ML20116F005
| ML20116F005 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/01/1996 |
| From: | Hampton J DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML16141B031 | List: |
| References | |
| NUDOCS 9608060197 | |
| Download: ML20116F005 (2) | |
Text
.
l Il I
~
(Jukehnver Company J W Huints
}
Oconee NudearSite Vicehesident P0.BoxHD (864)885309 Orlice f
Seneca, SC3679 (864)8353%1 Fax j
DUKEPOWER August 1, 1996 j
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i
1
Subject:
Oconee Nuclear Station 1
Docket Nos. 50-269, -270, -287 f
Proposed Revision to Technical Specifications
{
Revision of LPSW-4 and LPSW-5 Surveillance
)
Supplemental Information j
i i
i i
In a letter dated June 6, 1996, Duke Power submitted a l
proposed amendment to the Oconee Nuclear Station Technical Specifications to support removal of the ES signal from valves LPSW-4 and LPSW-5.
During t'.3 *RC review of the proposed amendment, a title header was discovered to have been inadvertently omitted in one of the pages.of the new proposed Technical Specificatwn.
Please find the corrected j
page attached, along with instructions for replacement into the existing proposed amendment package.
Very Truly Yours, A
~
J. W. Hampton Site Vice President Attachment
\\
9608060197 960001 s
PDR ADOCK 050002 9 P
1
\\
\\
j g
Q
- o NRC Document Control August 1, 1996 Page 2 cc:
Mr. S. D. Ebneter Regional Administrator, Region II Mr. P. E. Harmon Senior Resident Inspector Mr. D. E. LaBarge ONRR, Project Manager Mr. M. Batavia DHEC Mr. R. P. Zimmerman ONRR k
I
}
.