Forwards Performance Data for Util FFD Program for Period July 1996 Through Dec 1996
ML20135C735
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 02/27/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9703040249
Download: ML20135C735 (19)


Text

. 4 g Ctation Support Department

., g 10CFR26.71(d)

. v PECO NUCLEAR nco s, c-A Unit of PECO Energy $ [ p7 $ $l***

l February 27,1997 Docket Nos. 50-277 50-278 50-352 50-353 License Nos. DPR-44 DPR-56 NPF-39 NPF-85 i

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Umerick Generating Station, Units 1 and 2 Fitness-for-Duty Program Performance Data for the Period July 1996 through December 1996 Gentlemen:

Au gulred by 10CFR26.71(d), this letter submits the performance data for PECO Energy's Fitness-for-Duty (FFD) Program for the period July 1996 through December 1996. The data for our Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, and Umerick Generating Station (LGS), Units 1 and 2, sites are provided in Attachments 1 and 2. Data for our Corporate Office and Nuclear Group (PECO Nuclear) Headquarters specimen collection sites (i.e., 2301 Market Street, Philadelphia, PA, and 965 Chesterbrook Boulevard, Wayne PA, respectively) are provided in Attachment 3.

The data are reported on the January 1992 revision of the FFD Performance Data form provided by the Nuclear Energy Institute (NEI), formerly the Nuclear Management and Resources Council (NUMARC), and include the following.

- Drugs tested for and cut-off levels.

Workforce population tested.

- Numbers of tests and results by population and type of test (i.e, pre-access, for.

cause, random, follow-up, and other types of tests).

Substances identified.

QQ/

9703040249 970227 PDR R

ADDCK 05000277:

ppg appsppupp.15

. .g i February 27,1997

, Page 2 I

l i

I Attachments 1, 2, and 3 also include the following.  !

- A summary of management actions.

- Analysis of the data and appropriate actions that have been taken. ,

Random testing rate. -

During this period, there were no significant events reported to the NRC in accordance with  :

10CFR26.73.  :

if you have any questions or require additional information, please contact us.

Very truly yours, l l

. d. '4 g - i G. A. Hunger, Jr., l Director - Licensing  :

Attachments  !

cc: H. J. Miller, Administrator, Region I, USNRC (w/ attachments) [

W. L Schmidt, USNRC Senior Resident inspector, PBAPS (w/ attachments) i N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachments) l i

r k

i

)

l ', -

5 i

i -

i l

l i

\

l 1

fr

! i 4

i  !

ATTACHMENT 1 i

Peach Bottom Atomic Power Station 1 Units 2 and 3 l i r Fitness-for-Duty Performance Data l 3

i j July 1996 through December 1996 i

i 3

.e l

l l

I I

i i

i d

i L; j Attachment 1 Summary of Data Analysis and Management Actions 4

Peach Bottom Atomic Power Station  ;

l July- December 1996 i l

I l- 1. Initiatives Taken  :

i The following summarizes the results of sweeps conducted during the period by PECO Energy i Company's drug sniffing canine teams as well as investigations and interviews used to confirm  !

information about illicit activities at Peach Bottom Atomic Power Station (PBAPS).  ;

a. July 19,1996 - For cause team sweep of contractors private vehicle. Results: One (1)
activation. No drugs found or forensic samples taken. The contractor employee denied  ;

illegal drug use, but admitted associating with friends where there was " heavy pot  !

smoking going on.' On July 24,1996, the contractor employee tested positive for  :

marijuana. Access denied.

l

b. July 22,1996 - General team sweep of contractor employees break rooms. Results:  ;

Three (3) activations. No drugs found or forensic samples taken. l

c. July 26,1996 - For cause search of contractors private vehicle. Numerous alcoholic j beverage containers were discovered in the vehicle. Access denied. l l d. August 23,1996 - For cause interview of contractor based upon derogatory information i received during pre-access processing. Contractor admitted recent (July 1996) use of  ;

marijuana. Access denied.

l l e. August 23,1996 - For cause search of contractors private vehicle. Alcoholic beverage l

discovered under the passenger seat. Contractor admitted use of cocaine (May 1996), ';

as well as previous use of marijuana. Access denied. ;j

f. August 30,1996 - For cause team sweep of contractor seeking to gain unescorted I l access. Contractor admitted to using and dealing marijuana. Access denied. j 1 -
g. September,41996 - For cause search (no dog used) of contractor employee's private  ;

vehicle following positive drug test. No drugs found or forensic samples taken. Access  :

denied.

h. September 5,1996 - For cause interview of a contractor seeking unescorted access.

Contractor admitted to previous drug use and to growing marijuana for personal use. No evidence of rehabilitation. Access denied.

l. September 6,1996 - For cause interview of contractor seeking unescorted access.

Contractor admitted use of marijuana and amphetamines in 1995. No evidence of rehabilitation. Access denied.

J. September 9,1996 - For cause search of contractors private vehicle. Results: One (1) activation. Contractor admitted previous (1995) use of marijuana use, as well as friends smoking marijuana in his vehicle three months ago, i.e., June 1996. Access denied.

. k. September 10,1996 - For cause search of a contractors private vehicle. Results: No i activation's. Contractor disclosed positive marijuana tent on June 1,1996, but stated

that the test was caused by "second hwnd smoke". Contractor admitted use of marijuana j and that he had not completed EAP program as directed by his employer. Access denied.

4 d 3, j

! 't

]

l i  !

1 i

~

l. September 10,1996 - For cause search of a contractors personnel possessions. i

! Results: One (1) activation. Contractor admitted use of marijuana in June 1996. ,

Contractor failed to report for drug and alcohol testing. Access denied.  ;

m. September 11,1996 - For cause interview of a contractor seeking unescorted access. ,

Contractor disclosed he had smoked marijuana in August,1996; a 1988 conviction for j Criminal Conspiracy with the intent to Deliver a Controlled Sube nce; and, a July 1996

i. positive pre-employment drug test. Access denied. *

! n. September 11,1996 - For cause team sweep of a contractors privata vehicle. Results: i j Two (2) activations. Contractor admitted to drug use in 1994 and 1993 positive drug  ;

i test. No evidence of rehabilitation. Access denied.  ;

l

o. September 12,1996 - For cause team sweep of a contractors private vehicle. Results:  !

Two (2) activations. Contractor would not provide the investigators with definitive information regarding his last use of drugs. The contractor admitted to currently  !

possessing drug paraphemalia and to allowing friends to smoke marijuana at his i j residence. Contractor had a 1990 conviction for Possession of Marijuana with the intent I
. to Deliver. Access denied.  !

I i i p. September 13,1996 - For cause interview of a contractor seeking unescorted access. t l Contractor disclosed a 1990 conviction for Possession of Marijuana and admitted to use  ;

of marijuana in 1994. Investigator requested permission to perform a canine search on  ;

j. the contractors vehicle, but was informed that the contractor had been driven to work by  ;

, a coworker. Attempts to locate the coworker were unsuccessful. The contractorwas  !

i directed to report to the Supervisor, Personnel Processing. The contractor failed to

report as directed and also failed to report for training on September 14,1996, i i Contractors pre-access drug test was subsequently verified positive for marijuana.  !

Access denied.

q. September 27,1996 - General team sweep of Pearle Building. Results: Two (2)  ;

activation's. No drugs found or forensic samples taken. I

r. December 5,1996 - Centractor tested positive for alcohol on For Cause test. Contractor admitted excessive drinking and refused to allow Security personnel to search vehicle.  !

Access denied,

s. December 17,1996 - General team sweep of the second and third floors of the l Modification Building. Results: Two (2) activations. No drugs or forensic samples taken. l
11. Manaaement Actions l During the period, thirty-one (31) contractor employees (i.e., twenty-seven pre-access, one random, and three for-cause) tested positive at PBAPS. Unescorted access was denied for the thirty-one (31) contractor employees.

No PECO Energy employees tested positive during the period.

Ill. Events Reported Under 10 CFR 26.73 There were no significant FFD events reported by PBAPS during the period.

i IV. Audits / inspections During the period, an assessment to evaluate implementation of the Fitness-For-Duty (FFD)

Program was conducted by Nuclear Quality Assurance Division personnel. The assessment found that PECO Energy's FFD program is being effectively implemented in accordance with 10 CFR Part 26. Strengths were identified in the areas of site collection anr1 testing, alcohol testing, and overall program administration. l

. Three Corrective Action Reosests (CARS) were identified, as follows:

1. CAR - The HHS-certified laboratory's Standard Operating Procedure (SOP) did not include current data to support the limit of detection and limit of quantification for the 6-MAM (6-AM) procedure. The SOP for the THC immunoassay did not identify the reagent manufacturer and acceptance criteria.

?

2. CAR - Reagent bottles on the HHS-certified laboratory's immunoassay instruments did not reflect the proper reagent lot number. The SOP did not specify that the bottles are cleaned when changing lots.
3. CAR -Three contractor FFD collection site personnel were not properly designated for inclusion in the random testing pool.

I The HHS-certified laboratory has corrected the deficiencies noted. The procedure for identifying  ;

FFD personnel and including them in the random testing pool has been reviewed. Periodic reviews of contractor personnel engaged as FFD personnel will be completed to ensure proper identification.

It was also recommended that the HHS-certified laboratory lower the screening cutoff level for THC to improve the positive confirmation rate; that separate daily maintenance record forms be used for each immunoassay instrument used for on-site testing; that the alcohol calibration check record should be updated; and that a lockable box for control of donor personal effects be provided at collection sites.

The recommendations have been considered.

V. Random Testina Rate PECO Energy maintains separate testing " pools" for amployees and contractors. Random testing is conducted at an annualized rate of 50% The " average number with unescorted access" includes personnel granted unescorted access at both PBAPS and LGS.

VI. Additional Information Actions Taken based upon Unconfirmed On-site Screenina PECO Energy has decided to temporarily suspend access for individuals as pem11tted by 10 CFR 26.24(d).

During the previous 6-month reporting period (i.e., January - June 1996),100 percent of the specimens which were presumptive positive for cocaine as a result of preliminary on-site screening tests were subsequently reported as positive by the HHS-certified laboratory. The confirmation rate for marijuana was 71.4E During reporting period July - December 1996, twenty-eight (28) specimens were reported as presumptive positive for marijuana as a result of on-site screening. Twenty-five (25) of those specimens screened positive and were confirmed as positive by the HHS-certified laboratory.

j '

s. ,

5 i The MRO verified the twenty-five (25) specimens as positive. Since the confirmation rate for marijuana was less than the required 85% during the previous reporting period, no action was -

taken based upon a presumptive positive for marijuana.

l During the reporting period July - December 1996, six (6) specimens were reported as i presurnptive positive for cocaine as a result of on-site screening. All six (6) specimens screened  !

! positive and were confirmed as positive by the HHS-certified laboratory. The MRO verified the

! six (6) specimens as positive. Of the six (6) specimens identified as presumptive positive for ,

! cocaine, one (1) was collected from an individual with unescorted access. The individual was i temporarily suspended pending the confirmatory testing ar'd MRO verification process. The

specimen was subsequently confirmed and verified as positive. The individuals unescorted access was denied. l Reduced Martiuana Cut-off Level During the period, there were twenty-five (25) confirmed positive tests for marijuana at PBAPS.

l Two (2) individuals tested positive on each of two (2) specimens provided. It is estimated that only six (6) of the specimens would have tested positive using the 100 ng/mi immunoassay cut-off level.

i l

l

! i i

1 1

l l

l t

4 i

. . N,

'1 .

Fitness for Duty Program '

' Performance Data  ;

Personnel Subject to 10CFR 26 i PECO ENERGY COMPANY.- DECEMBER 31,1996 Company 8 Monna Ending  !

PEACH BOTTOM ATOMIC POWER STATION locanon t i

DAVID M. SARLEY (215) 841-5703 Conta:: Natt.e Phone (induce area code)

Cutotts: ScreerVCenfirmation (ng'ml) O Appendix A to 10CFR 26 Marijuana 50 / 15 Amphetamines 1000 / 500 /

Cocaine 300 j150 Phencyclidine '25 / 25 /

Opiates )

300 / 300 Alcohol (% BAC) 0.04 /

l I

~

Long-Term Short-Term Testing Results Ucensee Employees Contractor Personnel Contractor Personnel Average Number witt Unescorted Access 2260 1476 4 # #

Categories $ #

-~ Tested Positive Tested Positive Tested Positive Pre-Acces: 76 0 1,325 27-A Post accident 5 0 2 0 0

$ Obsened behavior 6 0 3 3 Random 255 0 183 1 Follow-up 18 0 47 0 Other 14 0 7 0 Total 374 0 1,567 31 REV.1/92

i Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- - flefusal ,

Marijuana Cocaino . Opiates famines clidino ~ Alcohol to Test ' 1 2 3 4 5 t

Licensee Employees .0 0 0 0 0 .0 -0 i

Long-Term Contractors 0 0 0 0 0- 0 0 i Short-Term Contractors 23 6 0 0 0 4 0 A l Total 23 6 0 0 0 4 0 33 f

I i

t

  • f L

2 i

I F

i

[

i

., L i

j i

I e.

  • e

_...__ _ _ _ _ _.._-...m._____.___._m.....--_m -__m_asAi..--._.w,.___m ___._--.m___._______ _.__.m__.____ .mmm_ mm>--m.eu+n _ m.e*++--e*-aw me e he- e ar e--i-i--aw+=eevw at-t-- *=*w**-wreewwmee-e-*mzus'

3 Fitness for Duty Program

. Performance Data Personnel Subject to 10CFR 26 '

l l

pren vnrney enupany DECEMBER 31, 1996 Comcany 6 uenins Ending LIMERICK GENERATING STATION f

Loca:on '

l DAVID M. SARLEY (215) 841-5703

! contac: taarne l Phone (incluoe area coce)

Cutctis: ScreervConfirmation (ng' nil)  :

O Appendix A to 10CFR 26 Marijuana 50 / 15 Amphetamines 1000 500 I

/ /

Cocaine 300 / 150 Phencyclidine 25 / 25 /

! Opiates 300 / 300 l Alcohol (% BAC) 0.04 / i Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel  !

Average Number witt i

Unescorted Access 2260 '

1476 Categories #

i Tested Positive Tested Positive Tested Positive Pre-Acces: 56 0 321 2 n

a Post accident 13 o O 7 o c

g ObseNed behavior i 5 0 4 1 Random 242 0 141 1 FoCow-up 27 0 9 1 Other 17 0 l

31 0 2

l Total 360 0 513 5 REV.1/92

- _ . - ~ . , _ . . . + . - . . . . . ,. . - , . . - . ~ . . . _ - , , . - . . - - . . .. .-.. . . ~ . - .n..___.--..~.~~~.-

F l

  • i a' , ,

< m i

R h I I m

! 6 k

,-. Y l

i t

! 1

[- 4 t') . <

t I

I i

i U [

l L

I r ,9'8 i

l I'

! ' ,~9 g 1

  • C 2&

C o o o o CC l C tra m Q O o 'o m m

-U -u C <

50; *

,C D '

, = g e! e o o o -

l Cf) mU a..

Q

. .C. .m Q O Q

C k.CE o o o o EE C/) <5.

  • 6
  • 3 .

O b 5'C o o o o CF)

Q .O b

Q C

  • p .G

-*O. o o M M

m. 8 l

i O o l

. $m n '

i~ e

' T C Q

e

.1 o o w -

'c N

i b M.4 C

C m m t c m o

O 3 O D U 6 Q. g C M D Q ~

h C

_O c o C C. O 4

F E. O O

' W e e E E

w c M W C

h e c" .

c e r -

O c o C c:.

[ h p

=

1 i

i t a

i 1

)

i i

i  !

4 ATTACHMENT 2 l Umerick Generating Station Units 1 and 2  !

Fitness-for-Duty Performance Data  !

July 1996 through December 1996 l i

p

?

i

r Attachment 2 Summary of Data Analysis and Management Actions Limerick Generating Station July- December 1996

1. Initiatives Taken The following summarizes the results of sweeps conducted during the period by PECO Energy  !

Company's drug sniffing canine teams as well as investigations and interviews used to confirm information about illicit activities at Limerick Generating Station (LGS).

a. July 23,1996 - General team sweep of the Site Management Building. Results: Two (2) activations. No drugs found or forensic samples taken.
b. August 8,1996 - Routine search by Site Security of vehicle attempting to enter the Protected Area revealed alcoholic beverages present in the vehicle. Driver and passenger submitted to for cause testing. Driver of vehicle tested positive for illegal substances. Access denied the two contractor employees.
c. August 28,1996 - For cause search (no dog used) of contractor employee's private vehicle based upon positive alcohol test. Results: No alcohol or drugs found.

Subsequent Security interview confirmed that the contractor employee had consumed significant quantity of alcohol prior to scheduled work. Access denied.

d. September 5,1996 - For cause search (no dog used) of contractor employee's private vehicle based upon the contractor employees attempt to bring alcohol into the Protected Area. Results: No additional alcohol or drugs found. Contractor employee suspended, disciplined by employer. Unescorted access subsequently reinstated.
e. September 18,1996 - Unidentified white powdery substance found inside the Protected Area. Subsequent laboratory analysis determined that the substance was a non-controlled /non-prescription substance,
f. October 2,1996 - General team sweep of Occupational Health and Safety area in the Personnel Processing Center. Results: No activations.
g. November 12,1996 - General team sweep of the Training Center. Results: Two (2) activations. No drugs found or forensic samples taken.
h. November 20,1996 - Security investigation initiated into allegations regarding the arrest and drug use of an employee. The employee's unescorted access was sucpended for failing to report the arrest. The employee was disciplined. Unescorted access was subsequently reinstated.
i. November 27,1996 - For cause search (no dog used) of contractor employee's vehicle based upon credible information that alcohol containers were in the vehicle. Results:

Numerous alcohol containers were found and confiscated. The contractor employee's unescorted access was suspended. The contractor was disciplined by his employer. Unescorted access was subsequently reinstated.

J. December 15,1996 - Hypodermic needle found inside the Protected Area. Subsequent laboratory analysis indicated a non-controlled substance.

k. December 17,1996- General team sweep of the Personnel Processing Center.

Results: One (1) activation. No drugs found or forensic samples taken.

1

. . , c.

r  :

i II. Manaaement Actions During the period, five (3) contractor employees (i.e., two pre-access, one random, one for cause, and one follow up) tested positive at LGS. Unescorted access was denied the five (5) ,

contractor employees.

j lil. Events Repoded Under 10 CFR 26.73 ,

i i During the period there were no significant FFD events reported by telephone under 10 CFR 26.73 by LGS.

IV. Audits / Inspections '

During the period, an assessment to evaluate implementation of the Fitness-For-Duty (FFD)

Program was conducted by Nuclear Quality Assurance Division personnel. The assessment found that PECO Energy's FFD program is being effectively implemented in accordance with i 10CFR Part 26. Strengths were identified in the areas of site collection and testing, alcohol -

testing, and overall program administration.

Three (3) Corrective Action Requests (CARS) were identified, as follows:

1. CAR - The HHS-certified laboratory's Standard Operating Procedure (SOP) did not include current data to suppoit the limit of detection and limit of quantification for the 6-MAM (6-AM) procedure. The SOP for the THC immunoassay did not identify the reagent manufacturer and acceptance criteria.
2. CAR - Reagent bottles on the HHS-certified laboratory's immunoassay instruments did not reflect the proper reagent lot number. The SOP did not specify that the bottles are cleaned when changing lots.
3. CAR - Three (3) contractor FFD collection site personnel were not properiy designated for 3 inclusion in the random testing pool.  !

l The HHS-certified laboratory has corrected the deficiencies noted. The procedure for identifying l FFD personnel and including them in the random testing pool has been reviewed. Periodic I reviews of contractor personnel engaged as FFD personnel will be completed to ensure proper identification.

It was also recommended that the HHS-certified laboratory lower the screening cutoff level for THC to improve the positive confirmation rate; that separate daily maintenance record forms be used for each immunoassay instrument used for on-site testing; that the alcohol calibration check record should be updated; and that a lockable box for control of donor personal effects be provided at collection sites. ,

l The recommendations have been considered. '

V. . Random Testina Rate PECO Energy maintains separate testing ' pools" for employees and contractors. Random testing is conducled at an annualized rate of 50%. The " average number with unescorted access" includes personnel granted unescorted access at both PBAPS and LGS.

o VI. Additional information Actions Taken based upon Unconfirmed On-site Screenina PECO Energy has decided to temporarily suspend access for individuals as permitted by 10 CFR 26.24(d).

During the previous 6-month reporting period, (i.e., January - June 1996),100 percent of the 1 specimens which were presumptive positive for cocaine as a result of preliminary on-site screening tests were subsequently reported as positive by the HHS-certified laboratory. The confirmation rate for marijuana was 75%

During the reporting period July - December 1996, four (4) specimens were identified as .

presumptive positive for cocaine as a result of on-site screening. All four (4) of those specimens -  ;

were screened positive and reported as confirmed positive by the HHS-centified laboratory. The  ;

MRO verified the four (4) specimens as positive following discussion with the individuals. Two (2) of those four (4) specimens were collected from an Individual with unescorted access. The i individual was temporarily suspended and subsequently denied unescorted access upon l confirmation and verification by the MRO.

l During the reporting period July - December 1996, three (3) specimens were identified as presumptive positive for marijuana as a result of on-site screening. One (1) of those specimens screened positive and was reported as confirmed positive by the HHS-certified laboratory. The MRO verified the specimen as positive following discussion with the individual. The specimen was collected from an individual seeking unescorted access. The individuals request for -

unescorted access was held in abeyance and subsequently denied upon confirmation and  !

verification by the MRO.

Reduced Manluana Cut-off Level  ;

During the period, one (1) specimen confirmed positive for marijuana at LGS. It is estimated that  ;

the specimen would have tested positive using the 100 ng/ml immunoassay cut-off level.

i I

e l

l l

i l

ATTACHMENT 3 i Corporate and Nuclear Group (PECO Nuclear) Headquarters  !

Fitness-for-Duty Performance Data July 1996 through December 1996 i

i l

I l

I l

l l

t Attachment 3 Summary of Data Analysis and Management Actions Corporate and Nuclear Group (PECO Nuclear) Headquarters July-December 1996

1. Initiatives Taken No sweeps were conducted during the period by PECO Energy Company's drug sniffing canine teams at the Corporate or Nuclear Group (PECO Nuclear) Headquarters.
11. Manaoement Actions There were no positive tests reported during the period.

Ill. Events Reported Under 10 CFR 26.73 There were no events reported during the period.

IV. Audits / inspections During the period, an assessment to evaluate implementation of the Fitness-For-Duty (FFD)

Program was conducted by Nuclear Quality Assurance Division personnel. The assessment found that PECO Energy's FFD program is being effectively implemented in accordance with 10CFR Part 26. Strengths were identified in the areas of site collection and testing, alcohol testing, and overall program administration.

Three Corrective Action Requests (CARS) were identified, as follows:

1. CAR -The HHS-certified laboratory's Standard Operating Procedure (SOP) did not include current data to support the limit of detection and limit of quantification for the 6-MAM (6-AM) procedure. The SOP for the THC immunoassay did not identify the reagent manufacturer and acceptance criteria.
2. CAR - Reagent bottles on the HHS-certified laboratory's immunoassay instruments did not reflect the proper reagent lot number. The SOP did not specify that the bottles are cleaned when changing lots.
3. CAR -Three (3) contractor FFD collection site personnel were not properly designated for inclusion in the random testing pool.

The HHS-certified laboratory has corrected the deficiencies noted. The procedure for identifying FFD personnel and including them in the random testing pool has been reviewed. Periodic reviews of contractor personnel engaged as FFD personnel will be completed to ensure proper identification, it was also recommended that the HHS-certified laboratory lower the screening cutoff level for THC to improve the positive confirmation rate; that separate daily maintenance record forms be used for each immunoassay instrument used for on-site testing; that the alcohol calibration check record should be updated; and that a lockable box for control of donor personal effects be provided at collection sites.

The recommendations have been considered.

Y .

Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 i

PECO ENERGY COMPANY DECEMBER 31, 1996 Comcany 6 2nes Endng CORPORATE AND NUCLEAR GROUP HEADQUARTERS Locuen DAVID M. SARLEY (215) 841-5703 Contac: Name Phone 0nctuoe area coce)

Cutoff s: Screen / Confirmation (ng/ml) Q Appendix A to 10CFR 26 Marijuana 50 / 15 Amphetamines 1000 / 500 /

Cocaine 300 / 150 Phencyclidine l 25 1 25 / l l

Opiates 300 / 300 0.04 '

Alcohol (% BAC) /

i Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel  !

Average Number we,r Unescorted Access 2260 1476 Categories Tested Positive Tested Positive Tested Positive l

Pre-Acces: l 16 0 1 0 l k Post accident 2 0 0 0 9

h Obsened behavior 0 0 0 0 Random 64 1

0 19 0 l l

l

' I Follow up 12 0 i

0 0 Other 0 0 P

2 0 l

Total 94 0 22 0 REV.1/92

L l -

< t**

  • t o .*

b e

e I

i i Y l

I i

{

l C4 C

s,n "?c.,

  1. h C

o o o o C. ~o

~o E I:

G o U S o o o o C <

C Z

eC.*

D' Cb* *

@ c.

f j e o o o U

C en em O

o rc a 'c C. E5 C C C C CO <5 '

u '

O e u.

a .

I E m C.

o o o o o O b

c o

> .5

  • n g o 8 e o e o e

% n

= 5 o .=_

G f O O o o L 2 l C l C l C $ $

o i

U m o

o U u w o n n C * - '

S c C p a o o o

- E o I

e ' E E

- e - -

U C C

- m H. H.

C C o t- -

Q C C o 5o u o a -

g a a m

. __ . - _ _ . . - . - - . . ~

d V. Random Testina Rate PECO Energy maintains separate testing " Pools" for employees and contractors. Random testing is conducted at an annualized rate of 50%. The " average number with unescorted access" includes personnel granted unescorted access at both PILAPS and LGS.

VI. Additionalinformation Actions Taken based upon Unconfirmed On-site Screenino Specimens collected at the Corporate and Nuclear Group (PECO Nuclear) Headquarters are forwarded directly to the HHS-certified laboratory for testing. On-site screening is not conducted.

Reduced Mariluana Cut-off Level There were no confirmed positive tests for marijuana during the period.

i i

1 1

i 1

1 l

l