ML20148C862
| ML20148C862 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/22/1997 |
| From: | Taylor J BABCOCK & WILCOX OPERATING PLANTS OWNERS GROUP |
| To: | Birmingham J NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| PROJECT-683, PROJECT-693 JHT-97-25, NUDOCS 9705290199 | |
| Download: ML20148C862 (2) | |
Text
i s
'~
- ,"; GwNEns CR8up I
r Duks Power Company Oconee 1. 2. 3 GPU Nuclear Corporabon TMI-1 Entxrgy Operations. Inc.
ANO-1 Toledo Edrson Company Davts Besse Flonda Pow Corporaten Crystat einer 3
-~
Framatome Technologes, Inc.
IN MG'Im Working Together to Economically Provide Reliable and Safe Electrical Power Suite 525 e 1700 Rockvice Pike e Rockville, MD 20852 e (301)230-2100 l
JHT/97-25 May 22,1997 l
OG-1653 hpjtc1No 683 and 693 i
Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Attention:
Mr. J.L. Birmingham, Project Manager Division of Reactor Program Management
Subject:
B&WOG Topical Report BAW-2241P, " Fluence and Uncertainty Methodologies"
References:
1.
B&WOG letter OG-1651 dated May 14,1997, "B&W Owners Group (B&WOG) Submittal of BAW-2241P, ' Fluence and Uncertainty Methodologies,' April 1997" 2.
Duke Power letter a2ted May 19,1997, ONS Docket Nos. 50-269, -270, -287 Gentlemen:
Reference 1 forwarded proprietary and non-proprietary versions of B&W Owners Group Topical Report BAW-2241P, " Fluence and Uncertainty Methodologies" dated April 1997.
In addition, Reference I requested review of this report to support the review of BAW-2251, " Reactor Vessel Topical Report for License Renewal."
[
t As a result of a telephone call between Mr. Lambros Lois of the USNRC and Mr. Jim Taylor of Framatome Technologies on May 19,1997, we would like to point out that p0t5.6 BAW-2241P will also be referenced in future submittals of pressure-temperature (P-T) limit curve revisions for B&W plants. In the near term, it is expected that submittals for BOI bE' revised P-T curves will be made for the three Oc units (Duke Power Company)in the I b' O first quarter of 1998.
g-i<
)
g.Pt'(
20 NNOn-Ai b llll3lll3Ql3l[Ill{3ll,$l[l3llll 9705290199 970522
/J @OC g l
PDR ADOCK 05000269 P
PDR p2$
)
pf C $
y
i i
e 4
{ b BAW-2241P will also be referenced in the Duke Power License Renewal technical information topical report. The Duke Power schedule and topical report review requirements are shown in Reference 2.
Should you have any questions regarding these submittals, please contact me at 804/832-2817.
j l
Very truly yours, bcu
~
w J. 1. Taylor, Manager Licensing Services j
l WRG/mcl c:
R. J. Prato/NRR
. L. Lois/NRR i
l l
l l
l 1
i i
_..