|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217A8641999-10-0606 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196J5191999-05-12012 May 1999 Responds to 980828 Memo Requesting Assistance Re Tornado Missile Protection for turbine-driven Emergency Feedwater Pump Vent Stack & Steam Supply Piping at Waterford Steam Electric Station,Unit 3 ML20138K0131997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970324-28 ML20138K0091997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (as-given Operating Exam) for Tests Administered on 970324-28 ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20135E7161997-03-0303 March 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961118-22 ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20236U9391995-12-20020 December 1995 Discusses Oi,Region IV Rept of Investigation,Dtd 940511, Case 5-93-023R,which Reported OI Investigative Efforts Re Alleged Employee Discrimination at Plant Units 1,2 & 3.Rept Was Sent to Us Attorney Office in Phoenix,Az in May 1994 ML20138E4151994-09-0707 September 1994 Requests That PM for Each CE Plant Review Licensee Response to GL 89-19 to Ensure That 901031 Submittal Applicable to Plant & That Licensee Response Addressed Operator Training Procedures.Ser,Sample Closeout & Sample RAI Ltrs Encl IA-96-341, Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr1994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr ML20138F9871994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by NUREG-1231, Forwards Documents Referenced in Suppl 16 to NUREG-09331993-11-29029 November 1993 Forwards Documents Referenced in Suppl 16 to NUREG-0933 ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20044C6571993-04-12012 April 1993 Requests Transfer of Lead Responsibility to NRR for Review of Licensee Evaluation of Battery Seismic Qualification (Mncr 93-PK-1003) ML20198E3271992-10-20020 October 1992 Notification of Significant Licensee Meeting W/Util on 921027 to Discuss Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Programs within Security Dept ML20126L8441992-09-14014 September 1992 Provides Status Rept Concerning Actions Re Det Performed at Plant ML20127C2461992-03-0202 March 1992 Forwards AEOD SALP Input for Facilities in Support of Ongoing SALP Reviews.Two of Six Important Operating Events Involved Deficiencies of Reactor Power Cutback Sys Which Relies on Proper Functioning of Steam Bypass to Condenser ML20127B6281990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility IA-92-218, Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility1990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility ML20127B5671990-12-12012 December 1990 Forwards NRR Input for SALP Rept,Per NRC Ofc Ltr 907,Rev 1 ,NRC Manual Chapter 0516 & 901120 Memo ML20059M2041990-09-27027 September 1990 Notification of Significant Licensee Meeting W/Util on 901003 to Discuss Licensee Response to Diagnostic Evaluation Team Findings & Overall Status of Programs. Addl NRC Attendees Should Be Made Known by 901002 ML20059L6531990-09-20020 September 1990 Notification of 900921 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives & Status in Area of QA ML20059D6361990-08-27027 August 1990 Notification of 900831 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Medical Qualifications & Exams of Licensed Operators ML20127B4571990-08-24024 August 1990 Comments on Response to Facility Diagnostic Evaluation Team Rept.Suggests That Region V Followup & Closely Monitor Development & Implementation of Specific Tasks Which Will Address Team Findings ML20058M3441990-08-0606 August 1990 Forwards List of Open Items in Sims for Plant.Documented Basis Exists for Closure of TMI Related Items at Plant ML20044A9321990-07-0606 July 1990 Notification of 900710 Enforcement Conference W/Util to Discuss Emergency Lighting & Mgt Meeting Re Licensed Operator Medical Records.Meeting Agenda Encl ML20126L8271990-06-14014 June 1990 Provides Summary of Schedule & Status of Items Re Det of Plant Performed by Aeod,In Response to 900314 Memo ML20042F4901990-05-0202 May 1990 Notification of 900502 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives in Fire Protection,Security & Procurement ML20063P9191990-04-12012 April 1990 Reviews 900111 Submittal of Draft Info Notice Entitled, Adequacy of Emergency & Essential Lighting. Info Notice Not Warranted as Incident Found to Be Isolated Case ML20033H1951990-04-0404 April 1990 Notification of 900410 Meeting W/Util in Phoenix,Az to Discuss Mgt Meeting,Including Status of Facility Restart Activities IR 05000528/19900041990-03-21021 March 1990 Notification of 900330 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Repetitive Occurrences of Inadequate Access Controls for Locked High Radiation Areas Documented in Insp Repts 50-528/90-04 & 50-528/90-13 ML20217C1001990-03-20020 March 1990 Forwards Listed Info Re Qualification of Emergency Lighting Sys Installed at Facility,Per Request ML20033F7271990-03-20020 March 1990 Forwards AEOD/T90-04, Reverse (Backward) Acting Valve Manual Handwheels, Technical Review Rept.Investigation Initiated by Unsuspected Reversed Rotation of Atmospheric Dump Valve Manual Handwheels at Palo Verde Unit 3 ML20012C7261990-03-20020 March 1990 Forwards AEOD Diagnostic Evaluation Team Rept for Plant,Per Discussions During May 1989 Senior Mgt Meeting.W/O Encl ML20127B2171990-01-18018 January 1990 Forwards AEOD Input for Commissioner Curtiss Visit to Plant on 900201,consisting of Summary of Operating Experience from Oct 1988 to Dec 1989 ML20005G3011990-01-0909 January 1990 Notification of 900118 Meeting W/Util in Rockville,Md to Discuss Util Proposed Exemption for Diverse Auxiliary Feedwater Actuation Sys for Plant ML20127B1681989-11-0909 November 1989 Forwards NRR Input to SALP for Facilities.Category 2 Rating Assigned in Functional Areas of Plant Operations, Radiological Controls,Emergency Preparedness,Security & Safety Assessment/Quality Verification ML20043F4151989-10-0404 October 1989 Discusses Review Re Disposal of Radioactive Cooling Tower Sludge in Sludge Landfill of Palo Verde.Util Agrees W/ Arizona Radiation Regulatory Agency Conclusions ML20246N7371989-08-29029 August 1989 Notification of Maint Team Insp Meeting on 890901 W/Util in Phoenix,Az to Discuss Status of Licensee Commitments from 890605 Mgt Meeting in Consideration of Unit 3 Restart ML20127B1401989-08-0707 August 1989 Forwards for Info & Consideration for Info Notice,Lers Describing Potter & Brumfield Relay Problems & Atmospheric Dump Valve Deficiencies.Info Provided as Part of AEOD Function to Identify Potential Adverse Events ML19332F7431989-07-21021 July 1989 Provides Summary of Station Blackout Responses & Staff Review Schedule Per Request.Cursory Check of Licensee Responses to Station Blackout Rule Has Been Performed in Order to Provide Overview of Industry Approach ML20042D1901989-06-0808 June 1989 Memorandum Forwarding Partially Deleted Summary of Discussions During NRC 890517-18 Mgt Meeting Re Problem Plants & Addl Topics.Task Assignments & List of Attendees Also Encl ML20127G5121989-03-15015 March 1989 Discusses Atmospheric Dump Valve Failures at Plant.Cause Still Under Investigation.Related Documentation Encl ML20236B4871989-03-14014 March 1989 Notification of 890316 Meeting W/Util in Rockville,Md to Discuss Electrical Distribution Sys as Related to Load Injection Event on 890303.Preliminary Agenda for Electrical Meeting Encl ML20206L6701988-11-21021 November 1988 Notification of 881209 Meeting W/Util in Rockville,Md to Present Engineering Excellence Program ML20195G8481988-11-21021 November 1988 Notification of Significant Meeting on 881201 in Wintersburg,Az to Review Util Action on NRC Concerns ML20207D6471988-08-0505 August 1988 Notification of Significant Meeting on 880817 W/Util in Walnut Creek,Ca for Enforcement Conference Re Early Criticality Event at Unit 1,personnel Radiation Overexposure at Unit 2 & Violation Re Essential Chiller Water Sys 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217A8641999-10-0606 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990829-0903 ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196J5191999-05-12012 May 1999 Responds to 980828 Memo Requesting Assistance Re Tornado Missile Protection for turbine-driven Emergency Feedwater Pump Vent Stack & Steam Supply Piping at Waterford Steam Electric Station,Unit 3 ML20138K0131997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970324-28 ML20138K0091997-05-0606 May 1997 Forwards NRC Approved Operator Licensing Exam (as-given Operating Exam) for Tests Administered on 970324-28 ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20135E7161997-03-0303 March 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961118-22 ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20236U9391995-12-20020 December 1995 Discusses Oi,Region IV Rept of Investigation,Dtd 940511, Case 5-93-023R,which Reported OI Investigative Efforts Re Alleged Employee Discrimination at Plant Units 1,2 & 3.Rept Was Sent to Us Attorney Office in Phoenix,Az in May 1994 ML20138E4151994-09-0707 September 1994 Requests That PM for Each CE Plant Review Licensee Response to GL 89-19 to Ensure That 901031 Submittal Applicable to Plant & That Licensee Response Addressed Operator Training Procedures.Ser,Sample Closeout & Sample RAI Ltrs Encl IA-96-341, Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr1994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by 940228 Ltr ML20138F9871994-08-0303 August 1994 Discusses Allegation RV-94-A-0004,Songs Vendor Manuals. Licensee Reviewed Allegation,Concluded Unfounded & Notified NRC for Conclusion by NUREG-1231, Forwards Documents Referenced in Suppl 16 to NUREG-09331993-11-29029 November 1993 Forwards Documents Referenced in Suppl 16 to NUREG-0933 ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20044C6571993-04-12012 April 1993 Requests Transfer of Lead Responsibility to NRR for Review of Licensee Evaluation of Battery Seismic Qualification (Mncr 93-PK-1003) ML20198E3271992-10-20020 October 1992 Notification of Significant Licensee Meeting W/Util on 921027 to Discuss Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Programs within Security Dept ML20126L8441992-09-14014 September 1992 Provides Status Rept Concerning Actions Re Det Performed at Plant ML20127C2461992-03-0202 March 1992 Forwards AEOD SALP Input for Facilities in Support of Ongoing SALP Reviews.Two of Six Important Operating Events Involved Deficiencies of Reactor Power Cutback Sys Which Relies on Proper Functioning of Steam Bypass to Condenser ML20127B6281990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility IA-92-218, Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility1990-12-31031 December 1990 Forwards Updated Status Rept on Actions Re Diagnostic Evaluation Performed at Facility ML20127B5671990-12-12012 December 1990 Forwards NRR Input for SALP Rept,Per NRC Ofc Ltr 907,Rev 1 ,NRC Manual Chapter 0516 & 901120 Memo ML20059M2041990-09-27027 September 1990 Notification of Significant Licensee Meeting W/Util on 901003 to Discuss Licensee Response to Diagnostic Evaluation Team Findings & Overall Status of Programs. Addl NRC Attendees Should Be Made Known by 901002 ML20059L6531990-09-20020 September 1990 Notification of 900921 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives & Status in Area of QA ML20059D6361990-08-27027 August 1990 Notification of 900831 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Medical Qualifications & Exams of Licensed Operators ML20127B4571990-08-24024 August 1990 Comments on Response to Facility Diagnostic Evaluation Team Rept.Suggests That Region V Followup & Closely Monitor Development & Implementation of Specific Tasks Which Will Address Team Findings ML20058M3441990-08-0606 August 1990 Forwards List of Open Items in Sims for Plant.Documented Basis Exists for Closure of TMI Related Items at Plant ML20044A9321990-07-0606 July 1990 Notification of 900710 Enforcement Conference W/Util to Discuss Emergency Lighting & Mgt Meeting Re Licensed Operator Medical Records.Meeting Agenda Encl ML20126L8271990-06-14014 June 1990 Provides Summary of Schedule & Status of Items Re Det of Plant Performed by Aeod,In Response to 900314 Memo ML20042F4901990-05-0202 May 1990 Notification of 900502 Meeting W/Util in Walnut Creek,Ca to Discuss Licensee Initiatives in Fire Protection,Security & Procurement ML20063P9191990-04-12012 April 1990 Reviews 900111 Submittal of Draft Info Notice Entitled, Adequacy of Emergency & Essential Lighting. Info Notice Not Warranted as Incident Found to Be Isolated Case ML20033H1951990-04-0404 April 1990 Notification of 900410 Meeting W/Util in Phoenix,Az to Discuss Mgt Meeting,Including Status of Facility Restart Activities IR 05000528/19900041990-03-21021 March 1990 Notification of 900330 Enforcement Conference W/Util in Walnut Creek,Ca to Discuss Repetitive Occurrences of Inadequate Access Controls for Locked High Radiation Areas Documented in Insp Repts 50-528/90-04 & 50-528/90-13 ML20012C7261990-03-20020 March 1990 Forwards AEOD Diagnostic Evaluation Team Rept for Plant,Per Discussions During May 1989 Senior Mgt Meeting.W/O Encl ML20217C1001990-03-20020 March 1990 Forwards Listed Info Re Qualification of Emergency Lighting Sys Installed at Facility,Per Request ML20033F7271990-03-20020 March 1990 Forwards AEOD/T90-04, Reverse (Backward) Acting Valve Manual Handwheels, Technical Review Rept.Investigation Initiated by Unsuspected Reversed Rotation of Atmospheric Dump Valve Manual Handwheels at Palo Verde Unit 3 ML20127B2171990-01-18018 January 1990 Forwards AEOD Input for Commissioner Curtiss Visit to Plant on 900201,consisting of Summary of Operating Experience from Oct 1988 to Dec 1989 ML20005G3011990-01-0909 January 1990 Notification of 900118 Meeting W/Util in Rockville,Md to Discuss Util Proposed Exemption for Diverse Auxiliary Feedwater Actuation Sys for Plant ML20127B1681989-11-0909 November 1989 Forwards NRR Input to SALP for Facilities.Category 2 Rating Assigned in Functional Areas of Plant Operations, Radiological Controls,Emergency Preparedness,Security & Safety Assessment/Quality Verification ML20043F4151989-10-0404 October 1989 Discusses Review Re Disposal of Radioactive Cooling Tower Sludge in Sludge Landfill of Palo Verde.Util Agrees W/ Arizona Radiation Regulatory Agency Conclusions ML20246N7371989-08-29029 August 1989 Notification of Maint Team Insp Meeting on 890901 W/Util in Phoenix,Az to Discuss Status of Licensee Commitments from 890605 Mgt Meeting in Consideration of Unit 3 Restart ML20127B1401989-08-0707 August 1989 Forwards for Info & Consideration for Info Notice,Lers Describing Potter & Brumfield Relay Problems & Atmospheric Dump Valve Deficiencies.Info Provided as Part of AEOD Function to Identify Potential Adverse Events ML19332F7431989-07-21021 July 1989 Provides Summary of Station Blackout Responses & Staff Review Schedule Per Request.Cursory Check of Licensee Responses to Station Blackout Rule Has Been Performed in Order to Provide Overview of Industry Approach ML20042D1901989-06-0808 June 1989 Memorandum Forwarding Partially Deleted Summary of Discussions During NRC 890517-18 Mgt Meeting Re Problem Plants & Addl Topics.Task Assignments & List of Attendees Also Encl ML20127G5121989-03-15015 March 1989 Discusses Atmospheric Dump Valve Failures at Plant.Cause Still Under Investigation.Related Documentation Encl ML20236B4871989-03-14014 March 1989 Notification of 890316 Meeting W/Util in Rockville,Md to Discuss Electrical Distribution Sys as Related to Load Injection Event on 890303.Preliminary Agenda for Electrical Meeting Encl ML20206L6701988-11-21021 November 1988 Notification of 881209 Meeting W/Util in Rockville,Md to Present Engineering Excellence Program ML20195G8481988-11-21021 November 1988 Notification of Significant Meeting on 881201 in Wintersburg,Az to Review Util Action on NRC Concerns ML20207D6471988-08-0505 August 1988 Notification of Significant Meeting on 880817 W/Util in Walnut Creek,Ca for Enforcement Conference Re Early Criticality Event at Unit 1,personnel Radiation Overexposure at Unit 2 & Violation Re Essential Chiller Water Sys 1999-08-27
[Table view] |
Text
,
4 6
ece.w%
UNITED STAYES 3
NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20HS AUG2( 1910
% #I m
MEMORANDUM FOR:
John B. Martin Regional Administrator M
Region V FROM:
Edward L. Jordan, Director Office for Analysis and Evaluation of Operational Data
SUBJECT:
AE00 COMMENTS ON ARIZONA PUBLIC SERVICE COMPANY'S RESPONSE TO THE PALO VERDE DIAGNOSTIC EVALUATION TEAM REPORT AE00 has reviewed Arizona Public Sorvice Company's July 31, 1990 response to the Palo Verde Diagnostic Evaluation Team report issued on March 16,1990.
The request-for a sumary of the integrated action plan, including priorities.
and. projected schedules contained in the Diagnostic Evaluation Team report transmittal letter was modified by a letter dated April 16, 1990. The modified request only required the initial version of the business plan for Palo Verde be submitted by the end of July.
The purpose of our review was to evaluate the adequacy of APS's plans and actions in terms of both-the specific findings contained in the team report and the underlying root causes which were documented in this report.
From-our review of the information presented-in the APS submittal, we offer the following coments for your information.and follow-up action as appropriate.
The APS submittal identified a three tiarad business plan._ The first tier was the five year business plan, the second tier a one year. slan that presents a-one-year objective for each five year objective, and a t11rd tier which contained the detailed task plans..Two preliminary detailed task plans were provided as examples. APS committed to complete these comprehensive three tier task plans over the balance of the year.
The response provides a generalized, high level overview description of the plans to address each of the management issues and findings contained in the evaluation report.
We found the licensee's response generally lacked L
sufficient detail with respect to specific task action plans and required performance levels to allow evaluation of the quality and completeness of the plans and actions which will be taken for each initiative. Accordingly, the implementation details and resulting effects on plant and organizational performance improvements cannot be evaluated.or projected with_a high. level of-l L
certainty, Notwithstanding these limitations, we believe that APS management has gained a clear understanding of the underlying causes for the identified problems-adversely affecting Palo Verde's performance.
Furthermore, the submittal arovides evidence of the APS corporate management's willingness and' Intent to se responsive to the team's management, organizational, and' lH programmatic findings._
Q()Q$ S ?0f
l l
John B. Hartin 2
4E We would suggest that Region V, on a selective basis, follow up and closely monitor the development and implementation of the specific tasks which will address the team's findings.
Efforts should also continue to evaluate their effect to ensure there is sufficient management resolve and comitment for long term improvement in plant performance and organizational effectiveness.
From our review it could not be determined if the APS Quality Assurance Department (QAD) would be active in auditing the quality and completeness of these task plans, as well as, the effectivenass of their implementation. We believe QAD should also be involved in these monitoring efforts.
If we can provido any additional information or clarification regarding this memorandum, please contact me or Stuart Rubin of my staff.
wa d
. Jordan, Director Offic r Analysis and Evaluation of rational Data e
C7~'
f r
AKIN, GuMP, HAUCR & Fcto. L.L.P.
a J'
ATfoRNCYS AT LAW RICO Fm ANO Pp diOO 8'att cet t C t wit se a atmtiteto tinotto Liabiuty **si1Nta6**
114 con 04tts Avtf 4vt 4700 P Acer oc Avtodut
'NC6 UI"40 **0' E S 6 *h*' CO**O"#' ONS AvattN 108 A5 78704 i
'S'#8
- W OALLAS traAt 752014618 1333 NLW HAMPSHIRC AVENUC. N W.
SUITC doo
- d00 NatioNssANat plaza 300 CONvtNf Stettf C5 AvtNut Lovitt. P e No 7 WASHINGTON, O C. 20036 SAN ANTONIO ttzAs 78205 8050 enusette ottoivu OD 15121270<.a600 1011132 2 S35 2916 F AA (2021097 4289 714 LOultiAN A Sf Mt te
.........,t,..n.,v........i....
sov TON.,txAs n OOR 17131220 5800 February 21, 1992 13 IIAND DELIVERif FREEDOM OF INf0RMAil0N Donnie II. Grimsley, Director ACT REQUEET Division of Freedom of Information
[g 4 and Publications Service U.S._ Nuclear Regulatory Commission gg4 Washington, D.C.
20555
Dear Mr. Grimsley:
This is a request pursuant to the_ Freedom of Information Act, 5 U.S.C. 552, and 10 CFR Part 9 for documsnts relating to Palo Verde Units 1, 2 & 3, and more particularly described below.
For the purpose of this request, the term " document" means all memoranda, letters, filings, testimony, exhibits, contracts, transcripts, minutes, notes, drafts, studies, analyses, reports, maps, diagrams, charts, books, articles, pictures, printouts, tapes, or other written, graphic, or computerized information in any form which constitutes agency records under the Freedom of-Information Act.
The documents we are requesting can more particularly be described as:
1.
All documents, other than the NRC Augmented Inspection Team (AIT) report forwarded to Arizona Public Service (APS) on April 19, 1989_ and the Diagnostic Evaluation Team (DET) Report. forwarded to APS on March -16, 1990, which discuss, evaluate,. analyze or otherwise address the causes of the_1989 outages at Palo Verde Units 1, 2, and 3; and the basis for the NRC--
Confirmation of Action letters issued on March 3, 1989; March 7, 1989; March 28, 1989; June 28, 1989; and_
December 24, 1989 that addressed the Palo Verde Units.
This request includes, but is not limited to, dc,cuments which address the causes of the shutdown resulting in-the 1989 outages at all three.Palo Verde Units and the causes of~the 1989 outages exceeding the formally.or:
informally scheduled or planned outage durations.-
l Cl f
~
I L
x
I A in, GuMP, HAutR & Fcto. L.L.P Donnie H. Grimsley rebruary 21, 1992 Page 2 2.
All transcripts, tapes or other record of interviews conducted during or in support of the NRC Augmented Inspection Team's review of the March 3, 1989 trip of Palo Verde Unit 3.
The AIT review was reported in an AIT report forwarded to APS on April 9, 1989.
3.
All transcripts, tapes or other record of interviews conducted during or in support of the Diagnostic Evaluation Team s review of Palo Verde performance. The OET review was' reported in a DET report transmitted to APS on March 16, 1990.
Pursuant to 5 U.S.C.
5552(a)(6), a response to this request-is required in ten days.
We are willing to pay all necessary search and copy fees associated with this request.
Please notify the undersigned at (202) 887-4558 if these fees are expected to exceed $450.00.
If_any-portion of this request is denied, please provide a detailed explanation of the reasons-for the denial, as required by 5 U.S.C. S 552(a)(6).
Sincero Bradle J
es t
1 L
s w
.