Category:INSPECTION REPORT
MONTHYEARIR 05000213/20240012024-08-27027 August 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation NRC Inspection Report Nos. 07200039/2024001 and 05000213/2024001 IR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 IR 05000213/20210012021-10-26026 October 2021 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2021001 and 05000213/2021001 IR 07200039/20204012020-11-20020 November 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only) IR 05000213/20180012018-05-31031 May 2018 NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2018001 and 05000213/2018001, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 07200039/20184012018-05-17017 May 2018 Connecticut Yankee Atomic Power Company Independent Spent Fuel Storage Security Inspection Report No. 07200039/2018401 - (Cover Letter Only) IR 05000213/20160022016-11-22022 November 2016 NRC Inspection Report No. 05000213/2016002 and 07200039/2016002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20160012016-05-18018 May 2016 IR 05000213-16-001 and 07200039-16-001 on 4/21/16, Connecticut Yankee Atomic Power Company, East Hampton, CT Site IR 07200039/20140012014-05-0606 May 2014 IR 07200039-14-001, on 04/17-18/14, Independent Spent Fuel Installation Inspection, Connecticut Yankee Atomic Power Company, East Hampton, CT IR 07200039/20100012010-12-22022 December 2010 IR 07200039-10-001, on 11/29/10, Connecticut Yankee Atomic Power Company, East Hampton, CT IR 05000213/20070012007-11-20020 November 2007 IR 05000213-07-001, on 04/23-26/07, 06/06-07/07, 07/17/07, 09/04/07, 10/29/07, 10/31/07, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut IR 05000213/20060032007-04-11011 April 2007 IR 05000213-06-003, on 10/01/2006 - 03/30/2007, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20060022006-09-19019 September 2006 IR 05000213-06-002, on 06/26-29/2006, 07/24-28/2006, and 08/21-25/2006, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20060012006-07-14014 July 2006 IR 05000213-06-001, on 01/27/06 - 06/15/2006, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20050032006-02-0707 February 2006 IR 05000213-05-003; Connecticut Yankee Atomic Power Company; on 10/01/2006 - 01/26/2006; Connecticut Yankee Atomic Power Company IR 05000213/20050022005-11-10010 November 2005 IR 05000213-05-002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20050012005-08-0505 August 2005 IR 05000213-05-001, on 01/01/2005 - 03/31/2005, Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Office of Investigations Report No. 1-2004-032 and Notice of Violation IR 05000213/20040022005-02-0808 February 2005 IR 05000213-04-002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site and Notice of Violation IR 05000213/20040012004-09-20020 September 2004 IR 05000213-04-001, on 02/07/04 to 06/08/04, Connecticut Yankee Atomic Power Company IR 05000213/20030012003-07-0303 July 2003 IR 05000213-03-001 on 02/18/03 - 06/11/03 for Haddam Neck, Regarding Dismantlement and Decommissioning of Facility ML0320401272003-06-24024 June 2003 Powerpoint Presentation at Yankee Rowe Connecticut Yankee Management Meeting with the NRC, June 23, 2003 IR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000213/19980061999-06-0909 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/98-06 on 990226. Util Did Not Agree with Disposition of Issue Cited as Severity Level IV Violation.Violation Will Be Noncited IR 05000213/19990011999-05-21021 May 1999 Insp Rept 50-213/99-01 on 980119-990419.No Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility IR 05000213/19980051998-12-21021 December 1998 Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19980041998-11-27027 November 1998 Forwards Special Insp Rept 50-213/98-04 of Licensee Performance During Reactor Coolant Sys Chemical Decontamination ML20155F8511998-10-29029 October 1998 Insp Rept 50-213/98-04 on 980720-0911.Violations Noted. Major Areas Inspected:Aspects of Licensee Preparations, Planning & Implementation of RCS Chemical Decontamination, Operations,Engineering,Maint & Plant Support IR 05000213/19980031998-10-14014 October 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/98-03 Issued on 980821.Ack That Program Improvements for Violations That Occurred During Sys Decontamination,Still in Progress IR 05000213/19980011998-05-13013 May 1998 Insp Rept 50-213/98-01 on 980113-0413.Violations Noted.Major Areas Inspected:Decommissioning Support Activities,Spent Fuel Safety,Plant Support & Radiological Controls & Facility Mgt & Control IR 05000213/19980021998-05-0505 May 1998 Insp Rept 50-213/98-02 on 980316-20 & 25-27.No Violations Noted.Major Areas Inspected:Radiological Control Programs IR 05000213/19970091998-02-17017 February 1998 Insp Rept 50-213/97-09 on 971012-980112.Violations Noted. Major Areas Inspected:Decommissioning Operations & Planning & Included Aspects of Engineering,Maint & Plant Support IR 05000213/19970081998-01-29029 January 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/97-08 on 970703 & 0811-0919.Violation Involved Failure to Follow Radiation Protection Procedures IR 05000213/19970121998-01-15015 January 1998 Insp Rept 50-213/97-12 on 970812-13 & 1006-09.No Violations Noted.Major Areas Inspected:Status of Rp&C Facilities & Equipment IR 05000213/19970101998-01-14014 January 1998 Insp Rept 50-213/97-10 on 971008-1128.No Violations Noted. Major Areas Inspected:Plant Support IR 05000213/19970111997-12-29029 December 1997 Insp Rept 50-213/97-11 on 971006-09 & 1103-07.No Violations Noted.Major Areas Inspected:Programs for Radioactive Liquid Control IR 05000213/19970051997-11-26026 November 1997 Insp Rept 50-213/97-05 on 970708-1006.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Engineering & Plant Support IR 05000213/19970031997-11-0707 November 1997 Corrected Pages for Insp Rept 50-213/97-03 on 970408-0707 & 0805 IR 05000213/19970071997-11-0707 November 1997 Corrected Page for Insp Rept 50-213/97-07 on 970715-30 ML20198N2821997-10-29029 October 1997 Insp Rept 50-213/97-08 on 970703,0811-0919.Violations Noted. Major Areas Inspected:Applied Radiological Controls Program, Contamination Control Program & Training of Personnel Relative to 49CFR172,subpart H IR 05000213/19970061997-08-12012 August 1997 Insp Rept 50-213/97-06 on 970616-0718.Violations Noted. Major Areas Inspected:Radiological Controls Program at Cyap Station,Haddam,Ct IR 05000213/19970011997-07-31031 July 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/97-01 ML20149D6211997-06-13013 June 1997 Mgt Meeting Rept 50-213/97-03 on 970528.Areas Discussed: Actions in Response to Findings Detailed in NRC Insp Repts 50-213/96-12.96-201 & 97-01.Deficiencies Involved Implementation of Radiation Protection Program IR 05000213/19970041997-06-0303 June 1997 Physical Security Insp Rept 50-213/97-04 on 970505-08.No Violations Noted.Major Areas Inspected:Previously Identified Items,Mgt Control,Pa Detection Aids,Alarm Stations & Communication,Testing,Maint & Compensatory Measures IR 05000213/19950271997-05-12012 May 1997 Discusses Insp Repts 50-213/95-27,50-213/96-06,50-213/96-07, 50-213/96-08,50-213/96-11,50-213/96-80 & 50-213/96-201 on 951121-961122 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $650,000 ML20141F8301997-05-0808 May 1997 Insp Rept 50-213/97-01 on 970106-0407.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19960071997-04-0909 April 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/96-07 IR 05000245/19960121997-03-27027 March 1997 Informs That Info Will Be Withheld from Public Disclosure Per Licensee 970303 Request.Licensee Re Exam Rept 50-245/96-12,dtd 970207 Also Discussed IR 05000213/19970021997-03-21021 March 1997 Insp Rept 50-213/97-02 on 970207-07 & 0224-26.Violation Noted.Major Area Inspected:Programs for Radioactive Liquid & Gaseous Effluent Control,Including Organization & Effectiveness of Program Implementation IR 05000213/19960111997-03-0707 March 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/96-11.Exam of Actions Will Be Done During Future Insp IR 05000213/19960121997-02-25025 February 1997 Summary of Meeting Re Insp 50-213/96-12 on 970205 in King of Prussia,Pa to Discuss Findings Detailed in Insp Rept on 961102.Radiation Program Was Deficient in Several Areas That Resulted in Potential Exposure to Radiation 2024-08-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000213/19990011999-05-21021 May 1999 Insp Rept 50-213/99-01 on 980119-990419.No Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility IR 05000213/19980051998-12-21021 December 1998 Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20155F8511998-10-29029 October 1998 Insp Rept 50-213/98-04 on 980720-0911.Violations Noted. Major Areas Inspected:Aspects of Licensee Preparations, Planning & Implementation of RCS Chemical Decontamination, Operations,Engineering,Maint & Plant Support IR 05000213/19980011998-05-13013 May 1998 Insp Rept 50-213/98-01 on 980113-0413.Violations Noted.Major Areas Inspected:Decommissioning Support Activities,Spent Fuel Safety,Plant Support & Radiological Controls & Facility Mgt & Control IR 05000213/19980021998-05-0505 May 1998 Insp Rept 50-213/98-02 on 980316-20 & 25-27.No Violations Noted.Major Areas Inspected:Radiological Control Programs IR 05000213/19970091998-02-17017 February 1998 Insp Rept 50-213/97-09 on 971012-980112.Violations Noted. Major Areas Inspected:Decommissioning Operations & Planning & Included Aspects of Engineering,Maint & Plant Support IR 05000213/19970121998-01-15015 January 1998 Insp Rept 50-213/97-12 on 970812-13 & 1006-09.No Violations Noted.Major Areas Inspected:Status of Rp&C Facilities & Equipment IR 05000213/19970101998-01-14014 January 1998 Insp Rept 50-213/97-10 on 971008-1128.No Violations Noted. Major Areas Inspected:Plant Support IR 05000213/19970111997-12-29029 December 1997 Insp Rept 50-213/97-11 on 971006-09 & 1103-07.No Violations Noted.Major Areas Inspected:Programs for Radioactive Liquid Control IR 05000213/19970051997-11-26026 November 1997 Insp Rept 50-213/97-05 on 970708-1006.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Engineering & Plant Support IR 05000213/19970031997-11-0707 November 1997 Corrected Pages for Insp Rept 50-213/97-03 on 970408-0707 & 0805 IR 05000213/19970071997-11-0707 November 1997 Corrected Page for Insp Rept 50-213/97-07 on 970715-30 ML20198N2821997-10-29029 October 1997 Insp Rept 50-213/97-08 on 970703,0811-0919.Violations Noted. Major Areas Inspected:Applied Radiological Controls Program, Contamination Control Program & Training of Personnel Relative to 49CFR172,subpart H IR 05000213/19970061997-08-12012 August 1997 Insp Rept 50-213/97-06 on 970616-0718.Violations Noted. Major Areas Inspected:Radiological Controls Program at Cyap Station,Haddam,Ct ML20149D6211997-06-13013 June 1997 Mgt Meeting Rept 50-213/97-03 on 970528.Areas Discussed: Actions in Response to Findings Detailed in NRC Insp Repts 50-213/96-12.96-201 & 97-01.Deficiencies Involved Implementation of Radiation Protection Program IR 05000213/19970041997-06-0303 June 1997 Physical Security Insp Rept 50-213/97-04 on 970505-08.No Violations Noted.Major Areas Inspected:Previously Identified Items,Mgt Control,Pa Detection Aids,Alarm Stations & Communication,Testing,Maint & Compensatory Measures ML20141F8301997-05-0808 May 1997 Insp Rept 50-213/97-01 on 970106-0407.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19970021997-03-21021 March 1997 Insp Rept 50-213/97-02 on 970207-07 & 0224-26.Violation Noted.Major Area Inspected:Programs for Radioactive Liquid & Gaseous Effluent Control,Including Organization & Effectiveness of Program Implementation IR 05000213/19960121997-02-25025 February 1997 Summary of Meeting Re Insp 50-213/96-12 on 970205 in King of Prussia,Pa to Discuss Findings Detailed in Insp Rept on 961102.Radiation Program Was Deficient in Several Areas That Resulted in Potential Exposure to Radiation ML20138J6751997-02-0404 February 1997 Insp Rept 50-213/96-13 on 961116-970105.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Plant Support ML20133A5031996-12-24024 December 1996 Insp Rept 50-213/96-11 on 960921-1115.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20132G6211996-12-19019 December 1996 Insp Rept 50-213/96-12 on 961102-27.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review of Airborne Radioactivity Event That Occurred on 961102 IR 05000213/19960101996-11-0505 November 1996 Insp Rept 50-213/96-10 on 960811-0920.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000213/19960801996-10-30030 October 1996 Insp Rept 50-213/96-80 on 960903-1002.Violation Noted. Major Areas Inspected:Operations,Maint,Engineering & Mgt Oversight & Controls ML20129F4701996-10-23023 October 1996 Insp Rept 50/213-96-07 on 960813-16.No Violations Noted. Major Areas Inspected:Licensee Performance During Biennial Emergency Preparedness Exercise,Emergency Facility Staffing, Procedure Emplementation & Effectiveness of Mitigation IR 05000213/20030141995-06-0808 June 1995 Insp Rept 50-397/95-03 on 950213-0314.Violations Noted.Major Areas Inspected:Performance of Engineers on Basis of Quality of Engineering Work Products Basic Design Changes IR 05000213/19940011994-01-24024 January 1994 Insp Rept 50-213/94-01 on 940110-14.No Violations Noted. Major Areas Inspected:Projected Dose Calculation Capability from Radioactive Liquid & Gaseous Effluent Releases IR 05000213/19930211993-12-30030 December 1993 Insp Rept 50-213/93-21 on 931107-1211.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Technical Support & Plant Support Activities IR 05000213/19930231993-12-17017 December 1993 Insp Repts 50-213/93-23,50-245/93-30,50-336/93-25 & 50-423/93-27 on Stated Date.Violation Noted.Major Areas Inspected:Ffd Program,Policies & Procedures,Ffd Organization & Mgt Control,Training,Chemical Testing & FFD Audit IR 05000213/19930191993-11-23023 November 1993 Insp Rept 50-213/93-19 on 931003-1106.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Technical Support & Plant Support Activities IR 05000213/19930181993-10-0707 October 1993 Insp Rept 50-213/93-18 on 930927-30.No Safety Concerns or Violations Noted.Major Areas Inspected:Remp,Including Mgt Controls,Qa Audits,Meteorological Monitoring Program & QC Program for Analytical Measurements IR 05000213/19930151993-10-0101 October 1993 Insp Rept 50-213/93-15 on Stated Dates.No Violations Noted.Major Areas Inspected:Generic Ltr 89-10 Program & Related Activities IR 05000213/19930161993-09-29029 September 1993 Insp Rept 50-213/93-16 on 930725-0828.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Technical Support,Plant Support Activities,Outage Assessment & Emergency Planning Drill IR 05000213/19930121993-08-18018 August 1993 Safety Insp Rept 50-213/93-12 on 930620-0724.Violations Noted.Major Areas Inspected:Plant Operations,Outage Activities,Event Response,Maint,Engineering & Technical Support & Plant Support Activities IR 05000213/19930141993-08-0303 August 1993 Insp Rept 50-213/93-14 on 930719-23.No Violations Noted. Major Areas Inspected:Determination of Whether Licensee Design,Installation & Mod of safety-related Dynamic Pipe Restraints & Static Pipe Supports Performed Correctly IR 05000213/19930081993-07-26026 July 1993 Insp Rept 50-213/93-08 on 930509-0619.Deviation Noted.Major Areas Inspected:Plant Operations,Refuel Outage Activities, Radiological Controls,Maint,Surveillance,Plant Mod,Licensee Event Repts & Periodic Repts IR 05000213/19930111993-07-16016 July 1993 Insp Rept 50-213/93-11 on 930621-25.No Violations Noted. Major Areas Inspected:Insp Was Conducted on Licensee Actions Re Feedwater Nozzle Cracking & Associated Insp & Repair Activities IR 05000213/19930091993-06-17017 June 1993 Insp Rept 50-213/93-09 on 930524-28.No Violations Noted. Major Areas Inspected:Licensee ISI Program & Related Activities,Sg Tube Eddy Current Insp Program Including Data Acquisition & Analysis IR 05000213/19930101993-06-0909 June 1993 Insp Rept 50-213/93-10 on 930601-04.No Violations Noted. Major Areas Inspected:Radiation Protection Program,Mgt Organization,Radiation Control During Refueling Outage, ALARA & Implementation of Programs IR 05000213/19930071993-06-0404 June 1993 Insp Rept 50-213/93-07 on 930510-14.No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Security & FFD Audits,Protected Area Physical Barriers, Detection & Assessment Aids & Packages & Vehicles IR 05000213/19930061993-06-0303 June 1993 Insp Rept 50-213/93-06 on 930328-0508.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Surveillance,Ler & Periodic Repts ML20045B5301993-06-0101 June 1993 Insp of Acceptability of Performance Enhancement Program (Pep) on 920921-25,1026-30 & 1130-1202.PEP Provides Significant Resource Increases in Key Depts as Well as Efforts to Improve Organizational & Mgt Performance ML20035H5661993-04-27027 April 1993 Resident Safety Insp Rept 50-213/93-03 on 930221-0327. Operator Response to Rod Drive Sys Malfunction on 930323 Timely & Appropriate.Major Areas Inspected:Plant Operations, Radiological Controls,Outage Planning & Periodic Repts IR 05000213/19930021993-04-19019 April 1993 Emergency Preparedness Exercise Insp Rept 50-213/93-02 on 930326-29.Major Areas Inspected:Licensee Annual partial- Participation Emergency Preparedness Exercise IR 05000213/19930011993-03-22022 March 1993 Safety Insp Rept 50-213/93-01 on 930110-0220.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Surveillance,Emergency Preparedness,Lers, Quality Assurance Audits & Previously Identified Items IR 05000213/19920261993-02-25025 February 1993 Insp Rept 50-213/92-26 on 921213-930109.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Surveillance,Engineering & Technical Support, Licensee self-assessment & LERs IR 05000213/19920211993-01-15015 January 1993 Insp Rept 50-213/92-21 on 921115-1212.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Lers & Periodic Repts & Manual Operator Actions During Postulated Station Blackout IR 05000213/19920241992-12-30030 December 1992 Insp Rept 50-213/92-24 on 921130-1204.No Violations Noted. Major Areas Inspected:Function of Engineering & Technical Support Reviewed to Evaluate Staffing of Engineering Dept IR 05000213/19920251992-12-22022 December 1992 Insp Rept 50-213/92-25 on 921214-17.No Violations Noted. Major Areas Inspected:Mgt Organization,Training & Assurance of Quality 1999-08-20
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000213/20240012024-08-27027 August 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation NRC Inspection Report Nos. 07200039/2024001 and 05000213/2024001 IR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 IR 05000213/20210012021-10-26026 October 2021 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2021001 and 05000213/2021001 IR 07200039/20204012020-11-20020 November 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only) IR 05000213/20180012018-05-31031 May 2018 NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2018001 and 05000213/2018001, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 07200039/20184012018-05-17017 May 2018 Connecticut Yankee Atomic Power Company Independent Spent Fuel Storage Security Inspection Report No. 07200039/2018401 - (Cover Letter Only) IR 05000213/20160022016-11-22022 November 2016 NRC Inspection Report No. 05000213/2016002 and 07200039/2016002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20160012016-05-18018 May 2016 IR 05000213-16-001 and 07200039-16-001 on 4/21/16, Connecticut Yankee Atomic Power Company, East Hampton, CT Site IR 07200039/20140012014-05-0606 May 2014 IR 07200039-14-001, on 04/17-18/14, Independent Spent Fuel Installation Inspection, Connecticut Yankee Atomic Power Company, East Hampton, CT IR 07200039/20100012010-12-22022 December 2010 IR 07200039-10-001, on 11/29/10, Connecticut Yankee Atomic Power Company, East Hampton, CT IR 05000213/20070012007-11-20020 November 2007 IR 05000213-07-001, on 04/23-26/07, 06/06-07/07, 07/17/07, 09/04/07, 10/29/07, 10/31/07, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut IR 05000213/20060032007-04-11011 April 2007 IR 05000213-06-003, on 10/01/2006 - 03/30/2007, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20060022006-09-19019 September 2006 IR 05000213-06-002, on 06/26-29/2006, 07/24-28/2006, and 08/21-25/2006, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20060012006-07-14014 July 2006 IR 05000213-06-001, on 01/27/06 - 06/15/2006, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20050032006-02-0707 February 2006 IR 05000213-05-003; Connecticut Yankee Atomic Power Company; on 10/01/2006 - 01/26/2006; Connecticut Yankee Atomic Power Company IR 05000213/20050022005-11-10010 November 2005 IR 05000213-05-002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20050012005-08-0505 August 2005 IR 05000213-05-001, on 01/01/2005 - 03/31/2005, Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Office of Investigations Report No. 1-2004-032 and Notice of Violation IR 05000213/20040022005-02-0808 February 2005 IR 05000213-04-002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site and Notice of Violation IR 05000213/20040012004-09-20020 September 2004 IR 05000213-04-001, on 02/07/04 to 06/08/04, Connecticut Yankee Atomic Power Company IR 05000213/20030012003-07-0303 July 2003 IR 05000213-03-001 on 02/18/03 - 06/11/03 for Haddam Neck, Regarding Dismantlement and Decommissioning of Facility ML0320401272003-06-24024 June 2003 Powerpoint Presentation at Yankee Rowe Connecticut Yankee Management Meeting with the NRC, June 23, 2003 IR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000213/19980061999-06-0909 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/98-06 on 990226. Util Did Not Agree with Disposition of Issue Cited as Severity Level IV Violation.Violation Will Be Noncited IR 05000213/19990011999-05-21021 May 1999 Insp Rept 50-213/99-01 on 980119-990419.No Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility IR 05000213/19980051998-12-21021 December 1998 Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19980041998-11-27027 November 1998 Forwards Special Insp Rept 50-213/98-04 of Licensee Performance During Reactor Coolant Sys Chemical Decontamination ML20155F8511998-10-29029 October 1998 Insp Rept 50-213/98-04 on 980720-0911.Violations Noted. Major Areas Inspected:Aspects of Licensee Preparations, Planning & Implementation of RCS Chemical Decontamination, Operations,Engineering,Maint & Plant Support IR 05000213/19980031998-10-14014 October 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/98-03 Issued on 980821.Ack That Program Improvements for Violations That Occurred During Sys Decontamination,Still in Progress IR 05000213/19980011998-05-13013 May 1998 Insp Rept 50-213/98-01 on 980113-0413.Violations Noted.Major Areas Inspected:Decommissioning Support Activities,Spent Fuel Safety,Plant Support & Radiological Controls & Facility Mgt & Control IR 05000213/19980021998-05-0505 May 1998 Insp Rept 50-213/98-02 on 980316-20 & 25-27.No Violations Noted.Major Areas Inspected:Radiological Control Programs IR 05000213/19970091998-02-17017 February 1998 Insp Rept 50-213/97-09 on 971012-980112.Violations Noted. Major Areas Inspected:Decommissioning Operations & Planning & Included Aspects of Engineering,Maint & Plant Support IR 05000213/19970081998-01-29029 January 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/97-08 on 970703 & 0811-0919.Violation Involved Failure to Follow Radiation Protection Procedures IR 05000213/19970121998-01-15015 January 1998 Insp Rept 50-213/97-12 on 970812-13 & 1006-09.No Violations Noted.Major Areas Inspected:Status of Rp&C Facilities & Equipment IR 05000213/19970101998-01-14014 January 1998 Insp Rept 50-213/97-10 on 971008-1128.No Violations Noted. Major Areas Inspected:Plant Support IR 05000213/19970111997-12-29029 December 1997 Insp Rept 50-213/97-11 on 971006-09 & 1103-07.No Violations Noted.Major Areas Inspected:Programs for Radioactive Liquid Control IR 05000213/19970051997-11-26026 November 1997 Insp Rept 50-213/97-05 on 970708-1006.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Engineering & Plant Support IR 05000213/19970031997-11-0707 November 1997 Corrected Pages for Insp Rept 50-213/97-03 on 970408-0707 & 0805 IR 05000213/19970071997-11-0707 November 1997 Corrected Page for Insp Rept 50-213/97-07 on 970715-30 ML20198N2821997-10-29029 October 1997 Insp Rept 50-213/97-08 on 970703,0811-0919.Violations Noted. Major Areas Inspected:Applied Radiological Controls Program, Contamination Control Program & Training of Personnel Relative to 49CFR172,subpart H IR 05000213/19970061997-08-12012 August 1997 Insp Rept 50-213/97-06 on 970616-0718.Violations Noted. Major Areas Inspected:Radiological Controls Program at Cyap Station,Haddam,Ct IR 05000213/19970011997-07-31031 July 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/97-01 ML20149D6211997-06-13013 June 1997 Mgt Meeting Rept 50-213/97-03 on 970528.Areas Discussed: Actions in Response to Findings Detailed in NRC Insp Repts 50-213/96-12.96-201 & 97-01.Deficiencies Involved Implementation of Radiation Protection Program IR 05000213/19970041997-06-0303 June 1997 Physical Security Insp Rept 50-213/97-04 on 970505-08.No Violations Noted.Major Areas Inspected:Previously Identified Items,Mgt Control,Pa Detection Aids,Alarm Stations & Communication,Testing,Maint & Compensatory Measures IR 05000213/19950271997-05-12012 May 1997 Discusses Insp Repts 50-213/95-27,50-213/96-06,50-213/96-07, 50-213/96-08,50-213/96-11,50-213/96-80 & 50-213/96-201 on 951121-961122 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $650,000 ML20141F8301997-05-0808 May 1997 Insp Rept 50-213/97-01 on 970106-0407.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19960071997-04-0909 April 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/96-07 IR 05000245/19960121997-03-27027 March 1997 Informs That Info Will Be Withheld from Public Disclosure Per Licensee 970303 Request.Licensee Re Exam Rept 50-245/96-12,dtd 970207 Also Discussed IR 05000213/19970021997-03-21021 March 1997 Insp Rept 50-213/97-02 on 970207-07 & 0224-26.Violation Noted.Major Area Inspected:Programs for Radioactive Liquid & Gaseous Effluent Control,Including Organization & Effectiveness of Program Implementation IR 05000213/19960111997-03-0707 March 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/96-11.Exam of Actions Will Be Done During Future Insp IR 05000213/19960121997-02-25025 February 1997 Summary of Meeting Re Insp 50-213/96-12 on 970205 in King of Prussia,Pa to Discuss Findings Detailed in Insp Rept on 961102.Radiation Program Was Deficient in Several Areas That Resulted in Potential Exposure to Radiation 2024-08-27
[Table view] Category:UTILITY
MONTHYEARIR 05000213/19900831990-11-0505 November 1990 Insp Repts 50-213/90-83,50-245/90-82,50-336/90-82 & 50-423/90-83 on 900924-28.No Violations Noted.Major Areas Inspected:Licensee Timeliness for Reporting/Operability Determinations IR 05000213/19900821990-10-23023 October 1990 Insp Repts 50-213/90-82,50-245/90-81,50-336/90-81 & 50-423/90-82,on 901001-12.No Violations Noted.Major Areas Inspected:Licensee Occupational Radiation Protection Program Activities During Unit 1 Refueling Outage IR 05000213/19900131990-10-19019 October 1990 Safety Insp Rept 50-213/90-13 on 900801-0911.Good Radiological Controls Performance Noted.Major Areas Inspected:Plant Startup Following 1989/1990 Refueling Outage,Reactor Trips on 900813 & 0903 & Safeguards Problems IR 05000213/19900181990-10-10010 October 1990 Insp Rept 50-213/90-18 on 900926.No Violations Noted IR 05000213/19900121990-08-22022 August 1990 Safety Insp Rept 50-213/90-12 on 900621-0731.Major Areas Inspected:Review of Final Refueling Outage Activities, Preparations for Reactor Startup,Exams of safety-related Equipment Readiness & Review of Operational Events IR 05000213/19900081990-07-11011 July 1990 Insp Rept 50-213/90-08 on 900509-0620.Weaknesses Noted.Major Areas Inspected:Plant Operations,Reactor Fuel Reload Activities,Radiological Controls,Loss of Power Testing, Cleaning & Insp of RCS & Insp of Pressurizer Clad Cracks IR 05000213/19900051990-06-0606 June 1990 Safety Insp Rept 50-213/90-05 on 900328-0508.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls During Thermal Shield Shipping & Refueling Cavity Cleaning & Emergency Preparedness Training Exercise IR 05000213/19900091990-06-0404 June 1990 Emergency Preparedness Insp Rept 50-213/90-09 on 900518-20. Unresolved Item & Exercise Weaknesses Identified.Major Areas Inspected:Licensee full-participation Emergency Preparedness Exercise Conducted on 900519 IR 05000213/19900071990-05-18018 May 1990 Insp Rept 50-213/90-07 on 900402-05.No Violations Noted. Major Areas Inspected:Changes to Emergency Plan & Implementing Procedures,Emergency Response Facilities, Equipment & Organization & Mgt Control IR 05000213/19900041990-04-18018 April 1990 Safety Insp Rept 50-213/90-04 on 900216-0327.No Violations Noted.Major Areas Inspected:Plant Operations & Radiological Controls During Thermal Shield Cutting & Cleaning of Refueling Water Storage Tank IR 05000213/19900061990-04-13013 April 1990 Insp Rept 50-213/90-06 on 900314-16.No Violations Noted. Major Areas Inspected:Licensee Program to Ensure Adequate Quality of Fuel Oil for Emergency Diesel Generators to Meet Tech Spec Operational Requirements IR 05000213/19900021990-03-14014 March 1990 Insp Rept 50-213/90-02 on 900109-0215.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls During Thermal Shield Removal,Reactor Vessel Thermal Shield Removal & App R Svc Water Performance Testing & Security IR 05000213/19890231989-12-28028 December 1989 Insp Rept 50-213/89-23 on 891127-1201.No Violations or Deviations Noted.Major Areas Inspected:Pump & Valve Inservice Test Program Implementation & Licensee Corrective Action Program for Leakage Problem Evaluation & Correction IR 05000213/19890221989-12-12012 December 1989 Insp Rept 50-213/89-22 on 891113-17.Violation Noted.Major Areas Inspected:Radiological Controls Program,Including Training & Qualifications of Health Physics Staff,Auditing, Internal Exposure Control & New TLD Personnel Dosimetry IR 05000213/19890161989-11-0808 November 1989 Safety Insp Rept 50-213/89-16 on 890906-1017.No Unresolved Items Noted.Major Areas Inspected:Plant Operations,Events Occurring During Insp Period Including Elevated RCS Activity,Radiological Controls,Security & Maint IR 05000213/19890191989-11-0202 November 1989 Insp Rept 50-213/89-19 on 891016-20.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp,Steam Generator Eddy Current & Erosion/Corrosion Programs & Status of Debris in Fuel Bundles IR 05000213/19890171989-11-0101 November 1989 Insp Rept 50-213/89-17 on 891002-06.No Violations Noted. Major Areas Inspected:Radiological Control Activities During Refueling Outage & Radiological Controls Program Onsite IR 05000213/19890181989-10-24024 October 1989 Insp Rept 50-213/89-18 on 891010-13.No Violations Noted. Major Areas Inspected:Operational Radiological Environ Monitoring Program,Including Mgt Organization,Sample Collection & Control of Contractor Activities IR 05000213/19890151989-10-12012 October 1989 Insp Rept 50-213/89-15 on 890911-15.No Violations Noted. Major Areas Inspected:Previously Identified Open Items & Adequacy of Resolution IR 05000213/19890121989-09-29029 September 1989 Insp Rept 50-213/89-12 on 890726-0905.No Violations Noted. Major Areas Inspected:Plant Operations,Radiation Protection, Fire Protection,Security,Maint,Surveillance Testing,Licensee Events,Open Items & Opening of New Security Access Point IR 05000213/19890141989-09-21021 September 1989 Insp Rept 50-213/89-14 on 890911-15.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Sys, Transportation,Liquid & Gaseous Effluents Programs, Including Mgt Controls,Audits & QA IR 05000213/19890131989-09-15015 September 1989 Insp Rept 50-213/89-13 on 890814-18.No Violations Noted. Major Areas Inspected:Const Activities of New Switchgear Bldg Constructed to Comply W/App R Requirements & Review of Adequacy & Implementation of Fire Protection Program IR 05000213/19890111989-08-24024 August 1989 Safety Insp Rept 50-213/89-11 on 890731-0804.No Violations Noted.Major Areas Inspected:Changes to Emergency Preparedness Program,Emergency Facilities,Equipment, Instrumentation,Supplies & Organization & Mgt Control IR 05000213/19890101989-08-18018 August 1989 Safety Insp Rept 50-213/89-10 on 890614-0725.No Violations & No New Unresolved Items Noted.Major Areas Inspected:Plant Operations,Radiation Protection,Fire Protection,Security, Maint,Surveillance Testing,Open Items & Safety Sys Lineups IR 05000213/19890091989-08-0303 August 1989 Partially Withheld Physical Security Insp Rept 50-213/89-09 on 890626-30 (Ref 10CFR73.21 & 2.790(a)).No Violations Noted.Major Areas Inspected:Mgt Support,Program Plans, Audits & Protected & Vital Area Physical Barriers IR 05000213/19890071989-07-11011 July 1989 Insp Rept 50-213/89-07 on 890503-0613.Violations Noted. Major Areas Inspected:Plant Operations,Radiation Protection, Fire Protection,Security,Maint,Surveillance Testing,Licensee Events & Open Items from Previous Insps IR 05000213/19890081989-07-0707 July 1989 Insp Rept 50-213/89-08 on 890614-16.No Violations Noted. Major Areas Inspected:Radiological Controls Program on Site, Including Changes in Organization,Personnel,Procedures & Review of Preparations for Refueling Outage ML20247J2391989-05-19019 May 1989 Insp Rept 50-213/89-200 on 890130-0210.Weaknesses Noted Re Installation of commercial-grade Items.Major Areas Inspected:Implementation of Vendor Interface Program & Program for Procurement of Items in safety-related Sys IR 05000213/19890051989-05-17017 May 1989 Safety Insp Rept 50-213/89-05 on 890329-0502.Violation Noted.Major Areas Inspected:Plant Operations,Radiation Protection,Fire Protection,Security,Maint,Surveillance Testing & Licensee Events IR 05000213/19890041989-05-12012 May 1989 Insp Rept 50-213/89-04 on 890421-22.No Violations Noted. Major Areas Inspected:Emergency Preparedness & Observation of Licensee partial-participation,emergency Preparedness Exercise Conducted on 890422 IR 05000213/19890021989-05-0303 May 1989 Safety Insp Rept 50-213/89-02 on 890222-0328.No Violations Noted.Major Areas Inspected:Plant Operations,Radiation Protection,Fire Protection,Security,Maint,Surveillance Testing,Events Occurring During Insp & Open Items IR 05000213/19890011989-03-10010 March 1989 Insp Rept 50-213/89-01 on 890104-0221.No Violations Noted. Major Areas Inspected:Plant Operations,Radiation Protection, Fire Protection,Security,Maint,Surveillance Testing,Noble Gas Source Investigation & Reactor Containment Temp IR 05000213/19880191988-12-0101 December 1988 Insp Rept 50-213/88-19 on 880928-1115.No Violations Noted. Major Areas Inspected:Plant Operations,Radiation Protection, Fire Protection,Security,Maint,Surveillance Testing,Licensee Events & Containment Integrated Leak Rate Test Rept IR 05000213/19880211988-11-15015 November 1988 Physical Security Insp Repts 50-213/88-21,50-245/88-22, 50-336/88-25 & 50-423/88-21 on 881017-21.No Noncompliance Noted.Major Areas Inspected:Safeguards Info Program - Corporate Ofcs IR 05000213/19880201988-11-0808 November 1988 Insp Rept 50-213/88-20 on 881014-16.No Violations,Deviations or Unresolved Items Noted.Major Areas Inspected:Emergency Preparedness Exercise Conducted on 881014-16 IR 05000213/19880161988-11-0404 November 1988 Insp Rept 50-213/88-16 on 880830-31 & 0901.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program IR 05000213/19880181988-10-14014 October 1988 Insp Rept 50-213/88-18 on 880906-09.No Violations Noted. Major Areas Inspected:Radiological Controls Program, Including Radiation Surveys,Respirator Issue & Maint,Air Sampling Equipment Calibr & Counting Room Operations IR 05000213/19880151988-10-12012 October 1988 Safety Insp Rept 50-213/88-15 on 880801-0912.No Violations Noted.Major Areas Inspected:Plant Operations,Radiation Protection,Fire Protection,Security,Maint,Surveillance Testing,Licensee Events & Open Items from Previous Insps IR 05000213/19880131988-10-0606 October 1988 Insp Rept 50-213/88-13 on 880822-26.No Violations Noted. Major Areas Inspected:Radiochemical Measurements Program, Including Confirmatory Measurements,Program for Qa/Qc of Radiological Measurements & Mgt Controls IR 05000213/19880171988-09-26026 September 1988 Insp Rept 50-213/88-17 on 880822-26.No Violations Noted. Major Areas Inspected:Inservice Insp Program Per ASME Code & Regulatory Requirements IR 05000213/19880141988-08-16016 August 1988 Insp Rept 50-213/88-14 on 880719-22.No Violations Noted. Major Areas Inspected:Concrete Work & Records,Structural Steel Work & Records for New Switchgear Bldg IR 05000213/19880111988-07-31031 July 1988 Insp Rept 50-213/88-11 on 880517-0731.No Violations Noted. Major Areas Inspected:Plant Operations,Radiation & Fire Protection,Security Maint,Surveillance Testing,Switchgear Bldg Const & Open Items from Previous Insps IR 05000213/19880091988-07-22022 July 1988 Insp Rept 50-213/88-09 on 880516-20.No Violations or Deviations Noted.Major Areas Inspected:Steam Generator Inservice Insp,Secondary Water Chemistry Control,Radiation Protection Results & Insp of Other Secondary HXs IR 05000213/19880101988-06-21021 June 1988 Insp Rept 50-213/88-10 on 880523-27.No Violations Noted. Major Areas Inspected:Operational Radiological Environ Monitoring Program,Including Mgt Organization,Environ Sample Collection & Meteorological Monitoring IR 05000213/19880081988-05-27027 May 1988 Safety Insp Rept 50-213/88-08 on 880405-0516.No Violations Noted.Major Areas Inspected:Plant Operations,Radiation Protection,Fire Protection,Security,Maint,Surveillance Testing & Generic Ltrs 87-12 & 81-21 IR 05000213/19880061988-04-21021 April 1988 Insp Rept 50-213/88-06 on 880307-11.No Violations Noted. Major Areas Inspected:Assurance of Readiness for Mode Changes Leading to Power Operation Based on Review of Operations,Mods,Preoperational/Startup & Low Physics Tests IR 05000213/19880031988-04-20020 April 1988 Insp Rept 50-213/88-03 on 880301-0404.No Violations Noted. Major Areas Inspected:Plant Operations,Radiation Protection, Fire Protection,Security,Maint,Surveillance Testing,Licensee Events & Open Items from Previous Insps IR 05000213/19880071988-04-0101 April 1988 Insp Rept 50-213/88-07 on 880314-17.No Violations Noted. Major Areas Inspected:Plan & Implementing Procedures, Organization,Program Audit,Records & Repts,Testing & Maint, Physical Barriers,Protected & Vital Areas & Lighting ML20151C1791988-03-29029 March 1988 Insp Rept 50-213/87-28 on 871116-20.Violations Noted. Major Areas Inspected:Licensee Implementation of Environ Qualification Program & Verification of Implementation Per 10CFR50.49 Requirements IR 05000213/19880021988-03-11011 March 1988 Safety Insp Repts 50-213/88-02 on 880113-0229.No Violations Noted.Major Areas Inspected:Outage Activities,Radiation Protection,Fire Protection,Security,Maint,Surveillance Testing & Events Occurring During Insp Period 1990-08-22
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-I-99-039, on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting1999-09-0101 September 1999 PNO-I-99-039:on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting IR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000213/19990011999-05-21021 May 1999 Insp Rept 50-213/99-01 on 980119-990419.No Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility ML20206R7391999-05-12012 May 1999 Notice of Violation from Investigation on 970616-0718. Violations Noted:On 961209 & 10,J Foley Deliberately Caused Util to Be in Violation of 10CFR50.9 & TS 6.11 & in June 1997 Provided Inaccurate Info to NRC Inspector ML20206R7141999-05-12012 May 1999 Notice of Violation from Investigation on 970314-0722. Violation Noted:M Thomas Engaged in Deliberate Misconduct on 970227,that But for Detection,Would Have Caused Licensee to Be in Violation of 10CFR20.1802 ML20205J8031999-04-0505 April 1999 Notice of Violation from Insp on 961102-27.Violation Noted:Licensee Failed to Adequately Instruct Workers & Failed to Perform Adequate Radiological Surveys in Reactor Cavity & Fuel Transfer Cavity ML20206B3801999-03-29029 March 1999 EN-99-015:informs Commission That Staff Intends to Exercise Discretion Pursuant to Section VII.B.6 of Enforcement Policy & Not Propose Civil Penalty for Severity Level III Problem That Occurred in Nov 1996,prior to Licensee Decision ML20207B7041999-02-26026 February 1999 Notice of Violation from Insp on 981103-990118.Violations Noted:Two Different Locked High Radiation Area Doors in Containment Builiding Found Unlocked & Unattended IR 05000213/19980051998-12-21021 December 1998 Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20155F8511998-10-29029 October 1998 Insp Rept 50-213/98-04 on 980720-0911.Violations Noted. Major Areas Inspected:Aspects of Licensee Preparations, Planning & Implementation of RCS Chemical Decontamination, Operations,Engineering,Maint & Plant Support ML20237D4071998-08-21021 August 1998 Notice of Violations from Insp on 980414-0803 & 13. Violations Noted:Licensee Failed to Declare Unusual Event Re 980620 Release of About 800 Gallons of Water Containing Approx 2200 Uci Radioactivity from a Waste Test Tank PNO-I-98-033, on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee1998-07-28028 July 1998 PNO-I-98-033:on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee IR 05000213/19980011998-05-13013 May 1998 Insp Rept 50-213/98-01 on 980113-0413.Violations Noted.Major Areas Inspected:Decommissioning Support Activities,Spent Fuel Safety,Plant Support & Radiological Controls & Facility Mgt & Control IR 05000213/19980021998-05-0505 May 1998 Insp Rept 50-213/98-02 on 980316-20 & 25-27.No Violations Noted.Major Areas Inspected:Radiological Control Programs ML20203E6771998-02-17017 February 1998 Notice of Violation from Insp on 971012-980112.Violation Noted:Licensee Did Not Provide for Verifying or Checking Adequacy of Design for Listed Sys & Components IR 05000213/19970091998-02-17017 February 1998 Insp Rept 50-213/97-09 on 971012-980112.Violations Noted. Major Areas Inspected:Decommissioning Operations & Planning & Included Aspects of Engineering,Maint & Plant Support IR 05000213/19970121998-01-15015 January 1998 Insp Rept 50-213/97-12 on 970812-13 & 1006-09.No Violations Noted.Major Areas Inspected:Status of Rp&C Facilities & Equipment IR 05000213/19970101998-01-14014 January 1998 Insp Rept 50-213/97-10 on 971008-1128.No Violations Noted. Major Areas Inspected:Plant Support IR 05000213/19970111997-12-29029 December 1997 Insp Rept 50-213/97-11 on 971006-09 & 1103-07.No Violations Noted.Major Areas Inspected:Programs for Radioactive Liquid Control PNO-I-97-073A, on 971210,update of Offsite Surveys for Contaminated Blocks Made.Total of 114 Blocks Out of 3032 Indicated Radioactive Contamination at Greater than Two Times Background Levels.Licensee Plans to Return to Sites1997-12-11011 December 1997 PNO-I-97-073A:on 971210,update of Offsite Surveys for Contaminated Blocks Made.Total of 114 Blocks Out of 3032 Indicated Radioactive Contamination at Greater than Two Times Background Levels.Licensee Plans to Return to Sites PNO-I-97-074, on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations1997-12-0404 December 1997 PNO-I-97-074:on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations PNO-I-97-073, survey Identified Former Cask Wash Down Area Needing Further Characterization & Remediation within Licensee Control Area.Concrete Blocks Used for Temporary Shield Wall Was Used by 15 Households as of 9711301997-12-0101 December 1997 PNO-I-97-073:survey Identified Former Cask Wash Down Area Needing Further Characterization & Remediation within Licensee Control Area.Concrete Blocks Used for Temporary Shield Wall Was Used by 15 Households as of 971130 IR 05000213/19970051997-11-26026 November 1997 Insp Rept 50-213/97-05 on 970708-1006.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Engineering & Plant Support IR 05000213/19970071997-11-0707 November 1997 Corrected Page for Insp Rept 50-213/97-07 on 970715-30 IR 05000213/19970031997-11-0707 November 1997 Corrected Pages for Insp Rept 50-213/97-03 on 970408-0707 & 0805 ML20198N2761997-10-29029 October 1997 Notice of Violation from Insp on 970703,0811-0919.Violation Noted:On 950222,individual Working on Radiation Work Permit (RWP) 1950603,received Facial Contamination & Not Sent to Be whole-body-counted ML20198N2821997-10-29029 October 1997 Insp Rept 50-213/97-08 on 970703,0811-0919.Violations Noted. Major Areas Inspected:Applied Radiological Controls Program, Contamination Control Program & Training of Personnel Relative to 49CFR172,subpart H ML20217J3981997-10-0909 October 1997 Notice of Violation from Insp on 970408-0805.Violations Noted:From 960814-970311,licensee Did Not Assure That Significant Condition Adverse to Quality Was Promptly Corrected ML20199B5731997-10-0202 October 1997 EN-97-095:on 971009,staff Intends to Issue Notice of Violation for Two Severity Level III Violations of App B, Criterion Xvi, Corrective Actions. Violations Involved Discovery of Old Plant Design Discrepancy in SWS ML20210P0101997-08-12012 August 1997 Notice of Violation from Insp on 970616-0718.Violation noted:post-dive Diver Tritium Bioassay Sample for 961108 Dive Was Not Shipped as Expeditiously as Possible for Analysis & No Preservative Was Added IR 05000213/19970061997-08-12012 August 1997 Insp Rept 50-213/97-06 on 970616-0718.Violations Noted. Major Areas Inspected:Radiological Controls Program at Cyap Station,Haddam,Ct PNO-I-97-049, on 970807,inadvertent Actuation of Halon Sys Occurred Affecting CR & Adjacent Central Alarm Station. Personnel Took Photographs of Panel of Halon Actuation Panel,Prior to Actuation.Root Cause of Actuation Evaluated1997-08-0808 August 1997 PNO-I-97-049:on 970807,inadvertent Actuation of Halon Sys Occurred Affecting CR & Adjacent Central Alarm Station. Personnel Took Photographs of Panel of Halon Actuation Panel,Prior to Actuation.Root Cause of Actuation Evaluated ML20149D6211997-06-13013 June 1997 Mgt Meeting Rept 50-213/97-03 on 970528.Areas Discussed: Actions in Response to Findings Detailed in NRC Insp Repts 50-213/96-12.96-201 & 97-01.Deficiencies Involved Implementation of Radiation Protection Program IR 05000213/19970041997-06-0303 June 1997 Physical Security Insp Rept 50-213/97-04 on 970505-08.No Violations Noted.Major Areas Inspected:Previously Identified Items,Mgt Control,Pa Detection Aids,Alarm Stations & Communication,Testing,Maint & Compensatory Measures ML20141D2621997-05-12012 May 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $650,000.Violation Noted:Licensee Did Not Assure That Applicable Regulatory Requirements & Design Basis Were Correctly Translated Into Specifications ML20140G4491997-05-12012 May 1997 EN-97-035:on 970512,notice of Proposed Imposition of Civil Penalty in Amount of $650,000 Issued to Licensee.Action Based on Three Severity Level II Problems Consisting of Multiple Individual Violations ML20141F8301997-05-0808 May 1997 Insp Rept 50-213/97-01 on 970106-0407.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20141F8181997-05-0808 May 1997 Notice of Violation from Insp on 970106-0407.Violation Noted:No RCS Chemistry Samples Were Taken from 961115-970206 IR 05000213/19970021997-03-21021 March 1997 Insp Rept 50-213/97-02 on 970207-07 & 0224-26.Violation Noted.Major Area Inspected:Programs for Radioactive Liquid & Gaseous Effluent Control,Including Organization & Effectiveness of Program Implementation PNO-I-97-014, on 970227,retrieval of Contaminated Matl at Vendor Facility Made.Licensee Dispatched Survey Team, Consisting of HP Supervisor,Hp Technician & Radioactive Matl Handler to Vendor Facility to Survey & Retrieve Matl1997-02-28028 February 1997 PNO-I-97-014:on 970227,retrieval of Contaminated Matl at Vendor Facility Made.Licensee Dispatched Survey Team, Consisting of HP Supervisor,Hp Technician & Radioactive Matl Handler to Vendor Facility to Survey & Retrieve Matl IR 05000213/19960121997-02-25025 February 1997 Summary of Meeting Re Insp 50-213/96-12 on 970205 in King of Prussia,Pa to Discuss Findings Detailed in Insp Rept on 961102.Radiation Program Was Deficient in Several Areas That Resulted in Potential Exposure to Radiation ML20138J6721997-02-0404 February 1997 Notice of Violation from Insp on 961116-970105.Violation Noted:On 961127,during Preparations to Test EG2B After Jacking Engine,Operator Failed to Remove Crank Over Tool Per Step 6.2.10 Prior to Running Diesel for One Hour Test ML20138J6751997-02-0404 February 1997 Insp Rept 50-213/96-13 on 961116-970105.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Plant Support ML20133A5031996-12-24024 December 1996 Insp Rept 50-213/96-11 on 960921-1115.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20133A4911996-12-24024 December 1996 Notice of Violation from Insp on 960921-1115.Violation Noted:On 960924,B Residual Heat Removal Pump Failed Due to Inherent Manufacturing Defects & Marginal Design Tolerance ML20132G6211996-12-19019 December 1996 Insp Rept 50-213/96-12 on 961102-27.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review of Airborne Radioactivity Event That Occurred on 961102 PNO-I-96-085, on 961204,board of Directors of Connecticut Yankee Atomic Power Co Voted to Retire Haddam Neck Nuclear Power Generating Station,After Nearly 29 Yrs of Svc.Nrc Responding to Media Inquires & Present at Press Conference1996-12-0505 December 1996 PNO-I-96-085:on 961204,board of Directors of Connecticut Yankee Atomic Power Co Voted to Retire Haddam Neck Nuclear Power Generating Station,After Nearly 29 Yrs of Svc.Nrc Responding to Media Inquires & Present at Press Conference PNO-I-96-080, on 961102,two Radiation Workers Entered Reactor Cavity & Fuel Transfer Canal Area to Inspect & Collect Debris in Preparation for Flooding Cavity to Accomplish Defueling Operation Causing Airborne Contamination1996-11-0808 November 1996 PNO-I-96-080:on 961102,two Radiation Workers Entered Reactor Cavity & Fuel Transfer Canal Area to Inspect & Collect Debris in Preparation for Flooding Cavity to Accomplish Defueling Operation Causing Airborne Contamination IR 05000213/19960101996-11-0505 November 1996 Insp Rept 50-213/96-10 on 960811-0920.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000213/19960801996-10-30030 October 1996 Insp Rept 50-213/96-80 on 960903-1002.Violation Noted. Major Areas Inspected:Operations,Maint,Engineering & Mgt Oversight & Controls 1999-09-01
[Table view] |
Text
,
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Report No.
50-213/85-17 Docket No.
50-213 License No. DPR-61 Licensee: Connecticut Yankee Atomic Power Company Facility Name:
Haddam Neck Plant Inspection At:
Berlin, CT and Haddam Neck, CT Inspection Conducted: August I and 2, 1985 Inspectors:
.k.
hlc /8"S '
P. K. Eapen, Chief,
'date'
Quality Assurance Section h f/3 WNw
$)l2Nd$
L. HT Bettenhausen, Chief, date Operati sB c
8M3/h--
Approved by:
%
'
S. D. Ebneter, Director dat6 Division of Reactor Safety Inspection Summary:
Special announced inspection (Report No. 50-213/85-17) to review the status of the licensee's actions in response to the NRC order dated December 13, 1985.
The inspection involved 30 inspection hours at Northeast Utilities office in Berlin, Connecticut and 6 inspection hours at Haddam Neck Plant.
Areas Inspected:
Plant Design Change Requests (PDCRs), PDCR Task Group reviews, and Plant Operations Review Committee's PDCR reviews.
Results: No violations or deviations were identified. The licensee's actions in response to the NRC order dated December 13, 1985 were being implemented adequately.
8509030358 850826 PDR ADOCK 05000213 G
pm
_
.
.
DETAILS 1.0 Persons Contacted Northeast Utilities Plant Design Change Task Group Members
A. Tuthill Others R. Test, Director, Nuclear Training S. Scace, Manager, Safety Analysis Haddam Neck Plant W. Bartron, Maintenance Supervisor R. Brown, Operation Supervisor
- R. Graves, Station Superintendent
- J. Ferguson, Unit Superintendent
- Denotes those present at the Berlin, Connecticut Exit Meeting.
- Denotes those present at the Haddam Nc-L Plant Exit Meeting.
,
The inspector also interviewed other management and technical personnel in the course of this review.
l'
2.0 Background An Order Modifying License and a Notice of Violation were issued to
!
Connecticut Yankee Atomic Power Company on December 13, 1984 as enforcement I
actions in response to the failure of the reactor cavity seal at the Haddam Neck plant on August 21, 1984. The licensee's response to the Order, dated January 28, 1985 described in detail the method of conducting a review
,
of the plant design change process and historical records related to Haddam Neck, the external oversight of the review effort, the management attention and safety ethic training being given and the revisions to upgrade the plant design change request procedures.
In addition, the licensee described interim actions taken to improve the design change process in a letter dated March 22, 198 _ -..
_
_ _ _
_
,
.
.
3.0 Scope of Inspection
This inspection assessed conformance to the commitments of the January 28,
'
1985, and March 22, 1985 responses to the NRC order.
It included review of the Plant Design Change Task Group's (PDCTG) activities, the oversight exercised by the Plt.nt Design Change External Review Group (ERG), the train-ing and management direction on safety ethic, the adoption and incorporation of upgraded plant design change procedures at Northeast Utilities and at Haddam Neck, progress and plans in upgrading such design basis documents as drawings, and Material Equipment and Parts List, and performance of integrated safety evaluations in accordance with revised procedures.
4.0 Implementation of Interim Action Commitments The licensee documented in his March 22, 1985 response to the NRC order those interim actions that would be implemented prior to completion of the other actions called for in the order.
In addition, several commitments were made in other correspondence such as the response to order dated January 28, 1985 which committed to providing safety ethic training to all l
Nuclear Engineering & Operations (NE&O) Group personnel by the end of 1985, These interim actions and commitments were reviewed by the NRC staff to i'
verify the commitment had been met and actions were implemented.
4.1 Plant Desien Change Procedure Upgrades Two commitments were made in this area.
One was to review and upgrade procedures associated with the implementation of plant design changes and to have the upgraded procedures approved by November 1,1984.
Some of these procedures were revisions of existing procedures, while others were newly developed to meet identified deficiencies.
Fif teen
,
Nuclear Engineering and Operations (NE&O) procedures were involved; all were approved on November 1, 1985.
The inspector reviewed the procedure changes discussed below.
I The licensee stated in his response that all safety evaluations are performed in accordance with NE&O Procedure 3.12.
The commitment dis-cussed the use of integrated safety evaluations (ISEs) to supplement discipline specific safety evaluations.
Revision 1 to NE&O 3.12, Safety Evaluations dated November 1, 1984 incor-porated detailed guidance to the evaluator which include examples of 10 CFR 50.59 considerations, typical safety limits, accident classifi-cations and a decision tree based on 10 CFR 50.59. The procedure was explained to Northeast Utilities (NU) staff by a Senior Vice-President's memorandum dated November 9, 1984.
This memo transmitted the procedure,
,
explained the background and noted the NU staff's responsibility for
t accomplishing-integrated safety evaluations.
The section on design verification in Procedure NE&O 03.03 was revised to state that the
'
__
..
-
..-m
,
m...
_ _, __
_ _.. _ _ _ _ _ _ _. -
..,,,_m r,_,
. - -
-. - - _ - _ _ -.., -.,
-
.
.
review shall also consider the potential consequences of any failure associated with the proposed modification.
The normal design verifi-cation is performed in accordance with NE&O 5.05, Design Inputs and Design Verification, Rev. O, dated November 1, 1984.
In NE&O 5.05, Figure 7.1 is a series of questions similar to those questions posed in American National Standard ANSI N45.2.11-1974, Quality Assurance Requirements for the Design of Nuclear Power Plants.
The NRC staff interviewed the Manager of Safety Analysis, Task Force members, and Haddam Neck personnel in relation to ISEs. All agreed that communications, relating to design changes, among various inter-facing groups had significantly improved.
In addition an increase had been experienced in the number of PDCRs submitted for ISE.
The second commitment was to implement the upgraded procedures at Haddam Neck by February 28, 1985.
The inspector reviewed the current plant procedures manual at Haddam Neck and found that the appropriate NE&O procedures had been implemented at the plant by replacing, or adding to, the existing administrative procedures and following the normal review and approval cycle for plant procedures. This was accomplished by February 28, 1985.
Some difficulties were encountered in the adaptation of the company-level procedures to specific situations at the plant.
In several instances these difficulties were surmounted by issuing Temporary Procedure Changes to clarify portions of a proce-dure or to extend the scope of the procedure to other plant activities.
One procedure, NE&O 8.01, Jumper, Lifted Lead and Bypass Control, has required revision and problems are still being encountered in imple-mentation. The plant is developing case histories to show that further changes to this procedure are needed.
The inspector had no further questions.
Commitments regarding upgrad-ing of design change procedures were met.
4.2 Safety Ethic Training The licensee's response dated January 28, 1985 to the NRC order iden-tified in several places the need to " reprogram" the licensee staff and redirect the thought process related to safety evaluations. As part of this, the licensec committed to provide safety ethic training to all NE&O personnel by the end of 1985. The NRC staff reviewed progress on this item.
The Senior Vice President, during January and February 1985, conducted four (4) safety ethic sessions at the Millstone site, two at the Haddam Neck site and three at the Berlin offices which were directed at supervisory and senior level staff. The Training Department conducts a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Safety Ethic course for other personnel.
The NRC staff reviewed the Senior Vice President presentation which addressed NE&Os commitment to excellence, safety ethic, plant modifi-cations and corporate goals.
_
- - - -
-__,_._r
&
l_
.
.
>
The approximate status of attendance at either one or the other safety ethic presentations to date is:
Millstone Unit 1 85-90% of station staff Millstone Unit 2 85-90% of station staff Haddam Neck 85-90% of station staff Betterment Construction - 100% of staff Engineering / Design
- 65-70% of staff The Training Department is tracking attendance and notifies organiza-tions of those who have not attended one of the presentations so that they can be scheduled for one of the courses. The licensee expects that the commitment that all NE&O persons receive safety ethic training by the end of 1985 will be met.
4.3 Material Equipment and Parts List (MEPL)
The licensee's actions to improve the MEPL were reviewed.
In response to the order and a violation identified in NRC inspection 50-213/84-26, the licensee instituted several measures to improve the MEPL and to provide better control for activities supporting the MEPL. These measures were discussed in the licensee letter dated February 25, 1985.
Each of these measures and its status are given below.
The inspector noted that the licensee has completed the review and the updated MEPL was issued on March 3, 1985. This update incorporated
!
several new components, such as FO-LCV-1700 A&B valves which were in-
!
advertantly left out from the previous MEPL.
It also added Appendix D to address the quality assurance requirements for fire protection-equipment. Additionally, the corporate engineering staff reviewed the existing Process and Instrumentation diagrams (P& ids) to assure that all identified components were incorporated in the MEPL.
The inspector reviewed the P& ids for the RHR and Main Steam systems with the cognizant engineers and noted that components such as RH-V-25A, 26A, 27A and 28A and BD-V-507A, 508, and 531 were identified as being omitted during the licensee review and were incorporated in the MEPL on March 5, 1985.
,
l The licensee has also recognized the need for updating the P& ids to reflect as-built system configurations.
For this effort, the licensee has retained a consultant to perform the as-built system walkdowns.
The licensee's representatives stated that these walkdowns are presently scheduled for completion by January 1988.
Upon completion of the as-built system walkdown, MEPL will be reviewed and updated to incer-porate any additional components identified during such walkdowns.
NE&O Procedure 6.01 (November 1, 1984) provides assurance that safety related components will be identified properly. The inspector reviewed NE&O 6.01 and noted that the procedure identifies responsibilities for the maintenance and upkeep of the MEPL.
Section 6.1.1 of this
_
w
.
.-
procedure requires a MEPL evaluation for a component prior to its modification or repair if that component is not in the MEPL but it belongs to a system identified in the MEPL. As a result of this pro-cedure, MEPL evaluations and the safety classification determination of the components are more rigorous and conservative. Additionally, in April 1985, the licensee established a list of non-category I systems at Connecticut Yankee Plant to further ease the component classifica-tion burden during modification / repair activities at the plant.
NUSCO QA Audit A60222 on April 2-16, 1985 was performed to assess the impact of the use of the previous MEPL on Purchase Requisitions and Work Orders written during 1983 and 1984.
This audit identified that 10,000 non-QA work orders and 5,500 QA work orders were issued during the.1983-84 time period. A total of 225 work orders from the non-QA category and 370 work orders from QA category were considered to be significant as they involved material replacement, repair or modifica-tion. The audit team sampled 90 significant work orders from the non-QA category and 250 significant work orders from QA category for detailed review.
Eight (8) non-QA work orders were improperly classi-fied and 5 QA work orders contained improper material classification.
The audit team issued two findings to address these concerns. The response to these concerns was timely and effective. The response indicated that a detailed review of all 1984 non-QA work orders was conducted and less than one percent of such orders were noted to be classified improperly. The improper material classifications in QA work orders were stated to be caused by inadequate guidance in the governing procedures. The corrective actions included revisions to three procedures to provide specific guidance.
The inspector found the above actions to be consistent with the licen-see's statements in letters dated March 22, 1985 and February 25, 1985.
These actions adequately address the Concerns identified in NRC letter dated December 28, 1984. Therefore, violation 84-26-01 is closed.
The effectiveness of the activities to update the P& ids to reflect as-built configurations will be reviewed in future NRC inspections.
There were no further questions.
5.0 Status of Plant Design Change Task Group (PDCTG)
The NRC staff met with the members of the PDCTG and discussed the status of the group's independent review of previous Haddam Neck Plant design changes.
The PDCTG.has essentially completed the review and assessment and has sub-mitted a draft report dated July 26, 1985 to the independent External Review Group (ERG) and licensee management.
The NRC staff interpretation of the order is that any submittal of draft reports to licensee management should be simultaneously submitted to the Regional Administrator, NRC Region I.
-The Task Group (TG) was charged with reviewing all Plant Design Change Requests (PDCR) made at Haddam Neck between January 1, 1979 and December 31, 1984. This review evaluated the PDCR's for potential problems or unreviewed safety issues and further evaluated flawed PDCR's to identify deficiencies e
.-
- -
.
_.
- _ -.
-
_-
--
- ---._
_
.
j
-
.
in the design change process and procedures.
Early in this review, the PDCTG recognized that work done under plant Work Permits potentially might
,
result in modifications to the plant; a contractor was hired to screen Work Permits and similar work controls for potential design modifications.
The PDCTG screened 355 PDCR's.
Thirty-five (35) of these resulted in detailed evaluations.
From one of these evaluations, it was concluded
,
that an unanalyzed minor leakage path for radioactive coolant could result
'
following an accident; this was reported in accordance with 10 CFR 50.72
on August 2, 1984.
Several other evaluations will lead to reanalysis or confirmation of design or test information, but no substantial design over-sights were identified from this detailed, thorough, multi-disciplinary evaluation of these 35 PDCR's.
The 35 PDCR's resulting from the screening and 5 more test cases, including the reactor cavity seal design, were used
-
i to examine the design change process as defined by the procedures in place subsequent to November,1984. The PDCTG preliminary conclusion is that no a
substantive changes are required in the process.
The deficiencies identi-fied were the result of either procedural nonadherence (it must be recog-nized that many of the procedures did not exist when the PDCR was done) or inadequate design basis such as accident analysis details, incomplete draw-i ings and fully documented Materials Equipment and Parts List.
The PDCTG developed a manual of procedures to control their work and added
!
procedures to control the contractor review of work requests. The NRC staff reviewed these procedures and discussed their implementation with the PDCTG members. The NRC staff independently reviewed 8 PDCR's selected by the PDCTG, 5 PDCR's and 2 of the 12 jumpers reviewed and not selected for future-evaluation by the PDCTG. The method of review, the questions asked and resolved by the TG and the conclusions reached on each PDCR were
'
documented in the review packages.
PDCTG members were knowledgeable of the selection process, the questions resolved and the issues involved.
In one case examined, a PDCTG member was involved in the original PDCR review; he disqualified himself and an alternate TG member participated in this evaluatinn.
The Plant Design Change Request (PDCR) is the basic means to implement a design change to the plant.
The licensee recognized that another plant change process, the maintenance work order, could potentially inadvertantly effect a design change to plant hardware and not be subject to safety review.
The Impell Corporation, under contract to NUSCO, reviewed over 21,000 Haddam Neck Work Permits (WP) and Automated Work Orders (AWO) covering the time period from January 1, 1979 to December 31, 1984.
The contractor review was performed in accordance with documented procedures approved by PDCTG and audited by PDCTG.
Sixty five (65) of the WPs/AW0s received addi-tional detailed review. Of these, nine (9) require additional engineering evaluation., Another subset of 24 will be reviewed when the affected hardware is accessible during the next outage.
Impell made 11 recommendations /
'
observations which are under review by PDCTG.
There were no negative findings with safety significance.
.
L-
- - - - - - - -
w-
---,
-.
r
,.-----,,,,-,-r--
,-------.-n--,.
- -
- - - - - -,
- - - - - - - -- - - - - - - -
O
.
The NRC staff performed a confirmatory review of three categories of the WP/AW0s and had no questions.
The PDCTG Draft Report contains 18 recommendations in five categories.
Basically, the Task Group concluded that sufficient controls are in place and that the present system meets or exceeds the INP0 Good Practice TS-402 (INPO 85-013) May 1985, " Plant Modification Control Program." The recommen-dations, if adopted by the ERG, will improve interfaces, procedures, defini-tions and clarify the procedural relationships which will enhance adherence to procedures and communications.
The progress of PDCTG is within the schedule established by the NRC order.
The PDCTG Draft Report will be reviewed by ERG and discussed at a joint PDCTG/ ERG meeting during the week of August 5, 1985.
6.0 Haddam Neck Plant The NRC staff reviewed the Haddam Neck Plant procedures and PORC documents to confirm that commitments to implement interim action were accomplished.
Section 4.1 discusses procedure changes at the plant.
The plant has implemented additional changes related to PDCRs that will focus attention on design changes and improve the quality of design changes.
These are the separation of PDCR review by PORC from other PORC responsi-bilities and the imposition of restraints related to design changes.
The plant now holds two distinctly different types of PORC meetings, one for normal PORC topics and a separate PORC meeting dedicated to the consid-eration of PDCRs.
The PORC meeting for PDCRs requires the same committee membership plus attendance by appropriate technical expertise.
In addition, the PDCR PORC meeting is dedicated to the PDCR, i.e., no " walk-in" topics are allowed. This concept focuses management attention on the PDCRs. Addi-tionally, to eliminate " rush" reviews of PDCRs, the approval of all outage PDCRs will be onsite and ready for PORC review 2 months prior to the outage and ready for installation one month prior to the outage (Memos US-85.291, US-85-267 and NO-85-CY-539).
NE&O management has placed constraints on the station staff in relation to design changes. Only minor items involving design change can be performed by the station staff. All other designs must be accomplished by the corpor-ate design / engineering groups. The NE0 procedure 3.12 (see Section 4.1 of the report) requires that the Station Superintendent (or designee) discusses all plant design changes with the Manager, Safety Analysis (or designee)
.to determine if an integrated safety evaluation is required.
The NRC staff toured the turbine building, control room, auxiliary feedpump area, and the emergency diesel generators room.
Control room operators were knowledgeable of the current jumper / lifted lead status and could recall-and describe the prior jumper installations reviewed by the inspector.
The inspector had no further questions.
__
k
.
.
7.0 Exit Meetings The NRC Staff met witn the licensee representatives identified in paragraph 1 separately at Berlin, Connecticut and the Haddam Neck Plant on August 2, 1985 to discuss the inspection findings as detailed in this report. The licensee representatives acknowledged the NRC Staff's statements. At no time during this inspection, was written material provided to the licensee by the NRC staff.
L