BECO-88-104, Forwards Summary of Util QA Program Description Changes for 1987-1988.Concludes That Revised Program Continues to Satisfy Criteria of App B

From kanterella
Jump to navigation Jump to search
Forwards Summary of Util QA Program Description Changes for 1987-1988.Concludes That Revised Program Continues to Satisfy Criteria of App B
ML20150E317
Person / Time
Site: Pilgrim
Issue date: 07/07/1988
From: Bird R
BOSTON EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
BECO-88-104, NUDOCS 8807150075
Download: ML20150E317 (15)


Text

_

10CFR50.54(a) g mos a m son Execute Ofhces 800 Boyiston Street Boston, Massachusetts 02199 Ralph G. Bird BECo 88- 104 senior Vice President - Nuclear U. S. Nuclear Regulatory Commission July 7, 1988 Document Control Oesk Hashington, DC 20555 License DPR-35 Docket 50-293 ANNUAL REPORT OF CHANGES TO THE BOSTON EDISON OUALITY ASSURANCE PROGRAM DESCRIPTION

References:

(a) Letter from R. G. Bird, Sr. Vice President-Nuclear (BECo), to the NRC Regional Administrator (Region I), dated July 8, 1987,

Subject:

Annual Report of Changes to the Boston Edison QA Program Description (b) Letter from H. V. Johnston, Acting Director of the Division of Reactor Safety (NRC Region I), to R. G. Bird, Sr. Vice President-Nuclear (BECo), dated August 1987,

Subject:

Annual Review of Boston Edison Quality Assurance Manual-(BEQAM)

Volume II As required by 10CFR.54(a), Boston Edison submits the annual summary of Quality Assurance Program Description changes made since the last submittal, Reference (a). The NRC approved the latter via Reference (b).

He evaluated each change, summarized in Enclosure (A), to determine if any requirements contained in the previously NRC-approved QA Program Description were deleted or made less stringent; we concluded there is no reduction of commitments. 10CFR50, Appendix B, Criterion II requirements were used to conclude the revised program continues to satisfy the criteria of Appendix 9.

RPH/jcp/2182

Enclosure:

(A) Summary of QA Program Description Changes (1987-1988) cc: See next page 0k 8807150075 880707 I PDR ADOCK 05000203 P PDC

BOSTON EDISON COMPANY July 7, 1988 U. S. Nuclear Regulatory Cosmission Page 2 cc: Mr. D. Mcdonald, Project Manager Office of Nuclear Reactor Rejulation U. S. Nuclear Regulatory Commission Mail Station P1-137 Washington, DC 20555 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road .

King of Prussia, PA 19406 .

Senior NRC Resident Inspector Pilgrim Nuclear Power Station 4

i

. n ENCLOSURE (A)

TO BECO LETTER NO.88-104

SUMMARY

OF THE BOSTON EDISON-QA PROGRAM DESCRIPTION CHANGES (1987-1988)

QA PROGRAM CHANGE #II-168 EVALUATION #87-04 This change modifies Section 3 of BEQAM II as follows:

To refiert an organizational change. Licensing is noy in the Nuclear Engineering Department instead of the Nuclear Operations Support Department.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-169 EVALUATION #87-05 This change. modifies Section 7 of BEQAH II as follows:

To return the BEQAH to the requirements for' accepting supplier Quality Assurance Programs that existed before IE Information Notice 86-21, in accordance with IE Information Motice 86-21, Supplement 1.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Progra.a description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-170 EVALUATION #87-06 Void; no change was made to the BEQAM.

0A PROGRAM CHANGE #II-171 EVALUATION #87-07 This change modifies Section 18 of BEQAM II as follows:

Page 1 of 13

l To clarify that recommendations made, accepted and implemented during an l audit do not need to be dispositioned in writing.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix 8,_and the Safety Analysis Report Quality 1 l

Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-172 EVALUATION #87-08 This change modifies the Foreword of BEQAM II as follows; To reflect the addition of a Senior Vice President in the Nuclear Organization.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-173 EVALUATION #87-09 This change modifies Section 1 of BEQAM II as follows: .

To reflect organization changes caused by the addition of a Senior Vice President--Nuclear. The Quality Assurance Department Manager has been given a direct line of communication to the Senior Vice President--

Nuclear.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-174 EVALUATION #87-10 This change modifies Section 2 of BEQAM II as follows:

To incorporate organizational changes:

1. Title Change: Senior Vice President--Nuclear has replaced the Executive Vice President.

Page 2 of 13

2. Training Department reorganization.
3. Differentiation between Nuclear Operations Department and the Nuclear Organization.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-175 EVALUATION #87-11 This change modifies Section 18 of BEQAM II as follows:

  • To replace the Executive Vice President by the Senior Vice President--Nuclear.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Anal);is Report Quality Assurance Program description commitments previoudy accepted by the NRC.

QA PROGRAM CHANGE #II-176 EVALUATION #87-12 This change modifies Section 5 of BEQAM II as follows:

To transfer ownership of Nuclear Organization Procedures fr~om the VP--

Nuclear Operations to the Senior Vice President--Nuclear.

The revised orogram incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

0A PROGRAM CHANGE #II-177 EVALUATION #87-13 This change modifies Section 5 of BEQAM II as follows:

-To clarify that alternate prccesses are, in fact, changes when they deviate from procedural requirements. These alternate methods, such as using memos rather the procedures, require revision to the procedures before implementation.

s Page 3 of 13

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-178 EVALUATION #87-14 This change modifies Section 2 of BEQAM II as' follows:

To clarify the applicability of the 8EQAM to the processing, packaging and shipping of radioactive material. Also, to add a reference which details the processing, packaging and shipping of radioactive material.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix 8, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-179 EVALUATION #87-15 This change modifies Section 4 of BEQAM II as follows:

To add a reference which details the processing, packaging and shipping of radioactive material.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix 8, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM ~ CHANGE #II-180 EVALUATION 187-16 This change modifies Section 16 of BEQAH II as follows:

To differentiate between "reportable" and "potentially reportable."

The revised program incorporating this change continues to s.tisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program descriltion commitments previously accepted by the NRC.

Page 4 of 13

9 QA PROGRAM CHANGE #II-181 EVALUATION #87-17 Void; no change was made-to the BEQAM.

QA PROGRAM CHANGE #II-182 EVALUATION #87-18 This change modifies Section 2 of BEQAM II as follows:

To more accurately define the responsibilities for training programs to meet quality-related requirements.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-183 EVALUATION #87-19 This change modifies Section 1 of BEQAH II as fol?ows:

To more accurately define the responsibilities of the Nuclear Training Section and more specifically define the responsibility for indoctrination of personnel.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-184 EVALUATION #87-20 This change modifies Section 1 of BEQAM II as follows:

To more specifically define the responsibility for indoctrination of personnel in quality-related programs and procedures.

The revised program incorporating this change continues to satisfy the criteri6 of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

Page 5 of 13

QA PROGRAM CHANGE #II-185 EVALUATION #87-21 This change modifies Section 17 of BEQAM II as follows:

To ensure no unapproved changes are made to QA records and that revisions

~

do not obliterate previous information, to permit traceability.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #11-186 EVALUATION #88-01 This change modifies Section 2 of BEQAM II as follows:

To reflect the Nuclear Organization's reorganization (Nuorg 88).

Nu0rg 88 was a major reorganization. Many departments / sections / divisions have changed their names. All responsibilities have been transferred accordingly.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-187 EVALUATION #88-02 This change modifies Section 6 of BEQAM II as follows:

To reflect the Nucle:. Organization's reorganization (Nu0rg 88).

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

1 QA PROGRAM CHANGE #II-188

, EVALUATION #88-03 This change modifies Section 7 of BEQAH II as follows:

l i

To reflect the Nuclear Organization's reorganization (Nu0rg 88).

Page 6 of 13 u

l The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-189 EVALUATION #88-04 This change modifies Section 11 of BEQAH II as follows:

To reflect the Nuclear Organization's reorganization (NuOrg 88).

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #I1-190 EVALUATION #88-05 This change modifies Section 12 of BEQAM II as follows:

lo reflect the Nuclear Organization's reorganization (Nu0rg 88).

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-191 EVALUATION #88-06 This change modifies Section 14 of BEQAH II as follows:

To reflect the Nuclear Organization's reorganization (Nuorg 88).

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Apoendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-192 EVALUATION #88-07 This change modifies Section 15 of BEQAM II as follows:

Page 7 of 13

F .

To reflect the Nuclear Organization's reorganization (Nu0rg 88).

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-193 EVALUATION #88-08' This change modifies Section 16 of BEQAM II as follows:

To reflect the Nuclear Organization's reorganization (Nuorg 88).

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-194

-EVALUATION #88-09 This change modifies Section 17 of BEQAM II as follows:

To reflect the Nuclear Organization's reorganization (Nu0rg 88).

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

, QA PROGRAM CHANGE #II-195 EVALUATION #88-10 This change modifies Section 18 of BEQAM II as follows:

To reflect the Nuclear Organization's reorganization (Nu0rg 88).

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

Page 8 of 13

QA PROGRAM CHANGE #II-196 EVALUATION #88-11 This change modifies Section 1 of BEQAM II as follows:

To reflect the Nuclear Organization's reorganization (Nuorg 88).

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-197 EVALUATION #88-12 This change modifies Section 2 of BEQAM II as follows:

To clarify what constitutes a quality-related service.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-198 EVALUATION #88-13 This change modifies Section 4 of BEQAM II as follows:

To reference Section 2 for a description of what constitutes quality-related items / services.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-199 EVALUATION #88-14 This change modifies Section 4 of BEQAM II as follows:

To clarify that the term "commercial quality item" applies only to equipment, not services. Also, to establish controls when services are procured from a supplier without a Quality Assurance Program.

Page 9 of 13

Tne revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-200 EVALUATION #88-15 This change modifies Section 7 of BEQAM II as follows:

To clarify the responsibilities for a supplier working under Boston Edison's Quality Assurance Program as well as Boston Edison's responsibilities / controls for the supplier.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-201 EVALUATION #88-16 This change modifies Section 1 of BEQAH II as follows:

To reassign responsibility of the in-service test program required by ASHE Section XI from the Quality Assurance Department Manager to the Plant Department Manager.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAH CHANGE #I'-202 EVALUATION #88-17 This change modifies Section 1 of BEQAH II as follows:

To incorporate changes made in the method of reporting to senior management on the adequacy of the Quality Assurance Program, as a result of increased senior management involvement. Other changes were made to transfer responsibilities in response to the reorganization (Nu0rg 88).

The revised program incorocrating this change continues to satisfy the criteria of 10CFR50, Appendix 8, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

Page 10 of 13

QA PROGR # CHANGE #I1-203 EVALUATION #88-18 This change modifies Section 16 of BEQAM II as follows: I To clarify the intent of Quality Assurance Department Manager's review /  ;

approval regarding significant Conditions Adverse to Quality. '

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

I QA PROGRAM CHANGu #II-204 EVALUATION #88-19 This change modifies Section 1 of BEQAM II as follows:

To reflect an organizational change--the Quality Assurance Department Manager now reports directly to the Senior Vice President--Nuclear.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-205 EVALUATION #88-20 This change modifies Section 2 of BEQAM II as follows:

To reflect an organizational change--the Quality Assurance Department Manager now reports directly to the Senior Vice President--Nuclear.

i

.The revised progra'n incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-206 EVALUATION #88-21 This change modifies Section 16 of BEQAM II as follows:

To reflect an organizational change--the Quality Assurance Department Manager now reports directly to the Senior Vice President--Nuclear.

Page 11 of 13

c. - _ - _ _ - _ _ - _ _ _ _ _ _ _

P The revised program incorporating this change continues to satisfy the ,

criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC. ,

QA PROGRAM CHANGE #II-207 EVALUATION #88-22 l Thl: change modifies Section 18 of BEQAH II as follows: l To reflect an organizational change--the Quality Assurance Department Manager now reports directly to the Senior Vice President--Nuclear.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previoJsly accepted by the NRC.

QA PROGRAM CHANGE #II-208 EVALUATION #88-23 This change modifies Section 2 of BEQAM II as follows:

To provide the correct terminology, in reference to a regulatory guide commitment, for editorial accuracy.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAH CHANGE #II-209 EVALUATION #88-24 This change modifies Section 2 of BEQAH II as follows:

To transfer the responsibility of determining quality-related items /

services as they apply to radioactive material, from the Nuclear Engineering Department Manager to the Radiological Section Hanager.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

Page 12 of 13

.,. ~.

~

QA PROGRAM CHANGE #II-210 EVALUATION #88-25 This change modifies Section 1 of BEQAM II as follows:

To reflect a department title change and to clarify terminology for responsibilities.

The revised program incorporating this change continues to. satisfy the I criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality i Assurance Program description commitments previously accepted by the NRC.

l OA PROGRAM CHANGE #II-211 EVALUATION #88-26 This change modifies Section 13 of BEQAM II as follows:

To reflect a departmental management title change.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

QA PROGRAM CHANGE #II-212 EVALUATION #88-27 This change modifies Section 1 of BEQAM II as follows:

To reflect a departmental management title change.

The revised program incorporating this change continues to satisfy the criteria of 10CFR50, Appendix B, and the Safety Analysis Report Quality Assurance Program description commitments previously accepted by the NRC.

l l

Page 13 of 13 e

_ _ _ _ . _ _ _ _ _ _ _ - - - -