IR 05000324/1984039

From kanterella
(Redirected from IR 05000325/1984039)
Jump to navigation Jump to search
Ack Receipt of 850426 Supplemental Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/84-39 & 50-325/84-39.Responses to Inspector Followup Items 50-324/84-39-02 & 50-325/84-39-02 Acceptable
ML20133D238
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/09/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8507220142
Download: ML20133D238 (1)


Text

. _ _ . - __

'////no

.

.

May 9,1985 Carolina Power and Light Company ATTN: Mr. E. E. Utley Executive Vice President Power Supply and Engineering and Construction 411 Fayetteville Stree Raleigh, NC 27602 Gentlemen:

SUBJECT: REPORT NOS. 50-325/84-39 AND 50-324/84-39 Thank you for your supplemental response of April 26, 1985, to our Notice of Violation issued on February 21, 1985, concerning activities conducted at your Brunswick facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We also have received your response to Inspector Followup Item 50-324/84-39-02 and 325/84-39-02 which we requested during a telephone conversation on February 1,1985. We find your proposed corrective

. actions to be acceptable. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, I

Original Signed by Roger D. Walker Roger D. Walker, Director Division of Reactor Projects cc: P. W. Ilowe, Vice President Brun swick Nuclear. Project C. R. Dietz, Plant General Manager bec: NRC Resident Inspector Document Control 4 Desk State of North ~ Carolina

. .

I B507220142 850509 DH ADOCK 050 g 4

_

-

.

RII RII RII RII RII

,

f ll/] f l./

'

'\ / Tr/

PDWagner:sa CJ an VAFGibson PRBemis DMVerrelli 05/ 7 /85 05/ /85 05/p/85 0/ /85 05/g /85 h

'

_z go t