BECO-89-064, Forwards Dcrdr Supplementary Summary Rept, Including Addl Info Requested by NRC

From kanterella
Jump to navigation Jump to search
Forwards Dcrdr Supplementary Summary Rept, Including Addl Info Requested by NRC
ML20246K123
Person / Time
Site: Pilgrim
Issue date: 05/02/1989
From: Bird R
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20246K128 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.D.1, TASK-TM BECO-89-064, BECO-89-64, GL-82-33, NUDOCS 8905170244
Download: ML20246K123 (3)


Text

,_ - __-____ _ ___ _-_ _ _ _ _ _ _ _ _ _ _ _ . _ - - - _ _ - ._

.- .4 )

  1. , Generic Letter 82-33 1 h, f 80570NEDfSON Pilgrim Nuclear Power station Rocky Hill Road Plymouth, Massachusetts 02360

~

l Ralph G. Bird

. senior Vice President - Nuclear May 2, 1989 BECo 89-064 U.S. Nuclear Regulatory Commission Document Control Desk

.Hashington. DC 20555 License DPR-35 Docket 50-293 NUREG-0737. ITEM I.D.1: DETAILED CONTROL ROOM DESIGN REVIEH SUPPLEMENTARY REPORT The attached report, " Detailed Control Room Design Review Supplementary Summary Report" addresses the NUREG-0737, Supplement 1 (Generic Letter 82-33) requirement for submittal of a summary report for Detailed Control Room Design Review (DCRDR). This report supplements and updates the Summary Report we submitted September 24, 1984.

The attached supplement provides additional information requested by the NRC in a letter of May 16, 1985. It also describes the progress our DCRDR has made since 1984, identifies additional work needed to complete the DCRDR, and

)

, provides a schedule for the next phase of work.

The enclosed report fulfills item #2.A in Schedule B of the Long Term Program, as submitted by BECo letter dated March 27, 1989. Commitments made in the enclosed report will result in the addition of several items to Schedule B.

These additions will be made in the next submittal of the LTP.

R. G. Bird PMK/jcp/3200

Attachment:

Detailed Control Room Design Review Supplementary Summary Report l

l' ,

8905170244 890502 PDR ADOCK 05000293 P PDC l

L _ _ _ _ _ _ . ________ _

4

'Page 2' cc:- Mr. D.. Mcdonald, Project Manager-Division of Reactor Projects -~I/II

'y' Office of Nuclear Reactor Regulation Mail.Stop: 14Dl.

L U..S. Nuclear Regulatory Commission 1 1 White Flint North 11555 Rockville Pike Rockville, MD 02852-U.'S. Nuclear Regulatory Commission  !

Region I- .

475 Allendale Road King of Prussia, PA 19406

- Senior NRC Resident Inspector Pilgrim Nuclear Power Station p

i

.. i NUREG-0737. Item I.D 1 Generic Letter 82-33 g 1 aosnwawsou Pilgrim Nuclear Power station j Rocky Hill Road j Plymouth, Massachusetts 02360 j l

Ralph G. Sird senior Vice President - Nuclear j May 2, 1989 j BECo 89-064 i U.S. Nuclear Regulatory Commission  ;

Document Control Desk Washington, DC 20555 License DPR-35 Docket 50-293 NUREG-0737, ITEM I.D.1: DETAILED C0r4 TROL R00H DESIGN REVIEW SUPPLEMENTARY REPORT The attached report, " Detailed Control Room Design-Review Supplementary Summary Report" addresses the NUREG-0737, Supplement 1 (Generic Letter 82-33) I requirement for submittal of.a summary report for Detailed Control Room Design Review (DCRDR). This report supplements and updates the Summary Report we submitted September 24, 1984.

The attached supplement provides additional information requested by the NRC in a letter cf May 16, 1985. It also describes.the progress our DCRDR has made since 1984, identifies additional work needed to complete the DCRDR, and provides a' schedule for the next phase of work.

The enclosed report fulfills item #2.A in Schedule B of the Long Term Program,

.as submitted by BECo letter dated March 27, 1989. Commitments made in the enclosed report will result in the addition of several items to Schedule B.

These additions will be made in the next submittal of the LTP.

3Grf R. G. Bird PHK/jcp/3200

Attachment:

Detailed Control Room Design Review Supplementary Summary Report i