IR 05000335/1990002

From kanterella
Jump to navigation Jump to search
Clarifies 900413 Response to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Job Planning Sys Changed to Include Speed Governor Oil Changes Consistent W/Vendor Recommendations
ML17223B066
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/24/1991
From: GOLDBERG J H
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-26, NUDOCS 9101280251
Download: ML17223B066 (4)


Text

t6ACCELERATEDDIjRIBUTIONDEMONSTiTIONSYSTEMREGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)ESSIONNBR:9101280251DOC.DATE:91/01/26NOTARIZED:NOFACIL:50-335St.LuciePlant.,Unit1,FloridaPower&LightCo.50-389St.LuciePlant,Unit2,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATIONGOLDBERG,J.'H.FloridaPower&LightCo.RECIP.NAMERECIPIENTAFFILIATIONDocumentControlBranch(DocumentControlDesk)SUM'ECT:Clarifies900413responsetoviolationsnotedinInspRepts50-335/90-02&50-389/90-02.Correctiveactions:nuclearjobplanningsyschangedtoincludespeedgovernoroilchangesconsistentw/vendorrecommendations.DISTRIBUTIONCODE:ZE01DCOPIESRECEIVED:LTRENCLSIZE:TITLE:General(50Dkt)-InspRept/NoticeofVioationResponseNOTES:DOCKET0500033505000389RECIPIENTIDCODE/NAMEPD2-2PDINTERNAL:ACRSAEOD/DEIIBDEDRONRRSHANKMAN,SNRR/DOEA/OEABNRR/DRIS/DIRNRR/PMAS/ILRB12OEDIRE~FILE0EXTERNAL:EG&G/BRYCE~J.H.NSZCCOPIESLTTRENCL211111111RECIPIENTIDCODE/NAMENORRIS,JAEODAEOD/TPABNRRMORISSEAU,DNRR/DLPQ/LPEB10NRR/DREP/PEPB9D-NRR/DST/DIR8E2NUDOCS-ABSTRACTOGC/HDS2RGN2FILE01NRCPDRCOPIESLTTRENCL1111111ib1NOTETOALL"RIDS"RECIPIENTS:PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMP1-37(EXT.20079)TOELliVIINATEYOURNAMEFROMDISTRIBUTIONLISTSFORDOCUMENTSYOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:LTTR24ENCLQ

P.O.Box14000,JunoBeach,FL33408-0420JANUARY241991L-91-26U.S.NuclearRegulatoryCommissionAttn:DocumentControlDeskWashington,D.C.20555Gentlemen:Re:St.LucieUnit1and2DocketNos.50-335and50-389ResponsetoNoticeofViolationClarificationInsectionReort90-02ReferenceA:St.LucieUnit1and2DocketNos.50-335and50-389ResponsetoNoticeofViolationInsectionReort90-02L-90-138,datedApril13,1990OnJanuary10,1991,adiscussionbetweenNRCRegionIIpersonnelandtheSt.LuciePlantstaffresultedinarequestbytheNRCforclarificationofthe"specificprocedures"mentionedinFindingB,Response3,inReferenceA.InReferenceA,FloridaPower&LightCompany(FPL)stated:3.Thespecificvendorrecommendationregardingthespeedgovernoroilchangewascompleted.-Thespecificprocedureswerechangedtoreflecttheoilchangesatafrequencyconsistentwiththevendor'srecommendation.FPLsubmitsthefollowingclarification:TheNuclearJobPlanningSystem(NJPS)waschangedtoincludethespeedgovernoroilchangesatafrequencyconsistentwiththevendor'srecommendationonFebruary2,1990.TheNJPSisasystemdesignedtoensurepreventativemaintenanceisscheduledwithinthedesiredtimeframesandtrackedtocompletion.Adetailedsetofwrittenworkinstructionswasdevelopedusingtheguidanceinthevendortechnicalmanualtoperformtherequiredpreventativemaintenance.Thisdetailedsetofwrittenworkinstructionswasintheformofanattachmentwhichwasissuedwiththemaintenanceworkorder.Whenthismaintenancewassubsequentlyperformed,itwasdoneusingthedevelopedsetofdetailed92022S02~25i91012~OCK05000735PDR~go//gpanFPLGroupcompany L-91-26Page2instructions.Inaddition,thismaintenancewasperformedunderthesupervisionoftheInstrumentandControlsupervisorandtheSystemEngineer.FPLregretsanyconfusioncausedbyourresponseofApril13,1990.AdetailedwrittenprocedurewasissuedonJanuary11,1991,replacingthewritteninstructionsdiscussedabove.Verytruyyours,J.H.GoldbergPresident-NuclearDivisiont4JHG/JWHcc:StewartD.Ebneter,RegionalAdministrator,USNRCRegionIZSeniorResidentInspector,USNRC,St.LuciePlant