

i l

Gerald R. Klingler FEB l 41997 bec to DMB (H005) bec distribution by RIV:

RIV Official File 4

4 To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:AC:TSS l

AD: DRPH)" l l

l

- 'l RLNease:df W DDChaMbbrlain 2/ 10 /97 2/ j'T' /97 0FFICIAL RECORD COPY

1 Gerald R. Klingler FEB l 41997 bcEtiDMB:q i

bec distribution by RIV:

RIV Official File l

r O

i f>/v \\

200001