Advises That Commitment to Complete Enhancements of Control Panels as Part of Dcrdr,Per NUREG-0737,Item I.D.1 by Oct 1989 Not Met.All Three Panels at Simulator Enhanced & Installation of Revised Meter Scales in Progress
ML20005G806
Person / Time
Site: Pilgrim
Issue date: 01/11/1990
From: Bird R
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.D.1, TASK-TM BECO-90-008, BECO-90-8, NUDOCS 9001230114
Download: ML20005G806 (2)


Text

h4 , y b NUREG-0737, Item 1.D.1 4

MM

,. Pdgrim Nuclear Power Station I Rocky Hill Road Plymouth, Massachusetts 02360 Ralph G. Bird Serer Vice President - Nuclear BECo 90- 008 January 11, 1990

U.S. Nuclear Regulatory Commission Document Control Desk Hashington, DC. 20555 License DPR-35 Docket 50-293 NUREG-0737. ITEM 1.D.1: DETAILED CONTROL ROOM DESIGN REVIEW L

Boston Edison Company (BECo) described its approach te enhancing control panels as part of our Detailed Control Room Design Review (DCRDR) in our letter of July 6, 1989. The July 6, 1989 letter also committed to complete the enhancements on three (3) of the control panels by the end of the October, 1989 outape.

The enhancements were not completed by the October 1989 date. As work on the enhanr.emer.tv progressed the scope of work bera.me defined as too large to be completed by the end of the October 1989 outage. In particular, revising plant procedures to reflect the panel enhancements is a much larger tat.k than originally estimated.

The panel enhancements effort is continuing. For example, all three panels at 4 the Pilgrim simulator have been enhanced, the installation of revised meter '

scales is in progress and will continuo, and the design work for removing  ;

abandoned equipment is complete. Our original commitment to complete the  ;

overall enhancements program (as described in our letter of May 2,1989) has not changed and is included in our Long Term Plan.

.44 ---

. G. Bird PMK/amm/3783 Ob 90o1230114 900111 1, DR ADOCK 0500 3 g 1

1 L

8  :

~ , , , .

BOSTON EDISON COMPANY i January 11, 1990 l U. S. Nuclear Regulatory Commission j Page Two cc: Mr. D. Mcdonald, Project Manager )

Division of Reactor Projects - I/II '

Office of Nuclear Reactor Regulation Mail Stop: 14D1 '

U. S. Nuclear Regulatory Commission 1 White Flint North  ;

11555 Rockville Pike

, Rockville, MD 02852 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station '

[

t

. .