ML24317A143

From kanterella
Jump to navigation Jump to search

Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums
ML24317A143
Person / Time
Site: Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle  Constellation icon.png
Issue date: 11/04/2024
From: Eggers D
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24317A141 List:
References
Download: ML24317A143 (1)


Text

Constellation~

200 Energy Way Kennett Square, PA 19348 www.ConstellationEnerqy.com 10 CFR 140.21 Confidential Financial Information Submitted Under 10 CFR 2.390 November 04, 2024 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 James A FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket No. 50-333 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-37 4 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 transmitted herewith contains Confidential Financial Information.

When separated from Attachment 1, this transmittal document is decontrolled.

2024 Annual Report - Guarantees of Payment of Deferred Premiums November 04, 2024 Page2

Subject:

Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRC Docket Nos. 50-220 and 50-410 Peach Bottom Atomic Power Station, Units 2 and 3 Subsequent Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 R. E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 2024 Annual Report - Guarantees of Payment of Deferred Premiums Pursuant to 1 O CFR 140.21, "Licensee guarantees of payment of deferred premiums," Constellation Energy Generation, LLC (CEG) is providing evidence that it maintains a guarantee of payment of deferred premiums in the amount of $24.714 million for each reactor it owns (in whole or in part) and is licensed to operate. This information is required to be submitted annually on the anniversary date on which the indemnity agreement is effective for each covered reactor. Because the indemnity agreement effective dates vary for each reactor, Constellation Energy Generation, LLC, submits information for all of its reactors by November 16 of each year to demonstrate its compliance with 10 CFR 140.21.

The CEG projected internal cash flow is contained in Attachment 1. The average quarterly cash flow projection could be drawn on to raise $518.994 million needed to provide for its payment of retrospective premiums.

MidAmerican Energy Company is the owner of 25 percent of the Quad Cities Nuclear Power Station.

PSEG Nuclear, LLC is the owner of 50 percent of Peach Bottom Atomic PowerStation, Units 2 and 3.

CEG owns (through a subsidiary) Calvert Cliffs Nuclear Power Plant, LLC (which owns Calvert Cliffs Nuclear Power Plant, Units 1 and 2), R. E. Ginna Nuclear Power Plant, LLC (which owns the R. E.

Ginna Nuclear Power Station), and Nine Mile Point Nuclear Station, LLC (which owns 100% of Nine Mile Point Nuclear Station, Unit 1 and 82% of Nine Mile Point Nuclear Station, Unit 2). In addition, Long Island Power Authority owns an 18% interest in Nine Mile Point Nuclear Power Plant, Unit 2.

This submittal also serves to reflect the guarantee of payment of deferred premiums for these co-owned units.

Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1, are not included in this report because these units are permanently shut down reactors in the SAFSTOR status and not subject to this regulation.

Three Mile Island Nuclear Station, Unit 1 was granted an exemption from the requirements of 1 O CFR 140.11 (a)(4) concerning offsite primary and secondary liability insurance and is no longer being reported in this letter. transmitted herewith contains Confidential Financial Information.

When separated from Attachment 1, this transmittal document is decontrolled.

2024 Annual Report - Guarantees of Payment of Deferred Premiums November 04, 2024 Page 3 contains information confidential to CEG. CEG requests that the contents of be withheld from public disclosure in accordance with 10 CFR 2.390(a)(4). An affidavit supporting the 2.390(a)(4) request is contained in Attachment 2. A non-confidential version of the projected internal cash flow is contained in Attachment 3.

If you have any questions about this letter, please contact Wendi Para at (267) 533-5208.

Respectfully, Daniel L. Eggers Chief Financial Officer Constellation Energy Generation, LLC Attachments:

1) Confidential Financial Information - Projected Internal Cash Flow
2) Affidavit
3) Non-Confidential Financial Information - Projected Internal Cash Flow cc:

Regional Administrator - NRC Region I Regional Administrator - NRC Region Ill NRC Senior Resident Inspector - Braidwood Station NRC Senior Resident Inspector-Byron Station NRC Senior Resident Inspector-Calvert Cliffs Nuclear Power Plant NRC Senior Resident Inspector - Clinton Power Station NRC Senior Resident Inspector - Dresden Nuclear Power Station NRC Senior Resident Inspector - James A FitzPatrick Nuclear Power Plant NRC Senior Resident Inspector - LaSalle County Station NRC Senior Resident Inspector - Limerick Generating S~ation NRC Senior Resident Inspector - Nine Mile Point Nuclear Station NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Senior Resident Inspector - Quad Cities Nuclear Power Station NRC Senior Resident Inspector - R. E. Ginna Nuclear Power Plant NRC Senior Resident Inspector - Three Mile Island Nuclear Station, Unit 1 transmitted herewith contains Confidential Financial Information.

When separated from Attachment 1, this transmittal document is decontrolled.

ATTACHMENT 2 CQnstellation Energy Generation, LLC 2024 Annual Report - Guarantees of Payment of Deferred Premiums AFFIDAVIT

ATTACHMENT 2 AFFIDAVIT I, Daniel L. Eggers, Executive Vice President and Chief Financial Officer of Constellation Energy Generation, LLC (CEG), do hereby affirm and state:

1. I am an officer of CEG authorized to execute this affidavit on its behalf. I am further authorized to review information submitted to the Nuclear Regulatory Commission (NRC) and apply for the withholding of information from disclosure.
2. CEG is providing information pursuant to 10 CFR 140.21(e), which constitutes proprietary financial information that should be held in confidence by the NRC pursuant to the policy reflected in 10 CFR 2.390(a)(4), because:
i.

This information (2024 Internal Cash Flow Projection, ATTACHMENT 1) is and has been held in confidence by CEG.

ii.

This information is of a type that is held in confidence by CEG, and there is a rational basis for doing so because the information contains sensitive financial information concerning CEG's projected revenues, and operating expenses.

iii.

This information is being transmitted to the NRC in confidence.

iv.

This information is not available in public sources and could not be gathered readily from other publicly available information.

v.

Public disclosure of this information would create substantial harm to the competitive position of CEG by disclosing CEG's internal financial projections to other parties whose commercial interests may be adverse to those of CEG.

3. Accordingly, CEG requests that the designated documents be withheld from public disclosure pursuant to the policy reflected in 10 CFR 2.390(a)(4).

CATHIE CORNELIUS MCGILL Notary Public

  • State of Maryland Baltimore County My Commission Expires Au1 11, 2028 Subscribed and sworn before me, A Notary Public in and for the State of Maryland r this Lf-th.. day of 1',/ ov~2024 Constellation Energy Generation, LLC Daniel L. Eggers ------

Chief Financial Officer

ATTACHMENT 3 Constellation Energy Generation, LLC 2024 Annual Report - Guarantees of Payment of Deferred Premiums Non-Confidential Financial Information Projected Internal Cash Flow

Net Income Non-Confidential Financial Information Submitted Under 10 CFR 2.390 Contains Non-Confidential Financial Information ATTACHMENT 3 Constellation Energy Generation, LLC 2024 Internal Cash Flow Projection (Dollars In Thousands)

Less: Dividends Paid Earnings (Loss)

Adjustments Depreciation, amortization, and accretion Deferred income taxes and investment tax credits Impairment of certain generating assets Net realized and unrealized mark-to-market transactions Other non-cash operating activities Adjustments Internal Cash Flow Average Quarterly Cash Flow Licensed Sites Braidwood Station, Units 1 and 2 Byron Station, Units 1 and 2 Dresden Nuclear Power Station, Units 2 and 3 LaSalle County Station, Units 1 and 2 Limerick Generating Station, Units 1 and 2 Peach Bottom Atomic Power Station, Units 2 and 3 Quad Cities Nuclear Power Station, Units 1 and 2 Clinton Power Station Calvert Cliffs Nuclear Power Plan, Units 1 and 2 Nine Mile Point Nuclear Station, Units 1 and 2 R. E. Ginna Nuclear Power Plant James A. FitzPatrick Nuclear Power Plant Maximum Total Contingent Liability O!rtification Constella

  • Generation, LLC h su..........-m its obligatio,-...~:.&...::.::;::::.:,:-

Certified By:

Daniel L. Eggers Chief Financial Officer Constellation Energy Generation, LLC 2024 Projected UNAUDITED 2

2 2

2 2

2 2

1 2

2 518,994