ML20141H411

From kanterella
Jump to navigation Jump to search
Forwards Enforcement Conference Rept Re Apparent Violations at Braidwood Station Identified in Insp Repts 50-456/96-16 & 50-457/96-16 Re Appendix R Issues & Fire Protection Program
ML20141H411
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/19/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
Shared Package
ML20141H415 List:
References
50-456-96-16, 50-457-96-16, EA-97-110, NUDOCS 9705230297
Download: ML20141H411 (2)


See also: IR 05000456/1996016

Text

.. _. .

ct 'o

-

l

May 19. 1997

l EA 97-110

l

l Mr. H. G. Stanley

! . Site Vice President *

Braidwood Station

Commonwealth Edison Company

i R.R. #1, Box 84  !

Braceville, IL 60407

l

'

SUBJECT: NRC PREDECISIONAL ENFORCEMENT CONFERENCE REPORT  !

,

l

Dear Mr. Stanley:

This refers to a Predecisional Enforcement Conference conducted by Mr. A. Bill Beach,

Regional Administrator, and other members of the Region 111 and Headquarters staff on May

14,1997. The subject of this conference was the apparent violations at Braidwood

Station identified in NRC Inspection Reports No. 50-456/96016(DRS); 50-457/96016(DRS)

concerning Appendix R issues and the fire protection program. We have enclosed a report

summarizing the discussion.

! You will be notified by separate correspondence of our decision regarding the Enforcement

Action based on the information presented and discussed at the Predecisional Enforcement

Conference. No response is required until you are notified of the proposed Enforcement

!

Action.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter

and the enclosed report will be placed in the NRC Public Document Room.

'

We will gladly discuss any questions you have concerning this Predecisionci Enforcement

Conference.

Sincerely,

original signed by J. A. Grobe

John A. Grobe, Deputy Director

Division of Reactor Safety

..

l

Docket Nos. 50-456;50-457

Licenses Nos. NPF-72; NPF-77 Ij

-

Enclosure: 1. NRC Predecisional Enforcement Conference

2. Request for Information

See Attached Distribution

o30037

DOCUMENfNAME: G: BRA-ENF.LTR

To rwceive a copy of this document. Indicate in the box *C" = Copy w/o attach /end "E" = Copy w/ attach /enci *N" = No copy

'

l OFFIGE Rill.DRS l Q, Rill.DRS lC 'lli:DRS _ l[ DRSMfp l

NAME Schrum/lc t@ Westberg @ Canksburg M f- Grobe/v(

DATE 5/p7 54& 97 '

5 % /97 5{Y97/

-~~

OFFIGIAL RECOF #

9705230297 970519

.

PDR

O

ADOCK 05000456

PDR  :

llllllfl{lflf.lfl

.. . .

. ,

. _ _ .. _ . .._ _ ._ _ - - _ . _ . . _ _ . . _

i 'e

l

l H. G. Stanley

.

-2- May 19, 1997

.

I

cc w/enci; T. J. Maiman, Senior Vice President,

Nuclear Operations Division

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

T. Tulon, Station Manager

T. Simpken, Regulatory

Assurance Supervisor

I. Johnson, Acting Nuclear

Regulatory Services Manager

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attomey General

State Liaison Officer

Chairman, Illinois Commerce Commission

Distribution:

Docket File w/enct Rlli PRR w/encI J. L. Caldwell, Rllt w/enci

PUBLIC IE-01 w/enct SRis, Braidwood, Byron Rlli Enf. Coordinator w/enct

. OC/LFDCB w/enci Zion, w/ encl R. A. Capra, NRR w/encI

DRP w/enci LPM, NRR w/enct TSS w/ encl

DRS w/enci A. B. Beach, Rlli w/enci CAA1 w/enci

A

i

.

.

!

I

l

-

I

-.

j

.

i

t

'

. - . , --