Monthly Operating Repts for Hatch Units 1 & 2 for Oct 1990
ML20197H932
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/31/1990
From: Beard R, Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-1360, NUDOCS 9011200254
Download: ML20197H932 (13)


Text

{{#Wiki_filter:Georgia Power Company 333 Pedmoat Avenue

          ' Atlanta Geo'D a 3030B
             ' Wa>no 404 526 3195 Ma'i.ng Address 40 Irmteness Center Parkway Post Offce Box 1295 Birmingham. Alabama 35201 Teicphone 205 668 %81 tre soutten ewinc system W. O. Hairston, it!

Senior vte President Nuclear Operadons HL-1360 000033 November- 12, 1990 U.S. A clear Regulatory Commission ATTW: Document Control Desk Washington, D.C. 20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 MONTHLY OPERATING REPORTS L Gentlemen: Enclosed are the October 1990 Monthly Operating Reports for Plant I Hatch Unit 1, Docket No. 50-321, and Plant Hatch Unit 2, Docket 1 No. 50-366.- These reports are submitted in accordance with the requirements of Technical Specifications Section 6.9.1.10. Sincerely,

                                                                        -  _ .9.
                                                                  ,W. G. Hairston, III-SRP/eb

Enclosures:

1. Monthly Operating Report for Hatch Unit 1
2. Monthly Operating Report for Hatch Unit 2 p

(Se's next page.) c: I' i 9011200254 901031 PDR ADOCK OSOOO:Q p PDL1

                ..or
        .     .o   _e

g

Georgia Power L.

I U.S. Nuclear Regulatory Commission November 12, 1990 Page Two c: Georaia Power Company

                       .Mr. H. L. Sumner, General Manager - Nuclear Plant Mr. J. D. Heidt, Manager Engineering and Licensing - Hatch NORMS U.S. Nuclear Reaulatory Commission. Washinaton. D.C.

Mr. K. Jabbour, Licensing Project Manager - Hatch U.S. Nuclear Reaulatory Commission. Reaion 11 Mr. S. D.-Ebneter, Regional Administrator Mr. L. D. Wert, Senior Resident Inspector - Hatch 1 000033

Georgia Power d ENCLOSURE 1 PLANT HATCH UNIT 1 NRC DOCKET 50-321 MONTHLY OPERATING REPORT October 1990 TABLE OF CONTENTS EiLqa Narrative Report El-1 Operating Data Report El-2 Average Daily Power Level El-3 Unit Shutdowns and Power Reductions El-4a

 \

000033

PLANT E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: NOVEMBER 5, 1990 NARRATIVE REPORT COMPLETEU BY: R. M. BEARD TELEPHONE: (912) 367-7781 x2878 OCTOBER 1 0000 Maintaining rated thermal power. OCTOBER 5 1840 Shift began reducing reactor power for a Maintenance Outage to repair the pump seal on the "B" Reactor Recirculation Pump. An automatic reactor scram occurred wher. the turbine [ OCTOBER 6 0337 tripped on high vibration. OCTOBER 9 2125 Shift began rod withdrawal for reactor startup. t OCTOBER 10 0232 The reactor was critical. OCTOBER 11 0757 The generator was tied to the grid; ascension to rated thermal power was underway. OCTOBER 12 0410 The unit was at rated thermal power. OCTOBER 15 1420 Shift began reducing power due to an increase in generator output, which could be indicative of a loss of feedwater heating. OCTOBER 15 1507 A manual reactor scram was inserted and the turbine manually

tripped due to high vibration.

OCTOBER 16 2347 Shift began rod withdrawal for reactor startup. OCTOBER 17 0344 The reactor was critical. OCTOBER 17 1934 The generator was tied to the grid; ascension to rated thermal power was underway. OCTOBER 18 1551 The unit was at rated thermal power. OC10BER 19 2120 Shift bcpan reducing load to approximately 440 GMWe for maintenanr.n on the A" Circulating Water Pump. OCTOBER 20 0950 Shift was returning the unit to rated thermal power. OCTOBER-31 2400 Maintaining rated thermal power. El-1 H

I OPERATING DATA REPORT DOCKET NO.: 50-32: DATE: NOVEMBER 5, 1990 COMPLETED BY: R. M. BEARD OPERATING STATUS

1. UNIT NAME: E. 1. HATCH - UNIT ONE
2. REPORT PERIOD: OCTOBER 1990 MWt : 2436 3.-LICENSED
4. THERMAL NAMEPLATE RATING (GROSS POWER (MWe : 850
5. DESIGN ELECTRICAL RATING N T MWe : 776.3
6. MAXIMVM DEPENDABLE CAPACI Y GROS MWe): 786
7. MAXIMUM DEPENDABLE CAPACITY NET MWe 753
8. IF CHANGES OCCUR IN CAPACITY RATINGS): NO CHANGES (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YEAR-TO-DATE CVMULATIVE
11. HOURS IN REPORTING PERIOD: 745 7296 130031
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 613.5 4475.6 94083.5
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE: 568.2 4260.0 89596.1
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL-ENERGY GENERATED (MWHt): 1327789 9958789 197357824 17.. GROSS ELECTRICAL ENERGY GENERATED (MWHe): 416480 3154930 63638960
18. NET ELECTRICAL ENERGY GENERATED (MWHe): 395327 2990685 60497043
19. UNIT SERVICE FACTOR: 76.3% 58.4% 68.9%
20. UNIT AVAILABILITY FACTOR: 76.3% 58.4% 68.9%
   '21. UNIT CAPACITY FACTOR USING MDC NET):                70.5%               54.4%              62.0%-
22. UNIT CAPACITY FACTOR USING DER NET): 68.4% 52.8% 59.5%
23. UNIT FORCED OUTAGE RA E: -

14.6% 7.6% 13.6%

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6. MONTHS (TYPE, DATE, AND DURATION OF EACH): NA
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A El-2
                                                                                     .                                                                                 A I4           ,

4 S' PLANT E'. 1. HATCH - UNIT ONE DOCKET NO.: 50-321 i DATE: NOVEMBER-5, 1990 1 J AVERAGE DAILY POWER LEVEL' COMPLETED BY: TELEPHONE: R. M. BEARD o (912) 367-7781 x2878 OCTOBER 1990 DAY Net MWe . o 1 ..............- 738 2 .............. 738 3-............... 739 4 .............. 738 - 5 ............... 679:

       ~             <

6 .............. 16 i

       ,.                                                                    7 ..............                          0                                             .!

8..............- 0 4

                                                                           . 9 ..............                          0                                                   :
                                                                           ~10...............-                         0                                                   )

11 .............. 178

                 .                                                          12<..............                       700-
                                                                                                                                                                         )
  ~" +                                                                                                              737.

13 ..............- 14 .............. 741 15 .............. 455 i s <.16 .............. 0 -J 171.............. '9 18............... $72 e

                                                                           '19'..............-                      729'                                               .!

20.......-......... 594

21>.............. 734' 4

22 ............... 732 23 .............. 734  ! 241.............. 740~ .

                       ~"
                                                                           '25.............~-            .         '741                                                3 26 ..'.............   .

747-27 .............. 747-  !

                                                                           '28 ...s........            . .          747-                                                 l 29'.......'..     .     ....            743.                                             -r 30..............-                       745.                                                 -
           ; ",                                                            _31...............                      -743 i

1 .- l' s s- 5 l 7 N I. L El-3 L 4

                                            ,                                                                                                                          ,f
                                       .r ic                                                                                                                            i e

v 1 r --- . --. .m,., ,. r _ 4 . .- - .~o -- .- ,-r., _..a .,

p . UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0.: 50-321 DATE: NOVEMBER 5, 1990 VNIT NAME: E. 1. HATCH - UNIT ONE COMPLETED BY: R. M. BEARD TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: OCTOBER 1990 R H S E E Y T A T LICENSEE SC Y S H EVENT T0 COMP 0NENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION 10 NO. DATE E (HOURS) N D NUMBER ME (SUBC0DE) PREVENT RECVRRENCE 90-008 901006 F 44.38 A 3 1-90-020 HA TURBIN A load reduction was in progress for a Maintenance Outage when the turbine tripped on high vibration, resulting in an automatic reactor scram, it was determined the Reheat Steam Source Valves did not fully close. The torque switch setting was within the manufacturers recommended range but in the lower end. The torque switch setting was raised and the valve functionally tested to ensure proper operation. 90-009 901008 S 79.95 F 4 N/A CB PUMPXX The outage has been-(B) reclassified from a Forced Outage to a scheduled Maintenance Outage. TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20% F-FORCED A-EQUIPMENT FAILVRE (EXPLAIN) 1-MANUAL . REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANVAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE FRECEDING 24 HOURS. D-REGULATORY RESTRICTION 4-CONTINVAT10NS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN) G-0PERATIONAL ERROR (EXPLAIN) H-0THER (EXPLAIN) El-4a

I UNIT SHUTDOWNS AND POWER REDVCTIONS DOCKET N0.: 50-321 DATE: NOVEMBER 5, 1990 UNIT NAME: E. 1. HATCH - UNIT ONE COMPLETED BY: R. M. BEARD TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: OCTOBER 1990 R M S E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT- ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SVBCODE) PREVENT RECURRENCE 90-010 901015 'F 52.45 G 2 1-90-021 HA TVRBIN The reactor was manually scrammed and the turbine manually tripped when the turbine vibration increased to approximately 12 mils. The exact cause of the vibration increase has not been determined; however, a potential cause could have been closure of the Reheat Steam Source Valves for the Moisture Separator Reheaters. Testing and inspection revealed no actual failure which would have caused the valves to close. Addtionally, personnel were interviewed to determine if the switch had been repositioned. The results were negative. 90-011 901019 S 0 B 5 N/A HF PUMPXX Load was reduced to allow (B) repair of the oil slinger ring on the "A" Circulating-Water Pump. TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20% F-FORCED A-EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS. D-REGULATORY RESTRICTION 4-CONTINVATIONS-E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN) G-0PERATIONAL ERROR (EXPLAIN) H-0THER (EXPLAIN) El-4b

   ~

Gecngla P6wer 1 l-. ENCLOSURE 2 PLANT HATCH UNIT 2 NRC DOCKET 50-366 MONTHLY OPERATING REPORT = October 1990 __ TABLE OF CONTENTS is M _ Narrative Report E2-1 Operating Data Report E2-2 2 Average Daily Power Level E2-3 Unit Shutdowns and Power Reductions E2-4

   .j, 1

mm b 000033

i 1 i jd:J'Oi . n , 1 3-PLANT.E.1 1. HATCH - UNIT TWO DOCKET NO: 50-366  ; DATE: NOVEMBER 5, 1990  ; NARRATIVE REPORT COMPLETED BY: R. M. BEARD .  ! TELEPHONE: (912) 367-7781 x2878

                                    - 0CTOBER.I.                       0000     . Maintaining rated thermal power.
                                    - OCTOBER 6                        0015'     Shift began reducing load to approximately 600 GMWe for Turbine Control Valve and Turbine Bypass valve Testing.                  g 0CTOBER 7                        0226-     Shift was . returning the unit to rated thermal power.                 1
                                                                                                                                                        ^l
        "~
                            'LOCTOBER 31.                            :

2400 Maintaining rated thermal power. ) on i

                                                                                                                                                       .i 1

i

     '                 E w                  ,

l

  ,i.                                                                                                                                                        ,

ft - $' 1 ' 9 6 Y9 I Ji* -{ b a 3.. [ 4EF

                         ' 'i'.

3 l Ili i T .,( .- -ttI ts E2-1 i e

    'r                                                                                                                                                     i.
   *                                                                                                                                                    ~

wrw+ r - , m -

OPERATING DATA REPORT DOCKET N0: 50-366 DATE: NOVEMBER 5, 1990 COMPLETED BY: R. M. BEARD OPERATING STATUS:

1. UNIT NAME: E. 1. HATCH - UNIT TWO
2. REPORTING PERIOD: OCTOBER 1990 3.' LICENSED THERMAL POWER (MWt : 2436
4. NAMEPLATE RATING (GROSS MWe : 850
5. DESIGN ELECTRICAL RATING N T MWe : 784
6. MAXIMUM DEPENDABLE CAPACI Y GROS MWe): 799
7. MAXIMUM DEPENDABLE CAPACITY NET MWe 766
8. IF CHANGES OCCUR IN CAPACITY RATINGS): NO CHANGES (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
 ~9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):           NO RESTRICTIONS
10. REASONS FOR RESTRICTION, IF_ANY: N/A THIS MONTH YEAR-TO-DATE CVMULATIVE ll.' HOURS IN REPORTING PERIOD: 745 7296 97657 12.-NUMBER OF HOURS REACTOR WAS CRITICAL: 745.0 7220.7 72618.7
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0-
14. HOURS GENERATOR ON LINE: 745.0 7185.8 69698.0
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
1811577 17236729 152736697.
16. GROSS THERMAL ENERGY GENERATED (MWHt)He):
17. GROSS ELECTRICAL ENERGY GENERATED (MW 592180 566403 5650080 5406327 50108170 47702690
18. NET ELECTRICAL ENERGY GENERATED (MWHe):
19. UNIT SERVICE FACTOR: 100.0% 98.5% 71.4%

20.' VNIT AVAILABILITY FACTOR:- 100.0% 98.5% 71.4%

  '21. UNIT CAPACITY FACTOR USING MDC NET :                  99.3%               96.7%               63.9%-
22. UNIT. CAPACITY FACTOR USING DER NET : 97.0% 94.5% 62.3%
23. UNIT FORCED OUTAGE RA E: 0.0% 1.5% 7.8%

24.' SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH): Refuelin Outage: March 20, 1990 tentative ; 68 Days

25. IF SHUTDOWN A END OF REPORT PERIOD ES IMATED DA E OF STARTUP: N/A 26.UNITSINTESTSTATUS(PRIORTOCOMMERCIALOPERATION): N/A E2-2

r 1 4 t

       .       , : . 7,;     .

4 3 2

                                     ' PLANT E. I. HATCH - UNIT TWO                          DOCKET N0:  50-366                         "

l DATE: NOVEMBER 5, 1990 AVERAGE DAILY POWER LEVEL COMPLETED BY: R. M. BEARD l TELEPHONE: (912)-367-7781 x2878 ;i 1 DAY- Net MWe 1 ........... .. 761 2 .............. 761 3 .............. 758 4 .............. 756 5 .............. 762 j 6 .............. 761 j 7=.............. 738-  ! 8-.............. 759 l B 9 .............. 757 j p,, 10 .............. 759 11 .............. 753 i 1 2 . . . . . . . . . . . . .. . 754 '1 1.- 757

 ?,                                                         13  ..............                                                              l 14  ...............                    761'                               D R

15 .............. 763: 762-i , 16 ..............  ; i , 17 .............. -758 lf,..

 ' ~

18 ..'............ 756 19 .............. 767 + 20 .............. 764,- 4 21 .............. 759 v 22"..............' 756-

                                                           -23 ..............                      757 24'..............                      765 3                     4                                  '25 ..............                       766:                                   ;

767- 4

                                                          '26 ..............

27 .............. ~771 28..............' 761 O '^ 29............... 758  :

                                                                                                  -770                                 l L                                                           30 ...............

31'.............. 770 . l

 *                                                                                                                                    .I n

l[  ? l Iq {c-mi, , I el , ~ 1 t: E2-3 . g 1 J -1 l-l'

         .,                        ,       ,,    . L .. -                                                                     . . - . . . ,

l ;. . ., ..

                  ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0: 50-366 DATE: NOVEMBER 5, 1990 UNIT NAME: E. 1, HATCH - UNIT TWO COMPLETED BY: R. M. BEARD TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: OCTOBER 1990 R M S E E Y T A T LICENSEE SC Y S H EVENT T0 COMPDM'cNT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED ioDE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUCC0DE) PREVENT RECURRENCE No significant power reductions this month.

      ' TYPE:             REASON:                            METHOD:                                 EVENTS REPORTED INVOLVE A GREATER THAN 20%

LF-FORCED 1-MANUAL REDUCTION IN AVERAGE S-SCHEDULED 'A-EQUIPMENT B-MAINTENANCE OR TESTFAILURE (EXPLAIN) 2-MANUAL DAILYSCRAM POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS. D-REGULATORY RESTRICTION 4-CONTINVAT10NS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN) G-0PERATIONAL ERROR (EXPLAIN) H-0THER (EXPLAIN) E2-4}}