ML20248F197

From kanterella
Jump to navigation Jump to search
Clarifies Tech Spec Rev,Consisting of Changes to App J Test Requirements for Valves CA-27,HP-155 & CF-47.All Lines Leading from Auxiliary Bldg to Valves HP-155 & CA-27 Maintained Normally Isolated Through Closed Manual Valves
ML20248F197
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/29/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8910060264
Download: ML20248F197 (2)


Text

._

3 f:g.

k.

p.

p M.W -

Duxe POWER GOMPANY.

P.O. BOX 33189 1

CHARLOTTE, N.C. 28242.

,iHALH.7UCKER Teternoxe

. m2","",C",o., -

M 7" '

!x September 29, 1989 U. S. Nuclear-Regulatory Commission

Document Control Desk-Washington; DC.20555

Subject:

Oconee Nuclear Station

! Docket Nos. 50-269, -270, -287

~

Appendix J testing, Penetration Number 53 Proposed Technical. Specification. Amendment

Dear Sir:

By Mr. W. H. Owen's letter dated September 29, 1989, Duke h'ad submitted a

-proposed Technical Specification revision consisting of' changes to table-

4.1-1,; list of penetrations.with 10CFR50, Appendix J test requirements.
The reason'for the amendment was'due to the discovery.that penetration number 53 had not'been properly tested during'a type A test.

In Mr. W. H. Owen's September 29, 1989 submittal, certain manual valves

.were committed to be maintained closed when containment integrity is requi red.'

In' support of the~ staff's review, the following information regarding valves CA-27, HP-155 and CF-47'is provided.

All lines' leading from the. auxiliary building to' valves HP-155 and.CA-27 are. maintained normally isolated through closed manual valves. The vent

'line to CF-47..is maintained normally isolated through either a closed manual valve or installation of a. pressure gage at the.end of this vent line..Thus, all lines from the auxiliary building to the penetration are

~ double isolated.

Very truly yours, h

p./ s H. B. Tucker N

HBT/71/td 4pl pganse88?ir

~

P

F

,.. <.g Document Control Desk September 29, 1989 Page 2 cc: Mr. S. D. Ebneter Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Atlanta, GA 30323 Mr. L. A. Wiens Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 Mr P. H. Skinner NRC Resident Inspector Oconee Nuclear Station l

I i

1 f

w-