Issuance of the Core Operating Limits Report for Reload 25, Cycle 26
ML24310A283
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 11/04/2024
From: Bonifanti M
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24310A282 List:
References
CCN 24-53, TS 5.6.5.d
Download: ML24310A283 (1)


Text

TS 5.6.5.d CCN 24-53 November 4, 2024 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Unit 2 Subsequent Renewed Facility Operating License No. DPR-44 NRC Docket No. 50-277

Subject:

Issuance of the Core Operating Limits Report for Reload 25, Cycle 26 Enclosed is a copy of Revision 20 of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS) Unit 2 for Reload 25, Cycle 26. This revision incorporates the modified cycle specific parameters resulting from the new core configuration as a result of the PBAPS Unit 2 refueling outage. Note that Revision 19 was not issued because rod block monitor setpoints were revised before issuance of this revision.

This COLR is being submitted to the NRC as required by the PBAPS, Unit 2 Technical Specifications (TS) Section 5.6.5.d.

If you have any questions concerning this letter, please contact the Peach Bottom Regulatory Assurance Manager, Brian Woodard at (267) 533-7430.

Respectfully, Martin Bonifanti Site Vice President Peach Bottom Atomic Power Station

Attachment:

Core Operating Limits Report for PBAPS Unit 2, Revision 20 cc:

Regional Administrator, Region I, USNRC (with attachment)

USNRC Senior Resident Inspector, PBAPS (with attachment)

Project Manager - PBAPS, USNRC (with attachment)

W. De Haas, Pennsylvania Bureau of Radiation Protection (with attachment)

S. Seaman, State of Maryland (with attachment)

Bonifanti, Martin A.

Digitally signed by Bonifanti, Martin A.

Date: 2024.11.05 15:15:59 -05'00'