Responds to NRC 810722 Ltr Re Violations Noted in IE Insp Rept 50-293/81-08.Corrective Actions:Semiannual Review of Outstanding Maint Requests Will Be Addressed as Permanent Requirement
ML20010B904
Person / Time
Site: Pilgrim
Issue date: 07/28/1981
From: Morisi A
BOSTON EDISON CO.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20010B903 List:
References
81-178, NUDOCS 8108180456
Download: ML20010B904 (2)


Text

.. .

BOSTON EDISON COMPANY DENERAL OFFIcts 500 EOvLETON ETREET ED ETON MassACH USETTE O219 9 A. V. M O Ris t MANAGER NUCLEAR OPERATIONS EUPr* ORT DEPARTMENT July 28,1981 BECo' Ltr. #81-178 Mr. Eldon J. Brunner, Chief Projects Branch #1 Division of ,esident & Project Inspection U.S. Nut . ear Regulatory Commission

~

631 Park Avenue King of Prussia, PA. 19406 License No. DPR-35 Docket No. 50-293 Supplemental Response to IE Inspection 81-08 Ref: (1) IE letter dated June 2,1981; IE Inspection 81-08 (2) BECo Response letter, dated June 25, 1981 (BECo Ltr. #2.81.151)

(3) IE letter dated July 22, 1981; Request for additional information (BECo. Ltr. #1.81.207)

Dear Sir:

i In Ref. (3) you requested further information concerning Ref. (2). The following are Boston Edison's responses to that request.

l Request:

L With respect to your response to Item A, we note that you make no reference to including the requirements for performing a semi-annual review of all mainten-l ance requests and an inspection of all red tags at the station in your station l procedures.

l

Response

The proposed semi-annual review of outstanding maintenance requests, and inspection of all red tags at the station shall be procedurally addressed as a permanent re-quirement by September 1,1981.

Request:

With respect to your response to Item C, we note that you have not described the corrective actions taken and results achieved for this specific violation, although you do discuss corrective steps to avoid further violations.

8108100456 010811 ~

PDR ADOCK 05000293 G PDR

7

^*

  • o, *

~ 50 TON EDCON COMPANY ,

Mr. Eldon J. Brunner, Chief July 28,~.1981 Page 2-

Response

A formal ~~ safety evaluation of the referenced modifications to the Instrument Air and Service Air Systems has been performed. = This evaluation concluded that the modifications a'o not constitute an unreviewed safety question.

. We believe that this supplemental information is satisfactory. However,' shoul d
. -you have further questions concerning these responses, please do not hesitate to contact'us.

i Very truly yours, i