ML20148C029

From kanterella
Jump to navigation Jump to search

Forwards Notice of Withdrawal of Application for Amend to Facility Operating License.Proposed Change Would Have Modified Facility Updated FSAR Re Reactor Bldg Response Spectra
ML20148C029
Person / Time
Site: Pilgrim
Issue date: 05/09/1997
From: Wang A
NRC (Affiliation Not Assigned)
To: Boulette E
BOSTON EDISON CO.
Shared Package
ML20148C035 List:
References
TAC-M97806, NUDOCS 9705140383
Download: ML20148C029 (5)


Text

- -

-- - - - --- - ~ ~ ~ ~ ~

-- . . . . . . ./?%. . . . - . - - - - - - - - f]O UNITED STATES

! ',, [r j

a NUCLEAR REQULATORY COMMISSION WASHINGTON D.C. 30eeHo01

'2 8 May 9, 1997 k . . . . . ,o I

l-

! Mr. E. Thomas Boulette, Ph.D l Senior Vice President - Nuclear Boston Edison Company

! Pilgrim Nuclear Power Station '

l RFD #1 Rocky Hill Road l Plymouth, MA 02360 i

SUBJECT:

. WITHDRAWAL OF REQUEST FOR LICENSE AMENDMENT REGARDING ALTERNATIVE j REACTOR BUILDING RESPONSE SPECTRA (TAC NO. M97806) i

Dear Mr. Boulette:

! By letter dated January 24,.1997, as supplemented on February 13 and 27, 1997, 1

Boston Edison Company (BEco) applied for an amendment to the Pilgrim Nuclear Power Station Operating License No. DPR-35. The proposed change would have modified the facility Updated Final Safety Analysis Report (UFSAR) pertaining to Reactor Building Response Spectra. The application and su)plements requested a revision to the UFSAR to allow an alternative metiod of deriving  ;

seismic inputs for the analysis of piping systems specified in the January 24, l 1997, letter.

Following a teleconference call with the NRC staff on February 25, 1997, BEco l reevaluated the affected piping systems using seismic inputs based on existing NRC-approved UFSAR analysis criteria and methodology. Based on this reevaluation, BECo determined that the affected piping meets applicable acceptance criteria and that no physical modifications to the affected piping systems were necessary for requalifying the piping. Therefore, under 10 CFR 50.59, BEco has concluded that the affected piping systems met current UFSAR analysis criteria and the requested amendment is no longer required. In response to a staff question on this conclusion, BEco explained that it used the licensing basis in-structure response spectra and evaluated the affected piping for 1/2% damping for an operating basis earthquake loading condition and 1% damping for safe shutdown earthquake, whereas the affected piping were previously analyzed using 5% damping. BEco confirmed that there were no changes made'either in the structural model or in the design response spectra.

Consequently, by letter dated April 9, 1997 BEco withdrew the amendment request. In addition, BECo has informed the staff that they are continuing in 4 their efforts to generate a new reactor building response spectra. A goes 9705140383 970509 PDR ADOCK 05000293 P PDR

)

i I

Mr. E. Thomas Boulette, Ph.D l

} The Commission has filed the enclosed Notice of Withdrawal of Application for '

Amendment to Facility Operating License with the Office of the Federal i Register for publication. If you have any questions or comments, please J j contact me at.(301) 415-1445.

Sincerely, i l i Original signed by  ;

i l 1

Alan B. Wang, Project Manager l l Project Directorate I-3 Division of Reactor Projects - I/II J j Distribution f

Docket No. 50-293 -Docket 4 File RConte, RI PUBLIC

Enclosure:

Notice of Withdrawal PDI-3 RF I SVarga i cc w/ encl: See next page PMilano  :

Slittle AWang. ,

OGC

~

ACRS

)

l DOCUMENT NAME: G:\ PILGRIM \M97806.LET Ta teselve a espy of tido desusnesw. indeses in the hem: *C" = Copy w6thout ett: ,a A (he*E* = copy w6th attachment /encioewe '9s* = tJocopy i

,- - _., _ ^ - _-

0FFICE PM:PDI-3 l LA:PDI-LO V1 Eft 817 I ( A)D:PM-L _ l I 48Agthi NAME AWang W r) Stittle V PMilanf

DATE 04/4 /97 OTy 9 /97 / (4 /4 /97 Q(/'T/97 0FFICIAL RECORD COPY gi s/8

, E. Thomas Boulette Pilgrim Nuclear Power Station ec:

Mr.. Leon J. Olivier Mr. Jeffery Keene Vice President of Nuclear Licensing Division Manager Operations & Station Director Boston Edison Company Pilgrim Nuclear Power Station 600 Rocky Hill Road IFD #1 Rocky Hill Road Plymouth, MA 02360-5599 Plymouth, MA 02360 Ms. Nancy Desmond Resident Inspector Manager, Reg. Affairs Dept.

U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Post Office Box 867 Plymouth, MA 02360 Plymouth, MA 02360 Mr. David F. Tarantino Chairman, Board of Selectmen Nuclear Information Manager 11 Lincoln Street Pilgrim Nuclear Power Station Plymouth, MA 02360 RFD #1, Rocky Hill Road Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall Ms. Kathleen M. O'Toole 878 Tremont Street Secretary of Public Safety Duxbury, MA 02332 Executive Office of Public Safety One Ashburton Place Office of the Commissioner Boston, MA 02108 Massachusetts Department of Environmental Protection Mr. Peter LaPorte, Director One Winter Street Attn: James Muckerheide Boston, MA 02108 Massachusetts Emergency Management Agency Office of the Attorney General 400 Worcester Road One Ashburton Place P.O. Box 1496 20th Floor Framingham, MA 01701-0317 Boston, MA 02108 Chairman, Citizens Urging Mr. Robert M. Hallisey, Director Responsible Energy Radiation Control Program P.O. Box 2621 Massachusetts Department of Duxbury, MA 02331 Public Health 305 South Street Citizens at Risk Boston, MA 02130 P.O. Box 3803 Plymouth, MA 02361 Regional Administrator, Region I U. S. Nuclear Regulatory Commission W.S. Stowe, Esquire 475 Allendale Road Boston Edison Company King of Prussia, PA 19406 800 Boylston St., 36th Floor Boston, MA 02199 Ms. Jane Fleming 8 Oceanwood Drive Duxbury, MA 0233

cc: (cont.)

i Chairman Nuclear Matters Committee i Town Hall  :

11 Line.oln Street -

Plymouth, MA 02360 Mr. William D. Meinert * .

Nuclear Engineer Massachusetts Municipal Wholesale . ,

Electric Company P.O. Box 426 Ludlow, MA 01056-0426 i

e 1

l I

I i

]

4 e

w As

DISTRIBUTION Docket File PDI-3 Rdg. l S. Little May 12e 1997 ,

MEMORANDUM TO: Rules Review and Directives Branch Division of Freedom of Information and Publications Services Office of Administration  !

FROM: Office of Nuclear Reactor Regulation

SUBJECT:

WITHDRAWAL OF REQUEST FOR LICENSE AMENDMENT REGARDING  !

ALTERNATIVEBUILDINGRESPONSESPECTRA(TACNO.M97806) l One signed original of the FederalRegister Notice identified below is attached for your transmittal  !

to the Office of the Federal Register for publication. Additional conformed copies ( 5 ) of the j Notice are enclosed for your use. .

l Notice of Receipt of Application for Construction Permit (s) and Operating License (s). l Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s):

Time for submission of Vieves on Antitrust matters.

Notice of Consideration of Issuance of Amendment to Facility Operating License. (Call with  !

30-day insert date).

Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License (s) and Notice of Opportunity for Hearing.

Notice of Availability of NRC Draft / Final Environmental Statement.

Notice of Limited Work Authorization.

Notice of Availability of Safety Evaluation Report. .

Notice of issuance of Construction Permit (s).

Notick of issuance .of Facility Operating License (s) or Amendment (s). i Order.

Exemption.

Notice of Granting Exemption.

- Environmental Assessment.

. Notice of Preparation of Environmental Assessment.

Receipt of Petition for Director's Decision Under 10 CFR 2.206.

O lasuance of Final Director's Decision Under 10 CFR 2.206.

Other: NOTTEF OF tlfTHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPFDATfMA IicFN9F.

DOCKET NO. 50-293 -

~ Attachment (s): As stated

Contact:

3,. Little Telephone: 415-2025' DOCUMENT NAME:

Ta seceive e copy of thle document, indicate in the box: *C" = Copy without ettechment/ enclosure *E' = Copy with attachment / enclosure 'N' = No copy OFFICE pni _1 l l l l l l l NAME _,,M DATE DI "IW/

OFFICIAL RECORD COPY u