Submits Addl Info Pertaining to Request to Renew 3 Volt Interim Plugging Criteria for Unit 1.Util Actively Pursuing Resolution of Issue W/Westinghouse & Expect Feedback by 970715
ML20141B206
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 05/08/1997
From: Hosmer J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9705150181
Download: ML20141B206 (1)


Text

r Commonwealth Edison Company 1404 Opus Plxc

<* Downers Grm e. IL 60515 5701 e

May 8,1997 l U.S. Nuclear Regulatory Commission Washington, D.C. 20555 j l

Attention: Document Control Desk l

Subject:

Additional Information Pertaining to the Request to Renew the 3 Volt Interim Plugging Criteria for Braidwood Unit i Braidwood Nuclear Power Unit i NRC Docket Number: 50-456

Reference:

April 30,1997, Meeting between the Commonwealth Edison Company and the Nuclear Regulatory Regarding the AIR 06 Inspection Results for Braidwood Unit 1 During the Referenced Meeting, the Commonwealth Edison Company (Comed) identified a ,

concern to the Nuclear Regulatory Commission (NRC) relative to engineering analyses performed by Westinghouse in support of steam generator 3 Volt Interim Plugging Criteria licensing. The issue is the identification during April 1997 of tests performed by Westinghouse, during late 1995, as a part of field qualifications for the 3 Volt IPC tube locking process. The Staff discussed that Comed needs to be aware of all data and supporting information related to engineering analyses, inspection and repair process which impact steam generator tube integrity for the apphcation of 3 Volt Criteria. Comed agrees with the Staff, and considers the complete disclosure of supporting ,

information to be critical. We are actively pursuing resolution of this issue with Westinghouse and expect feedback by July 15,1997.

If you have any questions concerning this correspondence, please contact Denise Saccomando (630) 663 7283.

Sincerely, D

obra L Jolm B. Ilosmer O

i Engineering Vice President cc: D. Lynch, Senior Project Manager-NRR C. Phillips, Senior Resident inspector-Braidwood G. Dick, Byron /Braidwood Project Manager-NRR A. B. Beach, Regional Administrator-Rill Office of Nuclear Safety-IDNS 9705150181 970500 DR enOCK 05000456 PDR 1 1 K:nlaibybwd\stgen\AR106r2 A t:mcom tempmy