IR 05000336/1985025
| ML20134E242 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Haddam Neck, 05000000 |
| Issue date: | 08/14/1985 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Schmidt R CONNECTICUT YANKEE ATOMIC POWER CO. |
| References | |
| NUDOCS 8508200101 | |
| Download: ML20134E242 (2) | |
Text
I i, #
,
.
AUG i t @
Docket No. 50-213 Connecticut Yankee Atomic Power Company
'
ATTN:
Mr. R. Schmidt Chairman, Plant Design Change Task Group P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:
Subject:
Millstone 2 Inspection 50-336/85-25 The purpose of this letter is to forward the Region I report of the above inspec-tion for appropriate consideration. We consider the design change problem identi-fled in Report Detail 2.f to have potential applicability to the work of the Plant Design Change Task Group.
Your consideration of this matter is appreciated.
Sincerely, Orir,inal Signed Byt Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects Enclosure:
Combined Report 50-245/85-19; 50-336/85-25 cc w/o encl:
J. F. Opeka, Senior Vice President - Nuclear Engineering and Operations Group R. Graves, Plant Superintendent D. O. Nordquist, Manager of Quality Assurance R. T. Laudenat, Manager, Generation facilities Licensing E. J. Mroczka, Vice President, Nuclear Operations Gerald Garfield, Esquire Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of Connecticut 8508200101 850814 PDR ADOCK 05000213
PDR 40Iqo a
,.
e,.
-
,
-
Connecticut Yankee Atomic Power Company 2 ggg
bec w/o encl:
Region I Docket Room (with concurrences)
Section Chief, DRP RI:DRP RI Mc
/meo Wei i ger 8/8/85 0FFICIAL RECORD COPY s
d