Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1
ML20116J390
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/30/1996
From: Shannon Rogers
GEORGIA POWER CO.
To:
Shared Package
ML20116J354 List:
References
NUDOCS 9608130177
Download: ML20116J390 (2)


Text

.

4 Enclosure 3 i Revised Page El-2 for Plant Hatch Unit 1 Monthly Operating Report Anril 1996 l

] NOTE: The attached page is being revised as a result of an error in calculation of several parameters due to the use of Central Standard Time (CST)

rather than Eastern Standard Time (EST).

i 4

t 4

a i

e f

t 9608130177 960809 PDR ADOCK 05000321 R pop HL-5218

l .

1 .

6 OPERATING DATA REPORT DOCKET NO.: 50-321 l DATE: MAY 3,1996 COMPLETED BY: S. 8. ROGERS l OPERATING STATUS

1. UNIT NAME: E. I. HATCH - UNIT ONE
2. REPORT PERIOD: APRIL 1996
3. LICENSED THERMAL POWER (MWt : 2436
4. NAMEPLATE RATING (GROSS MWe : 850
5. DESIGN ELECTRICAL RATING IN MWe : 776.3 j 789
6. MAXIMUM DEPENDABLE CAPACI'IY GROS We):
7. MAXIMUM DEPENDABLE CAPACITY NET We 756 i 8. IF CHANGES OCCUR IN CAPACITY RATINGS):

1 ITEMS 3 THROUGH 7 SINCE LAST REPORT, GIVE REASONS: NO CHANGES

9. ER LEVEL TO WHI H RESTRICTED, IF ANY (NET We): NO RESTRICTIONS

! 10. REASONS FOR RESTRICTION, IF ANY: N/A

~

THIS MONTH YEAR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD: 719.0 2903 178222
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 55.6 1979.0 136380.5
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 2
14. HOURS GENERATOR ON LINE: 0.0 1882.3 131142.4 3
15. UNIT P.ESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS MERMAL ENERGY GENERATED (MWHt): 9201 3913084 295721850
17. GROSS Ell:CTRICAL ENERGY GENERATED (MWHe): 0 1236382 95108714 i
18. NET FLECTRICAL ENERGY GENERATED (MWHe): -6788 1162899 90526439
19. UNIT SERVICE FACTOR: 0.0% G4.8% 73.6%
20. UNIT AVAILABILITY FACTOR: 0.0% 64.8% 73.6%

21.UNITCAPACITYFACTOR(USINGMDCNET: 0.0% 53.0% 67.8%

22. UNIT CAPACITY FACTOR i USING DER NET : 0.0% 51.6% 65.2%
23. UNIT FORCED OUTAGE RA'IE: 100.0% 5.2% 10.6%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE AND DURATION OF EACH): N/A 25.IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOF,STARTUP:

Generator was tied to line May 2, 1996.  !

26. UNITS IN TEST STATUS (PRIOR TO COMERCIAL OPERATION): N/A i

l l

El-2