05000321/LER-1979-007, Forwards LER 79-007/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 79-007/03L-0
ML20099A511
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/14/1979
From: Manry M
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20099A515 List:
References
PM-79-162, NUDOCS 7902230099
Download: ML20099A511 (1)


LER-2079-007, Forwards LER 79-007/03L-0
Event date:
Report date:
3212079007R00 - NRC Website

text

Gectp rem CPr. par y - . --

l,'l Post atto'Br.s a-12 ~

  • ' .
  • q,s.tcy.Georta 31513 .\.

^

')'

./ '

'l - . ~ g fe - Tetc,phonc 982 367-7781 912 537 9444

[ -

^

f;7%

Edwin I. Hatch Nuclear Plant Georgia Power

~

tie sourtan cUitic system .

. February 14,1979

.PM-79-162 PLANT E. I. HATCH Licensee Event Report .

Docket No. 50-321 *

- United States fluclear. Regulatory Commission Office of Inspection and Enforcement Region II Suite 3100 101 thrietta Street '

Atlanta, Georgia 30303 ATTENTION: Mr. James P. 0'Reilly Pursuant to Section 6.9.1.2.b (2) of Hatch Unit 1 Technical Specifications, please find attached Reportable Occurrence Report tio. 50-321/1979-07.

'Please be advised that this report was erroneously submitte'd as Report No. <

50-321/1979-22, which was an incorrect number. Repo,rtable Occurrence Report No. 50-321/1979-22, dated 2-9-79, should be discarded and replaced with

  • Reportable Occurrence Report !!o. 50-321/1979-07. .

The valve numb'er was given as E51-F006 in the original repo' r t, but should have been E51-F019. .

f M i

)').N+7TTj M/ Wanry . ,f Plant Manager RTH:Je J

xc: W. A. Widner '

R. D. Baker Control Room

. File .

y O '

9t \

790223D0% .

.S  :

1