U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-341/85023(DRSS)
.
Docket No. 50-341 License No. NPF-33 Safeguards Group IV Licensee:
Detroit Edison Company 2000 Second Avenue Detroit, MI 48226 Facility Name:
Enrico Fermi Atomic Power Plant, Unit 2 Inspection At:
Plant Site Inspection Conducted:
May 1-2, 1985 Enforcement Conference Conducted:
May 21, 1985 Enforcement Conference At:
U.S. NRC Region III Office, Glen Ellyn, IL Date of Last Physical Security Inspection:
March 6-8, 1985 Type of Inspection:
Announced, Special Physical Security
}. R C4 f.~
Inspector:
J. L. Belander dr/tr Date 94 M M
M#
Reviewed By:
J. R. Cre
, Chief Safeguards Section Date Approved By:
x so f
d sf
.
'
Nuclear Materials Safety Date and Safeguards Branch Inspection Summary Inspection on May 1-2, 1985 (Report No. 50-341/85023(DRSS))
Areas Inspected:
Included a review of the events described in a licensee Safeguards Event Report dated April 23, 1985, and corrective actions taken.
This inspection involved 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />, on site and in-office, by one NRC inspector.
The inspection was begun during the day shift.
Results:
Based on this inspection, one apparent item of noncompliance was identified.
Access Controls - Personnel:
Licensee failed to adequately control or monitor access to a vital area as a result of failing to adequately respond to a vital area alarm.
(Paragraph 3)
Enclosure contains (Details - UNCLASSIFIED ) 8506250098 850605 Upon separation this PDR ADOCK 05000341 page is Decontrolled G