IR 05000336/1985025

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-336/85-25 for Consideration.Design Change Problem Identified in Rept Detail 2.f Considered to Have Potential Applicability to Work of Plant Design Change Task Group.W/O Encl
ML20134E242
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 08/14/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Schmidt R
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 8508200101
Download: ML20134E242 (2)


Text

I i, #

,

.

AUG i t @

Docket No. 50-213 Connecticut Yankee Atomic Power Company

'

ATTN:

Mr. R. Schmidt Chairman, Plant Design Change Task Group P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:

Subject:

Millstone 2 Inspection 50-336/85-25 The purpose of this letter is to forward the Region I report of the above inspec-tion for appropriate consideration. We consider the design change problem identi-fled in Report Detail 2.f to have potential applicability to the work of the Plant Design Change Task Group.

Your consideration of this matter is appreciated.

Sincerely, Orir,inal Signed Byt Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects Enclosure:

Combined Report 50-245/85-19; 50-336/85-25 cc w/o encl:

J. F. Opeka, Senior Vice President - Nuclear Engineering and Operations Group R. Graves, Plant Superintendent D. O. Nordquist, Manager of Quality Assurance R. T. Laudenat, Manager, Generation facilities Licensing E. J. Mroczka, Vice President, Nuclear Operations Gerald Garfield, Esquire Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Connecticut 8508200101 850814 PDR ADOCK 05000213

PDR 40Iqo a

,.

e,.

-

,

-

Connecticut Yankee Atomic Power Company 2 ggg

bec w/o encl:

Region I Docket Room (with concurrences)

Section Chief, DRP RI:DRP RI Mc

/meo Wei i ger 8/8/85 0FFICIAL RECORD COPY s

d