ML20134A862
See also: IR 05000528/1976001
Text
.
. . _ _ -
-
_ . _ _
_ .
-- ._
.
__
_ - - -
_
'I
-.
,
,
.,
'
.
,
6
UNITED STATES
NUCLEAR REGUL TORY COMMISSION
,
REGION V
SVITE 202, W ALNUT CREEK PLAZA
>
(990 N. C ALIFO A NI A SOULEVAR D
!
WALNUT CREEK, C ALIFORNt A 94998
f
'
i
h'n 131976
!
t
-
.
G. W. Roy, Chief Field Coordination &
'
Enforcement Branch, IE:HQ
ARIZONA PUBLIC. SERVICE C0dPAliY
7
PALO VERDE 1, 2 Ai10 3
-
DOCKET fiOS. 50-528, 50-529 Af10 50-530
f
'
The attached report by R. J. Pate of a visit to the subject facility on
L
.
April 28, 29 and 30,1976 is forwarded for your information.
,
r
As indicated by the tone of the attached report, the progress to date on
I
the construction procedures has been less than expected.
Sufficient
i
time is available for the procedures to be put in place for the first
quality related construction activity (backfilling) scheduled for
September,1976, if APS takes action to ensure Bechtel has the pro-
cedures prepared and submitted on a timely basis. We are concerned
that, if the procedures are not prepared on a timely basis, there will
be a last minute scramole to get the procedure reviewed and accepted and
j
increase the probability of tne work being done in a nonconforming
!
manner.
To nelp ensure tnis does not happen, we will continue to watch
l
the progress of the project and make our future inspections at the
l
appropriate times.
!
%
M'%e
G. S. Spencer, Chief
l
l
Reactor Construction and
t
i
Engineering Suppor.t Branch
.
Enclosure:
Ltr to APS w/IE Inspection
>
Report flo. 50-520/76-01
'
-
'
50-529/76-01
50 530/76 01
,
f
i
OgG150446050703
d
4
y,.',p %
Cao48/W-a3
Fo/4 N 2.95
q
,, o,,
wj
ns
'
w. .#
t
. -
-
.
-