Forwards LER 82-004/01T-0.Detailed Event Analysis Encl
ML20052A393
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/13/1982
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20052A394 List:
References
NUDOCS 8204280294
Download: ML20052A393 (2)


LER-1982-004, Forwards LER 82-004/01T-0.Detailed Event Analysis Encl
Event date:
Report date:
2701982004R00 - NRC Website

text

___

.o Dirun Powen COMPANY Pc nb Duit.nswo 422 SocTu Cn6t@ NTREET. CIMH1DTTE, N. C. 2e242

'?{ '

'{ $$

WI LLI AM O. PAR M E R, J R.

%cr Perseerne TcLepwowt; Anta 704 s,c.- P.oover o=

April 13, 1982 37 3-4c e s Mr. Janes P. O'Reilly, Regional Administrator

'Q U. S. l'ucicar Regulatory Commission x/

h'/ \\'s Region il C

.n ' '>b 101 Marietta Street, Suite 3100

[. Y ' t

~

Atlanta, Georgia 30303

, o j. -

g e-s Re: Oconee Nuclear Station 14

-. f' #

Docket No. 50-270 h 9 F'

,2 CDx _ M\\

Dear Mr. O'Reilly:

\\Q ) i b Pleasc find attached Reportable Occurrence Report R0-287/82-04. This report is submitted pursuant to Oconee Nuclear Station Technical Specification 6.6.2.1.a(9), which concerns the discovery of conditions not specifically considered in the safety analysis report or Technical Specifications that require corrective measures to prevent the existence or development of an unsafe condition, and describes an incident which is considered to be of no significance with respect to its effect on the health and safety of the public. My-letter of March 16, 1982 addressed the delay in preparation of this report.

Very truly yours p4 4 =

in William 0. Parker, JFN/php Attachment cc: Document Control Desk Records Center U. S. Nucicar Regulatory Commission Institute of Nuclear Power Operations Washington, D. C. 20555 1820 Water Place Atlanta, Georgia 30339 Mr. W. T. Orders NRC Resident Inspector Mr. Philip C. Wagner Oconee Nuclear Station Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ovacua&E 8 2 0 4 2 8 0 'L9 7 J E 3sL>

4,,

'a DUKE POWER COMPANY OCONEE NUCLEAR STATION UNIT 2 Report Number: R0-270/82-04 Report Date: April 13, 1982 Occurrence Date: March ', 1982 Facility: Oconee Unit 2, Seneca, South Carolina Identification of occurrence: The 2A2 HPI and normal makeup nozzle thermal sleeve was found loose and the safe end to pipe area was cracked.

Conditions Prior to Occurrence: Cold shutdown i

]-

Description of Occurrence: As a result of HPI-makeup nozzle safe end cracks at Crystal River in Florida and Oconee Unit 3, non-destructive examinations of Unit.2 HPI nozzle areas were conducted.- Radiographic Tests (RT) and Ultrasonic Tests (UT)~ revealed -that the 2A2 thermal sleeve was loose and that the safe end and upstream piping inside diameters were cracked. The RT of 2B1 indicated the thermal sleeve was loose, and the RT of 2B2 indicated the thermal sleeve had'a 3600 circumferential crack in the rolled region.

RT of 2Al showed the thermal sleeve to be tight and in position. UT revealed no anomalies on 2Al, 2B1 or 2B2.

- Apparent Cause of Occurrence: The apparent cause of the 2A2 cracked safe end and pipe seems to be thermal fatigue. There appears to be a direct link between loose thermal sleeves and crdeks in this area, but exactly why the thermal sleeves are loose is not known at this time. A Babcock and Wilcox owners group task force is investigating.this problem to determine the cause.

4 Analysis of Occurrence: The material involved in the cracked. safe end and upstream piping is type 316 stainless steel which should exhibit a leak before break. If the cracks had not been found and a leak progressed to a pipe rupture, it would have resulted in a small break loss of coolant accident (LOCA). A small break LOCA has been analyzed in the FSAR and.that analysis indicates that the plant would be able to safely shut down. Thus, the health and safety of the public were not affected by this incident.

. Corrective Action: The 2A2-cracked safe end, piping and thermal sleeve were replaced. The 2B2 thermal sleeve was also replaced. The new thermal sleeve design incorporates features which should better resist movenent..The 2B1 thermal sleeve safe end contact area was hard roll expanded to return the thermal sleeve to its intended condition.