Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement
Results
Other: A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170, B11549, Proposed Tech Spec Revs to Sections 5 & 3/4.9,expanding Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks in Two Region Arrangement, B11827, Forwards Addl Info Requested in Oct 1985 Re Util Request to Modify Tech Specs Concerning Spent Fuel Storage Capacity, ML20129A151, ML20133F264, ML20138R217, ML20141B826, ML20141F878, ML20141N037, ML20151M062, ML20154E988, ML20195G527
|
MONTHYEARB11271, Application for Amend to License DPR-65,revising Tech Specs Re Fire Protection Sys,Including Fire Detectors,Fire Water Pump Diesels,Spray/Sprinkler Sys,Hose Station & Penetration Fire Barriers.Fee Paid1985-05-28028 May 1985 Application for Amend to License DPR-65,revising Tech Specs Re Fire Protection Sys,Including Fire Detectors,Fire Water Pump Diesels,Spray/Sprinkler Sys,Hose Station & Penetration Fire Barriers.Fee Paid Project stage: Request A04668, Forwards Responses to Open Items Re Exceptions from Guidelines of Rev 2 to Reg Guide 1.97 (Contained in Suppl 1 to NUREG-0737) Discussed in 850416 Meeting.Responses Should Resolve NRC Concerns Re Open Items1985-05-28028 May 1985 Forwards Responses to Open Items Re Exceptions from Guidelines of Rev 2 to Reg Guide 1.97 (Contained in Suppl 1 to NUREG-0737) Discussed in 850416 Meeting.Responses Should Resolve NRC Concerns Re Open Items Project stage: Request ML20129A1511985-05-31031 May 1985 Proposed Tech Specs Re Fire Protection Sys,Including Fire Detectors,Fire Water Pump Diesels,Spray/Sprinkler Sys,Hose Station & Penetration Fire Barriers Project stage: Other B11598, Forwards Millstone Nuclear Power Station Unit 2 Inservice Insp & Testing Program, for Second 10-yr Insp Interval to Commence on 851226.Response Re Acceptability Requested by 8512261985-06-27027 June 1985 Forwards Millstone Nuclear Power Station Unit 2 Inservice Insp & Testing Program, for Second 10-yr Insp Interval to Commence on 851226.Response Re Acceptability Requested by 851226 Project stage: Request ML20126M2981985-07-24024 July 1985 Application for Amend to License DPR-65,revising Tech Specs to Expand Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks.Fee Paid Project stage: Request B11549, Proposed Tech Spec Revs to Sections 5 & 3/4.9,expanding Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks in Two Region Arrangement1985-07-24024 July 1985 Proposed Tech Spec Revs to Sections 5 & 3/4.9,expanding Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks in Two Region Arrangement Project stage: Other ML20134N6051985-08-26026 August 1985 Forwards Auxiliary Sys Branch Request for Addl Info Re Util 850724 Request to Modify Tech Spec Concerning Expansion of Spent Fuel Storage Capacity.Response Requested within 15 Days Project stage: RAI ML20135G1691985-09-0505 September 1985 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion,To Complete Review of 850724 Request to Modify Tech Specs.Info Requested within 15 Days of Ltr Receipt Project stage: RAI B11712, Forwards Response to 850826 Request for Addl Info Re Util 850724 Proposed Change to Tech Spec Mods for Spent Fuel Storage Pool Capacity1985-09-16016 September 1985 Forwards Response to 850826 Request for Addl Info Re Util 850724 Proposed Change to Tech Spec Mods for Spent Fuel Storage Pool Capacity Project stage: Request B11733, Rev to 850528 Application to Amend License DPR-65,adding Continuous or Hourly Fire Watch Patrol Until Temporary or Inoperable Fire Barrier Permanently Repaired.Determinations Re 10CFR50,App R Still Applicable1985-10-0101 October 1985 Rev to 850528 Application to Amend License DPR-65,adding Continuous or Hourly Fire Watch Patrol Until Temporary or Inoperable Fire Barrier Permanently Repaired.Determinations Re 10CFR50,App R Still Applicable Project stage: Request ML20133F2641985-10-0101 October 1985 Proposed Rev to Tech Spec 3/4.7.10,adding Continuous or Hourly Fire Watch Patrol Until Temporary or Inoperable Fire Barrier Permanently Repaired Project stage: Other B11672, Forwards Revised Response to SER (NUREG-1031) Question 480.37 Re Asymmetric Pressure Loadings on Structures & Components Due to Postulated Pipe Ruptures,Including Results of Evaluation of Asymmetric Loadings on Pressurizer1985-10-0101 October 1985 Forwards Revised Response to SER (NUREG-1031) Question 480.37 Re Asymmetric Pressure Loadings on Structures & Components Due to Postulated Pipe Ruptures,Including Results of Evaluation of Asymmetric Loadings on Pressurizer Project stage: Request ML20133E7071985-10-0303 October 1985 Forwards Structural & Geotechnical Engineering Branch Request for Addl Info to Complete Review of 850724 Application to Modify Tech Specs Re Spent Fuel Storage Capacity Expansion Project stage: RAI B11827, Forwards Addl Info Requested in Oct 1985 Re Util Request to Modify Tech Specs Concerning Spent Fuel Storage Capacity1985-10-28028 October 1985 Forwards Addl Info Requested in Oct 1985 Re Util Request to Modify Tech Specs Concerning Spent Fuel Storage Capacity Project stage: Other B11889, Forwards Confirmation of Resolution to Request for Addl Info Re Application for Increased Spent Fuel Storage Capacity Based on Series of Telcons1985-11-25025 November 1985 Forwards Confirmation of Resolution to Request for Addl Info Re Application for Increased Spent Fuel Storage Capacity Based on Series of Telcons Project stage: Request B11766, Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 8601311985-11-25025 November 1985 Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 860131 Project stage: Request B11910, Responds to Request for Addl Info Re Spent Fuel Storage Capacity.Analysis Showing That Adjacent Modules Do Not Contact During Seismic Event Inadvertently Omitted from1985-12-0303 December 1985 Responds to Request for Addl Info Re Spent Fuel Storage Capacity.Analysis Showing That Adjacent Modules Do Not Contact During Seismic Event Inadvertently Omitted from Project stage: Request B11916, Provides Supplemental Relief Request Info Re Inservice Insp & Testing Program.Main Feed Sys Check Valves 2-FW-5A & 2-FW-5B Cannot Be Tested Per ASME Boiler & Pressure Vessel Code.Periodic Valve Disassembly Suggested1985-12-16016 December 1985 Provides Supplemental Relief Request Info Re Inservice Insp & Testing Program.Main Feed Sys Check Valves 2-FW-5A & 2-FW-5B Cannot Be Tested Per ASME Boiler & Pressure Vessel Code.Periodic Valve Disassembly Suggested Project stage: Supplement ML20141B8261985-12-17017 December 1985 Evaluation of Spent Fuel Racks Structural Analysis, Millstone Nuclear Power Station Unit 2, Technical Evaluation Rept Project stage: Other ML20138R2191985-12-24024 December 1985 Safety Evaluation Supporting Amend 108 to License DPR-65 Project stage: Approval ML20138R2171985-12-24024 December 1985 Amend 108 to License DPR-65,eliminating 18-month Battery Svc Test During Every 60th Month,Since More Stringent Performance Discharge Test Performed Project stage: Other ML20141F8781986-01-0303 January 1986 Advises That Review Underway of Proposed Inservice Insp & Testing Program,Submitted on 850627.Proposal Would Increase Program Beyond Current Tech Spec Requirements.Final Approval of Submission Will Be Granted Upon Completion of Review Project stage: Other ML20141N0411986-02-0404 February 1986 Safety Evaluation Supporting Amend 110 to License DPR-65 Project stage: Approval ML20141N0371986-02-0404 February 1986 Amend 110 to License DPR-65 Changing Tech Specs to Add Fire Detector,Sprinkler Sys & Fire Hose Stations Recently Installed & Changing Wording of diesel-driven Fire Pump Surveillance Requirements Project stage: Other ML20214N7971987-05-27027 May 1987 Forwards Request for Addl Info for Review of 850627 Submittal Re Inservice Testing at Facility.Addl Info Should Be Submitted within 60 Days of Ltr Receipt Project stage: RAI A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 1701987-05-29029 May 1987 Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 Project stage: Other ML20195G5271987-10-0202 October 1987 Technical Evaluation Rept:Millstone Nuclear Power Station, Unit 1,Post-Fire Shutdown Evaluation,App R Project stage: Other A06958, Confirms 880515 Revised Due Date for Util Response to NRC Request for Addl Info Re Inservice Insp Program,Per Telcons W/Facility Project Manager1988-01-0808 January 1988 Confirms 880515 Revised Due Date for Util Response to NRC Request for Addl Info Re Inservice Insp Program,Per Telcons W/Facility Project Manager Project stage: Request ML20151M0621988-04-14014 April 1988 Advises That Revised post-fire Safe Shutdown Methodology Conforms W/Requirements of Sections III.G.3. & Iii.L of App R,10CFR50 & Acceptable,Per .Technical Evaluation Rept SAIC-87/3084 Encl Project stage: Other ML20154E9881988-05-12012 May 1988 Fowards Addl Info Re Inservice Insp Program,Per 880212 Request.Attachment 1 Consists of Util Response to Questions Posed in NRC & Attachment 2 Consists of Revised Program Sections Project stage: Other ML20150C7151988-06-28028 June 1988 Forwards Request for Addl Info Re Pump & Valve Inservice Testing Program.Response Requested within 60 Days of Receipt of Ltr Project stage: RAI 1985-07-24
[Table View] |
Text
--
p--
_ \\, _.
Docket No. 50-336 Attachment Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specification 3/4.7.10 Penetration Fire Barriers.
I.
October 1985 E '88&M 88&884u P
PM
b
?,.
PLANT SYSTEMS 3/4.7.10 PENETR ATION FIRE BARRIERS LIMITING CONDITION FOR OPER ATION 3.7.10 All fire rated assemblies (walls, ficor/ ceilings, cable tray enclosures, and other fire barriers) separating safety-related fire areas or separating portions of redundant systems important to safe shutdown within a fire area and all sealing devices in fire rated assembly penetrations (fire doors, fire windows, fire dampers, cable, piping, and ventilation duct penetration seals shall be OPERABLE.
APPLICABILITY: At all times unless otherwise determined that the separation of saf ety-related fire areas or separating portions of redundant systems important to safe shutdown within a fire area is not required based on the MODE of operation.
ACTION:
a.
With one or more of the above required fire rated assemblies and/or penetration sealing devices inoperable, within 1 hour:
1.
determine that the fire areas / zones on both sides of the affected fire rated assembly and/or penetration sealing device are monitored by either an OPERABLE fire detection or automatic suppression system and establish a fire watch patrol that inspects both areas at least once per hour, g 2.
establish a continuous fire watch on at least one side of the affected fire rated assembly and/or penetration seal, E 3.
temporarily repair the inoperable fire rated asseinbly and/or sealing device and classify h as temporary.
All temporary or inoperable fire rated assemblies and/or sealing devices sha!! be permanently repaired within thirty (30) days, or implement action 1 or 2 above, b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
l MILLSTONE - UNIT 2 3/4 7-42 l
w
f.',
SURVEILL ANCE REQUIREMENTS 4.7.10 The above required fire ratco assemblies and penetration sealing devices shall be verified to be OPER ABLE by a visual inspection:
a.
At least once per IS months for fire doors and fire dampers.
l b.
At leas.t once per IS months for fire barrier penetration seals, on at least 10% of the total number of penetration seals. If any of the
.l penetration seals in the inspection sample are found to be inoperable, then an additional 10% sample of the total number of penetrations seats shall be visually inspected.
Sampling and inspection shall continue until all of the seals in a sample are found OPER ABLE or 100% of the seals are inspected, c.
Prior to returning a fire rated assembly and/or penetration sealing device to OPERABLE status following repairs or maintenance.
MILLSTONE - UNIT 2 3/4 7-43
-