Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F8011999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML20212B6491999-09-15015 September 1999 Informs That Encl Announcement Re 990913 Application for Amend to Licenses NPF-9 & NPF-7 Forwarded to C Observer in North Carolina,For Publication ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A0501999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementing Code Case for Duration of Insp Interval ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211J3671999-08-31031 August 1999 Forwards Public Notice of Application for Amend to License NPF-9 Seeking one-time Extension of Surveillance Frequency for TS SR 3.1.4.2 Beyond 25% Extension Allowed by TS SR 3.0.2 ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211K8831999-08-26026 August 1999 Forwards Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs ML20211G5181999-08-24024 August 1999 Forwards SE Re second-10-yr Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0171999-08-13013 August 1999 Confirms Conversation Between M Cash & M Franovich on 990806 Re Mgt Meeting,Scheduled for 990917 to Present self- Assessment of Plant Performance.Meeting Will Be Held in Atlanta,Ga ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 ML20210R0031999-08-10010 August 1999 Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves ML20210Q3701999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date in Order to Register Individuals to Take Exam ML20210H7691999-07-21021 July 1999 Submits Summary of 990715 Meeting at Facility Re Presentation of Results of Most Recent Periodic Ppr.List of Meeting Attendees Encl ML20209H1551999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for May 1999 Also Encl ML20210E1931999-07-13013 July 1999 Forwards Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20209G5151999-07-0808 July 1999 Forwards Amended Pages to Annual Radioactive Effluent Release Repts, for 1997 & 1998 for McGuire Nuclear Station. Portion of Rept Was Inadvertently Omitted Due to Administrative Error,Which Has Been Corrected ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20196J4381999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid Version 2 ML20196G3721999-06-24024 June 1999 Documents Verbal Info Provided to NRR During Conference Call Re Relief Requests 98-002 & 98-003 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20195K3601999-06-14014 June 1999 Forwards MORs for May 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised MORs for Apr 1999.Line 6 Max Dependable Capacity (Gross Mwe) on Operating Data Rept Should Be Revised to 1114 from Jan 1998 to Apr 1999 ML20195D5691999-06-0303 June 1999 Submits Ltr to Facilitate Closing of Inspector Follow Up Item 50-369,370/97-15-05,re Revising Site Drawings in UFSAR Into Summary one-line Flow Diagrams,Per NRC 990327 Telcon ML20195F1851999-06-0202 June 1999 Forwards Insp Repts 50-369/99-03 & 50-370/99-03 on 990328- 0508.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20195E8771999-06-0202 June 1999 Confirms Telcon with M Cash on 990524 Re Public Meeting for 990715.Purpose of Meeting to Discuss Results of NRC Most Recent PPR ML20207D0521999-05-21021 May 1999 Informs That in Telcon on 990519 Between a Orton & Rf Aiello Arrangements Made for Administration of Initial Written Exam for McGuire Nuclear Station on 990603.Exam Will Be Administered at Catawba Simultaneously with Written Exam ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206R0791999-05-13013 May 1999 Forwards Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20210R0031999-08-10010 August 1999 Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 ML20209H1551999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for May 1999 Also Encl ML20209G5151999-07-0808 July 1999 Forwards Amended Pages to Annual Radioactive Effluent Release Repts, for 1997 & 1998 for McGuire Nuclear Station. Portion of Rept Was Inadvertently Omitted Due to Administrative Error,Which Has Been Corrected ML20196G3721999-06-24024 June 1999 Documents Verbal Info Provided to NRR During Conference Call Re Relief Requests 98-002 & 98-003 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20195K3601999-06-14014 June 1999 Forwards MORs for May 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised MORs for Apr 1999.Line 6 Max Dependable Capacity (Gross Mwe) on Operating Data Rept Should Be Revised to 1114 from Jan 1998 to Apr 1999 ML20195D5691999-06-0303 June 1999 Submits Ltr to Facilitate Closing of Inspector Follow Up Item 50-369,370/97-15-05,re Revising Site Drawings in UFSAR Into Summary one-line Flow Diagrams,Per NRC 990327 Telcon ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20206R0791999-05-13013 May 1999 Forwards Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206S9151999-05-11011 May 1999 Forwards Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. Section 16.11-16.2 Has Been Revised to Apply Guidance of NUREG-0133 for Performing Gaseous Effluent Dose Pathway Calculations ML20206K1341999-05-0303 May 1999 Forwards 1999 Interim UFSAR for McGuire Nuclear Station. UFSAR Update Includes Items Relocated During Improved Tech Specs Implementation.Next Regular UFSAR Update as Required 10CFR50.71(e) Is Due in Oct 1999 ML20206F3321999-04-28028 April 1999 Forwards Annual Radioactive Effluent Release Rept for 1998 for McGuire Nuclear Station. Listed Attachments Are Contents of Rept.Revised ODCM Was Submitted to NRC on 990203 ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20206B4791999-04-20020 April 1999 Requests Exemption from GDC 57 Re Reactor Containment - Closed Sys Isolation Valves,As Described in 10CFR,App a for Containment Penetrations M393 & M261.Detailed Technical Evaluation & Justification for Exemption Request,Encl ML20205S9731999-04-19019 April 1999 Submits Info Re Quantity of SG Tubes Inspected,Tube Indications of Imperfections & Tubes Removed from Svc by Plugging,Per TS 5.6.8,part B 05000369/LER-1999-001, Forwards LER 99-01(S)-00 Re Contract Employee Submittal of False Info Resulting in Gaining Unescorted Access.No Licensee Planned Corrective Actions or Other Regulatory Commitments Were Identified as Result of Incidence1999-04-16016 April 1999 Forwards LER 99-01(S)-00 Re Contract Employee Submittal of False Info Resulting in Gaining Unescorted Access.No Licensee Planned Corrective Actions or Other Regulatory Commitments Were Identified as Result of Incidence ML20205P8891999-04-13013 April 1999 Forwards Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for Feb 1999 Encl ML20206K3561999-04-13013 April 1999 Forwards Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual. Significant Changes Are Marked by Vertical Bars on Right Margin ML20205K5131999-04-0707 April 1999 Forwards Complete Response to NRC 981209 & 990105 RAIs on Question 11 Re LARs for McGuire & Catawba Nuclear Stations. Addl Info Received from W & Contained in Encl W ML20205B6011999-03-23023 March 1999 Requests That NRC Place Technical Interface Agreement 97-02 Re URI 96-11-03,raising Operability & Design Criteria Conformance Issues Re Hydraulic Snubbers Installed at Plant & NRR Response on Dockets to Provide Record of Issue ML20205C4611999-03-23023 March 1999 Submits Correction to Violation Against 10CFR50 App B, Criterion VII, Control of Purchased Matl,Equipment & Svcs, Issued to McGuire Nuclear Station on 980807 ML20205B6161999-03-23023 March 1999 Provides Addl Info & Correction to Typo in Re License Bases Record Change Re License Amend Submittals ,approved as FOL NPF-9 & NPF-17,amends 184 & 166, respectively.Marked-up TS Pages,Encl ML20204J0051999-03-19019 March 1999 Forwards Response to 990127 & 28 RAIs Re GL 96-05 for Catawba & McGuire Nuclear Stations ML20204E1791999-03-18018 March 1999 Reflects 990318 Telcon Re License Bases Record Change for License Amend Submittals ,approved as Amends 184 & 166,respectively for Licenses NPF-9 & NPF-17.TS Pages Encl ML20204C8821999-03-15015 March 1999 Forwards Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for Jan 1999 Encl ML20207C2071999-02-25025 February 1999 Informs of Revised Expected Submittal Date of Proposed License Amend Presented at 990127 Meeting Re Soluble Boron & Boraflex.Util Plans to Submit Proposed License Amend in First Quarter of 1999 ML20207C7691999-02-22022 February 1999 Forwards Annual Occupational Radiation Exposure Rept for 1998. Rept Provides Tabulation of Number of Station,Utility & Other Personnel Receiving Exposure Greater than 100mRem/yr Followed by Total Dose for Each Respective Worker ML20207C6851999-02-22022 February 1999 Forwards Revised TS Bases Pages,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20206S3341999-01-28028 January 1999 Forwards Proprietary & non-proprietary Responses to NRC 981209 & 990105 RAIs Re Util Lars,Permitting Use of W Fuel at McGuire & Catawba Stations.Proprietary Info Withheld,Per 10CFR2.790 ML20199E0081999-01-12012 January 1999 Forwards MOR for Dec 1998 & Revised MOR for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199C9861999-01-0707 January 1999 Forwards Annual Lake Norman Environ Summary Rept for 1997,as Required by NPDES Permit NC0024392,including Detailed Results & Data Comparable to That of Previous Years.With Corrected Pages 3 & 19 to 1994-95 Lake Norman Creel Rept 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L0101990-09-19019 September 1990 Provides Addl Response to Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11,per .Corrective Action:Operations & Compliance Mgt Further Examined Event & Concluded That Trains Vc/Yc Inoperable Per Special Order ML20059L0091990-09-18018 September 1990 Informs of Delay in Response to Violations Noted in Insp Repts 50-369/90-14 & 50-370/90-14.Delay Due to Ongoing Review ML20059L5491990-09-14014 September 1990 Forwards Proprietary Response to Question Re Scope of Review of Topical Rept, Safety Analysis Physics Parameter & Multidimensional Reactor Transients Methodology, Per & 900723 Meeting.Response Withheld ML20059J7121990-09-14014 September 1990 Forwards Monthly Operating Rept for Aug 1990 for McGuire Nuclear Station Units 1 & 2 & Monthly Operating Status Rept for Jul 1990 ML20059L5521990-09-14014 September 1990 Forwards Response to 18 Questions Re Topical Rept DPC-NE-2004,per NRC 900802 Request for Addl Info.Encl Withheld (Ref 10CFR2.790) ML20065D4671990-09-11011 September 1990 Informs of Delay in Response to Violation Noted in Insp Repts 50-369/90-11 & 50-370/90-11,per Commitment in ML20064A8031990-09-10010 September 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-369/90-13 & 50-370/90-13.Corrective Actions:Procedures Dealing W/Fuel Handling Will Be Enhanced by Adding Sign Off to Sections Which Ref Fuel Handling in Tech Specs ML20059G3011990-09-0404 September 1990 Forwards Response to NRC 900327 Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20064A5741990-09-0404 September 1990 Discusses Re Info to Support Util Position Relative to Resolving Issue of Main Steam Line Breaks Inside Ice Condenser Containments & Requests That Info Be Withheld (Ref 10CFR2.790) ML20064A5671990-09-0101 September 1990 Advises That Corrective Actions Re Violation of Insp Rept 50-369/89-01 & 50-370/89-01 Will Be Completed by 910101 ML20059D3461990-08-30030 August 1990 Forwards Semiannual Effluent Release Rept for First Half of CY90 & Revs to Process Control Program ML20059G9141990-08-22022 August 1990 Forwards Public Version of Revised Epips,Including Change 0 to RP/O/A/5700/01,Change 0 to RP/O/A/5700/02 & Change 0 to RP/O/A/5700/03 ML20059D1901990-08-22022 August 1990 Responds to Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11.Corrective Actions:Valves VC-1,VC-2,VC-3,VC-4, VC-9,VC-10,VC-11 & VC-12 Reopened Upon Discovery of VC-1 - VC-4 Being Closed & Procedure IP/0/13/3006/09 Revised ML16259A2391990-08-22022 August 1990 Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo ML20059C1201990-08-20020 August 1990 Forwards Rept Summarizing Util Findings Re Three False Negative Blind Performance Urine Drug Screens Which Occurred During Jan & Feb 1990.Recommends That NRC Consider Generic Communication to Clearly State Reporting Requirement ML20059B4451990-08-20020 August 1990 Requests That NRC Approval of Original Relief Request 89-02 Be Extended to Include Changes to Mods MG-22233 & MG-22243 as Described.Hydrostatic Testing Impractical Due to Inadequacy of Test Boundaries ML20059C1591990-08-17017 August 1990 Suppls by Providing Addl Info to Support Util Position Re Anl Confirmatory Analysis of Main Steamline Breaks in Ice Condenser Plants.Encl Withheld ML20063Q0901990-08-15015 August 1990 Forwards Monthly Operating Repts for Jul 1990 for McGuire Nuclear Station Units 1 & 2 & Revised Rept for June 1990 ML20063Q2671990-08-14014 August 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8 & Rev 35 to CMIP-9.W/DH Grimsley 900821 Release Memo ML20058N0181990-08-0808 August 1990 Forwards Response to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20063Q0181990-08-0707 August 1990 Confirms That Planned Corrective Actions Listed in Paragraph 3 of Insp Repts 50-369/90-10 & 50-370/90-10,appropriately Described ML20056A9541990-08-0101 August 1990 Provides Final Response to NUREG-0737,Item II.D.1, Performance Testing of Safety Relief Valves. Util Will Change Seal Configuration for Existing Valves to Seal on Steam Medium & Install Continuous Drain for Loop Piping ML20058L4061990-08-0101 August 1990 Forwards Rev 0 to Inservice Insp Rept Unit 1 McGuire 1990 Refueling Outage 6 ML20058L1811990-08-0101 August 1990 Forwards Safety Evaluation of Large Break LOCA Event Reanalysis Per 10CFR50.46 Re Peak Clad Temp Increases ML20059K0291990-08-0101 August 1990 Forwards Comments on Reactor Operator & Senior Reactor Operator Written Exams Administered on 900730 ML20056A1571990-07-23023 July 1990 Forwards Public Version of Change 0 to RP/0/A/5700/10 & Rev 25 to Section 18.2 of Radiation Protection Manual.W/ Dh Grimsley 900730 Release Memo NLS9000259, Responds to Violations Noted in Insp Repts 50-369/90-09 & 50-370/90-09.Corrective actions:in-house Training Will Be Provided on Correct Method for Determining Proper Response to Problem Investigation Processes1990-07-16016 July 1990 Responds to Violations Noted in Insp Repts 50-369/90-09 & 50-370/90-09.Corrective actions:in-house Training Will Be Provided on Correct Method for Determining Proper Response to Problem Investigation Processes ML20055F7721990-07-13013 July 1990 Forwards Monthly Operating Repts June 1990 for McGuire Nuclear Station Units 1 & 2 & Status Rept for May 1990 ML20044B0561990-07-0303 July 1990 Forwards Public Version of Epips,Consisting of RP/0/A/5700/02 & RP/0/A/5700/03 & RP/0/A/5700/04.W/ Dh Grimsley 900716 Release Memo ML20044A7941990-06-19019 June 1990 Forwards Public Version of Epips,Including HP/0/B/1009/06, HP/0/B/1009/10 & HP/0/B/1009/20 ML20043H5541990-06-18018 June 1990 Forwards Supplemental Info to Tech Spec Rev Request Re Auxiliary Bldg Filtered Ventilation Sys ML20043G1531990-06-15015 June 1990 Forwards Monthly Operating Repts for May 1990 & Corrected Unit Shutdowns & Power Reductions for Apr 1990 ML20043G1741990-06-0707 June 1990 Responds to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire. Correct RCS Operating Pressure Would Be 2,250 Psia as Identified in Table 3-1 ML20043G3451990-06-0707 June 1990 Forwards Proprietary Response to Request for Addl Info Re Topical Rept BAW-10174, Mark-BW Reload Safety Analysis for Catawba & Mcguire. Response Withheld ML20043G7171990-06-0606 June 1990 Forwards Population Dose Analysis Summary for Plant Liquid Release Pathways Based on 1986 Release Estimates ML20043G6321990-06-0505 June 1990 Responds to Violations Noted in Insp Repts 50-369/90-01 & 50-370/90-01.Corrective Actions:Memo Issued Reemphasizing Importance of Frisking & Outlining Frisking Requirement & Personnel Counseled Re Completing Required Documentation ML20043G6281990-06-0404 June 1990 Advises That Corrective Actions Re Departmental Interface Issues to Resolve & Train on Revised Directive Will Be Completed by 900901,per Insp Repts 50-369/89-01 & 50-370/89-01 ML20043F4761990-05-30030 May 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Consisting of Rev 20 to CMIP-13 & Deletion of CMIP-15 & CMIP-17.W/900612 Release Memo ML20043B5691990-05-23023 May 1990 Advises That Responses to Violations Noted in Insp Repts 50-369/90-01 & 50-370/90-01 Will Be Delayed Until 900601 ML20043C0781990-05-22022 May 1990 Responds to Violations Noted in Insp Repts 50-369/90-04 & 50-370/90-04.Corrective Actions:Correct Procedure Adherence Reemphasized to Job Supervisor & Engineering Group Involved in Authorization for Torque Change ML20043B9351990-05-16016 May 1990 Forwards Public Version of Epips,Including HP/1/B/1009/15 & HP/2/B/1009/15.W/DH Grimsley 900529 Release Memo ML20043A1041990-05-15015 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Mar 1990 for McGuire Nuclear Station Units 1 & 2 ML20042G8221990-05-10010 May 1990 Forwards Addl Info Re Events Leading to 900509 Emergency Tech Spec (TS) Request Re TS 4.6.1.8,per Ds Hood 900510 Telcon & Requests That Changes Also Be Made to Unit 2 Ts. Proposed TS Encl ML20043A8621990-05-10010 May 1990 Forwards Info for Facility 1990 Refueling Outage Re Steam Generator F* Tubes & Tubes Removed from Svc or Repaired ML16152A9621990-05-0909 May 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 35 to CMIP-1,Rev 26 to CMIP-2,Rev 31 to CMIP-4,Rev 35 to CMIP-5,Rev 40 to CMIP-6,Rev 39 to CMIP-7 & Rev 26 to CMIP-8.W/DH Grimsley 900517 Release Memo ML20042G8331990-05-0808 May 1990 Forwards Info for Facility Tube Rupture Outage Re Steam Generator Inservice Insp,Per Tech Spec 4.4.5.5 & 6.9.2 ML16152A9531990-05-0202 May 1990 Forwards Proprietary DPC-NE-2000P-A & Nonproprietary DPC-NE-2000-A, DCHF-1 Correlation for Predicting Heat Flux in Mixing Vane Grid Fuel Assemblies. Proprietary Rept Withheld ML20042F2611990-04-30030 April 1990 Forwards Technical Evaluation That Concludes Fireproofing of Supports for safety-related HVAC Ducts Not Required & Amends Fire Protection Commitment Re HVAC Sys Support Fireproofing ML20042F8331990-04-26026 April 1990 Forwards Public Version of Revised Epips,Including Change 0 to RP/0/A/5700/01,RP/0/A/5700/02 & RP/0/A/5700/03 ML20042E0631990-04-13013 April 1990 Forwards Monthly Operating Repts for McGuire Nuclear Station for Mar 1990 & Feb 1990 Rept Re Personnel Exposure 1990-09-04
[Table view] |
LER-2081-181, Forwards Updated LER 81-181/03X-1.Detailed Event Analysis Encl |
Event date: |
|
---|
Report date: |
|
---|
3692081181R00 - NRC Website |
|
text
V I s
- Dmm Powsic COMPANY STEAM I*ItODUCTION DE1"T.
GENEllAL OFFICES TELEPHONE; AREA 704 P. O. BOX 3318e 422 SOUTH CHURCH STREET tv s is.4o t t CII AltLOTTE, N. C. 28242 ;
August 3, 1982 l G
4 p
E Mr. James P. O'Reilly, Regional Administrator ,,
U. S. Nuclear Regulatory Commission g Region II N 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 -
Re: McGuire Nuclear Station Unit 1 Docket No. 50-369
Dear Mr. O'Reilly:
Please find attached Revision 1 to Reportable Occurrence Report R0-369/81-181.
The report has been revised in its entirety. The original report was submitted by Mr. W. O. Parker, Jr.'s letter of January 19, 1982. This report concerns T.S.3.8.2.3, "The following D.C. channels shall be operable and energized:...
- b. Channel 2 consisting of 125 volt DC Bus No. EVDB, 125 volt DC Battery Bank No. EVCB and a full capacity charger...". This incident was considered to be of no significance with respect to the health and safety of the public.
Submittal of this Revision also fulfills commitments made in Duke Power Company's response to the violation identified in IE Inspection Report 50-369/82-08 (ref.
Mr. W. O. Parker, Jr.'s letter of May 28, 1982).
Very truly yours, C, -
H. B. Tucker, Vice President
! Nuclear Production PBN/j fw Attachment cc: Director Records Center Office of Management and Program Analysis Institute of Nuclear Power Operations U. S. Nuclear Regulatory Commission 1820 Water Place Washington, D. C. 20555 Atlanta, Georgia 30339 Mr. P. R. Bemis Sr. Resident Inspector-NRC McGuire Nuclear Station
~' ~ -
8208160412 DR ADOCK O khhhj 9 PDR [g g Q )
c' .
DUKE POWER COMPANY McGUIRE NUCLEAR STATION REPORTABLE OCCURRENCE REPORT NO 81-181 (REVISION)
REPORT DATE: August 3, 1982 FACILITY: McGuire Unit 1, Cornelius, NC IDENTIFICATION: 125V Battery EVCB Was Left Connected to Vital 16C Bus EVCB Af ter the Specific Gravity (S/C) Was Found to be Lower Than Technical Specification Limits DISCUSSION: On November 12, 1981, cell #31 of 125VDC Vital Instrumentation and Control Power Battery EVCA was found to have a specific gravity (S/G) reading lower than the other cells. Although the specific gravity was above the minimum Technical Specification value, it was more than 0.020 below the average of all the battery's cells. At 1735, EVCA was isolated from its normal distribution center, EVDA, and placed on equalizer (high voltage) charge. During the battery charge, distribution center EVDA was energized by connecting it, via tie circuit breakers, to EVDC.
The morning of November 13, while EVCA was out of service, instrumentation and electrical (IAE) technician A measured the specific gravity of cells in Vital Battery EVCB and found cell #16 below Technical Specifications limits (1.194 versus required 1.195). He also determined by calculation that cell #16 was more than 0.020 below the average S/G of the battery. He documented the readings per proce-dure "125 Volt Vital Batteries Weekly / Monthly Inspection and Preventative Mainten-ance", and on the work request. Since his normal supervisor was off duty, he reported his findings to IAE Supervisor A. Supervisor A took the data to his super-visor, IAE Unit Coordinator A, and discussed the findings and the accuracy of the measurement methods. The unit coordinator requested the assistance of IAE Supervisor B, who has had experience with battery systems, and together they remeasured the S/G of the electrolyte in cell #16 of EVCB. First, they measured the fluid in the simple tube as the technicians had done, with the same results. They then mixed the fluid in the battery by taking electrolyte from the sample tube and releasing it in the center of the cell. Subsequent measurement of the fluid in the center of the cell gave readings that met the Technical Specification limits. Based on the later measurements, the Unit Coordinator and Supervisor B determined that the cell and battery were operable although the cell was lower than other cells in the battery.
They did not notify the Shift Supervisor or document these measurements.
IAE Technician A remeasured the S/G of EVCB cell #16 on November 14, using the same method he had used previously. The reading was below Technical Specification limits and he reported this finding to his normal IAE supervisor who had returned to duty.
This supervisor, C, notified the Shift Supervisor that EVCB was inoperable. Opera-tions returned battery EVCA to service at 0805 and removed EVCB from service at 0821.
EVCB was placed on an equalizer charge.
Battery EVCB was returned to service at 0924 on November 15, although specific gravity readings documented on the work request indicated that cell #16 was still below Technical Specification limits. No reason could be found for this action in documentation or in the memory of the control room senior reactor operator (SRO) involved, and the date was incorrectly logged as November 14. At 1710 an inadvertent reactor trip occurred during preparations for the Dropped Rod Test. The reactor was restarted and tripped again at 2306 in conjunction with the test. Shortly before the
r~
Report No.81-181 (Revision) !
Page 2
{ !
I second trip, IAE informed Operations that battery EVCB was not in compliance with Technical Specifications, and it was declared inoperabic (at 2223). As soon as ,
the operators had stabilized the plant following the Dropped Rod Test, EVCB was !
removed from service (0010 on November 16). The plant was cooled down to Mode 5 t (Cold Shutdown) by 0800 on November 16. Battery EVCB remained out of service ;
until cell #16 was jumpered out on November 20. The battery was then returned to J service with 58 connected cells (normally 59 connected cells).
During the incident the unit operated at 48% power.
Technical Specification 3.8.2.3 requires that all four 125 VDC Vital Instrument ,
and Control Power channels be energized and operable for operation in Modes 1-4.
The specification also includes action statements and surveillance requirements that define cell and battery operability. This incident involves the failure to meet these requirements.
Causes of the incident include: Component Malfunction / Failure-defective battery cell; Administrative / Procedural Deficiency-the battery inspection and preventative maintenance procedure did not detine the S/G measurement method and Operations' documentation methods were not adequate; and Personnel Error-inadequate or error-neous documentation of events by IAE and Operation personnel. '
EVALUATION: The battery cells are about 20" high and are equipped with a sample tube !
which extends down into the cell about 7". Electrolyte level ranges from 18.25-19".
With the cell full of fluid, the 3" hydrometer tube could only extend about 1.25 inches below the surface to draw a sample. Since some stratification could be expected in the electrolyte, a sample drawn in this fashion is very conservative. ;
Supervisor B obtained a more representative sample of electrolyte, on the 13th, by removing it through the sample tube and depositing it in the top center of the battery coll. lie then sampled the top center of the cell and found the S/G to be I above 1.200. The inspection procedure did not define the method to be used in !
sampling batteries and the technicians had adopted the process of drawing a sample <
from the sample tube without any preliminary mixing.
Even though the S/G of cell #16 was low, it is felt that cell reversal was not a danger during the incident. Voltage of cell #16 was measured at 2.18 volts on November 13, meaning that the cell was still strong (average cell voltage was 2.25 on the battery) even though the S/G was low. It is possible that the low S/G was caused by a loss of part of the acid in the electrolyte during the life of the cell.
This could have happened by spillage or overfilling the cell. If this were the case, the cell might have had more capacity than was indicated by the S/G reading.
A service discharge test was conducted on battery EVCB on February 23, 1982 with 58 connected cells (cell #16 was still jumpered out). The test was conducted by dis-charging the battery at 1217 amps. for one minute and then 370 amps. for an additional 59 minutes. At the end of the first minute the battery voltage was measured at 105 volts, and after the discharge was completed, battery voltage was 112 volts. These values were well above the acceptance criteria of 103 volts. Even if cell 16 had reversed, the battery was capable of fulfilling its design function.
~
Report No.81-181 (Revision)
Page 3 The failure of IAE Supervisor B and the Unit Coordinator to resolve the discrepancy between their S/G readings and the readings taken by the technician, and to document the resolution, caused confusion and raised doubts about the actions taken on Novem-ber 13, 1981. The Technical Specification limit on operation with an inoperable battery (72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />) had no effect on IAE Supervisor B and the Unit Coordinator's decision to keep battery EVCB in service. Battery EVCA was able to meet the Technical Specification requirements and was placed on equalizing charge only as a preventative measure. It could have been returned to service at any time. The Dropped Rod Test had been scheduled for November 15, so battery EVCB could have been removed from service on November 13, and remained out of service until the reactor trip and cooldown without exceeding the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
When EVCB was returned to service on November 15, no reason was listed in the Technical Specification Action Item Log. The date was incorrectly listed as November 14, 1981. No reason has been found for returning EVCB to service at this time. The operators expected to trip unit i reactor within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and proceed to Mode 5, therefore, no Technical Specification time limit was involved in the decision.
Many of the problems and much of the confusion concerning this incident were caused by inadequate documantation of the actions taken. Although the battery testing performed by the IAE technician on the morning of November 13, was well documented on the procedure and work request, subsequent testing by the IAE supervisor was not documented. This failure implied, to a reviewer, that no action was taken af ter cell #16 of EVCB was found out of specification. In the second instance, returning EVCB to service on November 15, the personnel involved cannot remember why that action was taken.
Some confusion was caused by Control Room logbook entries concerning the I&C batteries. The operators would initiate a Technical Specification Action Item,
, clear the item 15 or 20 minutes later and immediately initiate a second item on
! the same battery. The purpose of this double entry system was to indicate that the j defective battery had been removed from its associated bus within the two hour time limit. The Technical Specification Action Item Logbook has been expanded to allow r operators to enter appropriate comments. This should help alleviate some of the
( confusion which led to this incident.
Vital batteries at McGuire are oversized and can be safely operated with fewer than the normal 59 cells connected. Documentation to support such battery operation was provided on November 20, 1981 when the appropriate one line diagram drawing-was reissued with a note added. This note states " Battery sizing is such that one cell may be jumpered out without adversely affecting designed capacity. The jumpering of one cell is not considered a modification to a battery bank".
SAFETY ANALYSIS: An analysis of battery loading calculations by Duke Power Company has determined that one cell may be jumpered without adversely affecting the design capacity of the battery. The service discharge test of February 23, 1982 proved that EVCB could have performed as designed with, or without, cell #16.
Additionally, the 125 volt DC vital instrumentation and control power batteries are sized to support the emergency requirements of both unit 1 and unit 2. Only unit 1 is in operation and the capability of the reduced capacity battery was more than
r__ -
Report No.81-181 (Revision)
Page 4 sufficient to meet all design safety functions. Therefore, the health and safety of the public were not affected by this incident.
CORRECTIVE ACTION: IAE procedure "125 Voit Vital Batteries Weekly / Monthly Inspection and Preventative Maintenance" has been changed to include specific instructions to be followed if S/G readings on a battery fall below the Technical Specification limits. An enclosure was also added to describe, in detail, how S/G readings should be taken. The specified method should standardize S/G measure-ments and result in more representative samples. Since the procedure changes were completed, no problems have occurred with IAE personnel determining a battery's operable status.
The service discharge test completed on February 23, 1982 verified that battery EVCB could function successfully with 58 connected cells.
Authorization has been obtained, through the drawing change mentioned in the evaluation, to jumper out one cell of the 59 cell vital batteries if trouble is experienced. If more than one cell is involved, the previous service discharge test would be reviewed to determine if more than one cell could be removed.
On November 20, cell 16 of the battery was disconnected making EVCB a 58 cell battery. The cell will be replaced with a new cell. Cell 31 of EVCA was replaced with a new cell on June 4, 1981.
This incident has been covered with all station employees through crew meetings.
The necessity of complete and accurate documentation of station activities was stressed. Operators are now required to log the exact reason a system (or piece of equipment) required by Technical Specifications is removed from or returned to service. This should eliminate any confusion among the operators as to the exact status of Technical Specification related equipment.
i