DETAILS Persons Contacted

  • F. Agosti, Manager, Nuclear Operations
  • L. Iregni, Licensing Engineer J. DuBay, Director, Planning and Control 0. Earle, Supervisor, Licensing '

R. Eberhardt, Rad-Chem Engineer P. Fessler, Assistant Maintenance Engineer

  • E. Griffing, Assistant Manager, Nuclear Operations W. Jens, Vice-President, Nuclear Operations W. Kaczor, Director, SAFETEAM, (DECO)

R. Kunkle, Director, SAFETEAM (UTS)

S. Leach, Director, Nuclear Security J. Leman, Maintenance Engineer L. Lessor, Advisor to the superintendent, Nuclear Production

  • R. Lenart, Superintendent, Nuclear Production R. Mays, Director, Project Planning
  • Miller, QA Supervisor, Operational Assurance S. Noetzel, Site Manager J. Nyquist, Assistant to Superintendent, Nuclear Production G. Overbeck, Assistant Plant Superintendent J. Plona, Technical Engineer E. Preston, Operations Engineer W. Ripley, Startup Director C. P. Sexauer, Nuclear Production Administrator G. Trahey, Director, Nuclear QA
  • Denotes those who attended the exit meeting The inspectors also interviewed others of the licensee's staff during this inspectio . Followup on Inspector Identified Items " (Closed) Open Item (341/84043-06(DRSS)), and License Condition Attachment 1, B.2.b:

Fabricate and install an intrinsic germanium detector system post-accident collimator prior to exceeding five percent power. The licensee fabricated several lead shield collimators for accident condition use with the detector system, and a calibration was performed for use with a multi-channel analyzer.

. The licensee demonstrated the use of the collimators for the inspectors.

! The inspectors also reviewed selected sections

! of Radiological Engineering Report No. 85-02, " Calibration of High Purity Germanium Detector for Use with Lead Collimators to Analyze l High activity Post-Accident Samples."

8510100157 851004 PDR ADOCK 05000341