Forwards Millstone Nuclear Power Station Unit 2 Inservice Insp & Testing Program, for Second 10-yr Insp Interval to Commence on 851226.Response Re Acceptability Requested by 851226
ML20128J140
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/27/1985
From: Opeka J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Butcher E
Office of Nuclear Reactor Regulation
Shared Package
ML20128J144 List:
References
B11598, NUDOCS 8507100423
Download: ML20128J140 (1)


Text

. _ _ _ _ _ _ _ _ _ - _ .

4 k N UTIIJTIES coner.i Onic.. . seio.n street. Boriin. conr ecticui l steES vr:Ss cowar P.O. BOX 270 woaama ma "

HARTFORD. CONNECTICUT 06141-0270 L L j ['7,"d' ',TZ","" "" (203) 665-5000 June 27,1985 Docket No. 50-336 Bil598 Director of Nuclear Reactor Regulation Attn: Mr. Edward 3. Butcher, Chief Operating Reactors Branch #3 U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

(1) R. A. Clark letter to W. G. Counsil, dated November 4,1982.

Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 Inservice Inspection and Testing Program On December 26, 1985, Millstone Unit No. 2 will commence the second ten-year inspection interval, based on a commercial operation date of December 26,1975.

In accordance with 10CFR 50.55a(g), Northeast Nuclear Energy Company (NNECO) hereby submits ten copies of the description of the inservice inspection and testing program, and " requests for relief" from Code requirements as necessary, for the second ten-year inspection interval.

The program described in the attachment to this letter is based upon the existing inservice inspection and testing program, approved by Reference (1), but upgraded to the requirements of the ASME Boiler and Pressure Vessel Code,Section XI,1980 Edition with addenda up to and including the Winter,1981 Addenda.

An updated set of plant boundary diagrams has been included to assist your Staff in their review of the updated inservice inspection and testing program.

The original plant commercial operation date and the requirements of 10CFR50.55a(g), define inspection intervals, such that the second ten-year interval will commence December 26, 1985. Our inspection planning and scheduling are proceeding with the expectation that the program updates described in the attachment are fully acceptable to the Staff. A response concerning Staff acceptability is requested as soon as possible, but no later than December 26,1985.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 8507100423 850627

[A 0%fD h , h,

3. F. Opdka) V Senior Vice President  !