|
---|
Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML21126A3032021-05-10010 May 2021 Entergy Operations, Inc. Pre-Submittal Meeting - Grand Gulf Nuclear Station, Unit 1 Relief Request to Adopt Performance-based Testing for Pressure Isolation Valves (Pivs) ML20357B0592020-12-16016 December 2020 Enc 2 - Grand Gulf Nuclear Station Regulatory Conference December 2020 - NRC Presentation ML20357B0612020-12-16016 December 2020 Enc 3 - Entergy Slides for Regulatory Conference December 2020 - Final ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML19122A4202019-05-0202 May 2019 Summary of Public Meeting with Entergy Operations, Inc ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML17283A4122017-10-10010 October 2017 Grand Gulf Nuclear Station, Unit 1 - Meeting Slides - October 10, 2017 Pre-Application Meeting with Grand Gulf Concerning Tornado Missile Risk Evaluator Submittal ML13199A3502013-07-16016 July 2013 Predecisional Enforcement Conference Presentation Slides July 16, 2013 ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML1203401902012-01-30030 January 2012 (Non- Proprietary) Licensee Slides from 1/30/12 Meeting with Entergy Operations, Inc ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1109600692011-04-0505 April 2011 Licensee Slides from 4/5/11 Pre-Submittal Meeting with Entergy Operations, Inc. Regarding Changes to TSs and QA Program Manual for Unit Staff Qualifications ML1003603572010-02-18018 February 2010 Steam Dryer 2/18/10 NRC Presentation, Redacted Version ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0932102002009-11-12012 November 2009 Licensee Slides, Extended Power Uprate - Impact on Steam Dryer ML0921003112009-07-29029 July 2009 Presentation Slides, SFST June 2009 Monthly Seminar - Operational Experience. ML0909100632009-03-31031 March 2009 Entergy Operations, Inc., Project Planning Slides for March 31, 2009, Nrc/Entergy Pre-Application Meeting - Power Uprates ML0712005272007-04-30030 April 2007 Nrc/Entergy Operations, Inc. Management Meeting to Discuss the Performance of Arkansas Nuclear One, Cooper, Grand Gulf, River Bend and Waterford, Unit 3 ML0634500682006-12-0505 December 2006 12/5/06 Public Meeting Handout from Entergy/Epri Re GGNS Application of N-716 ML0613103512006-05-11011 May 2006 Summary of Meeting with Entergy Operations, Inc., Annual Performance Assessment for Grand Gulf Nuclear Station ML0510203182005-05-0404 May 2005 Licensee'S Slides for 04/11/2005 Summary of Category 1 Meeting with Entergy Corporation, to Discuss an Alternate Compliance Strategy for Meeting Fire Wrap Requirements in Certain Plant Areas ML0418202762004-06-30030 June 2004 Summary of Meeting with Entergy Operations, Inc Re Initial Examination and Requalification Program Improvements ML0324717142003-09-0202 September 2003 Meeting with Entergy Nuclear Potomac Plans for NRC to Conduct Inspections of Quality Assurance Measures in Support of Prospective ESP Application for Grand Gulf Site ML0323705292003-08-22022 August 2003 Summary of Nrc/Entergy Operations, Inc. Management Meeting ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary 2023-12-14
[Table view] Category:Meeting Summary
MONTHYEARML23193A8412023-07-17017 July 2023 Summary of Entergy Operations, Inc. Regulatory Conference: GGNS, Calibration Failures of Drywell/Containment High Range Radiation Monitors Resulting in White Finding July 6, 2023 ML23125A0752023-05-0808 May 2023 May 3, 2023, Summary of Public Meeting with Entergy Operations, Inc., to Discuss Planned Submittals of 10 CFR 50.69 and TSTF-505 for Grand Gulf Nuclear Station, Unit 1 ML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22167A0882022-06-24024 June 2022 Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21285A1352021-10-13013 October 2021 Summary of Regulatory Performance Meeting with Entergy Operations, Inc. to Discuss the Results of the Nrc'S Supplemental 95002 Inspection of Grand Gulf Nuclear Station ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21131A0042021-05-11011 May 2021 May 10, 2021, Summary of Public Meeting with Entergy Operations, Incorporated to Discuss Upcoming Relief Request to Adopt Performance-Based Testing for Pressure Isolation Valves for Grand Gulf Nuclear Station, Unit 1 ML21092A1542021-04-0202 April 2021 GG 2020 EOC Public Meeting Summary of Public Meeting with Entergy Operations, Inc ML20353A4372020-12-18018 December 2020 Regulatory Conference Summary, December 10, 2020 ML20218A7512020-08-0707 August 2020 Summary of June 25, 2020 Teleconference with Grand Gulf Nuclear Station ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19122A4202019-05-0202 May 2019 Summary of Public Meeting with Entergy Operations, Inc ML18094A2632018-08-17017 August 2018 Summary of 01/18/2018, Public Meeting with Nuclear Energy Institute, Duke Energy, Southern Nuclear Operating Co., Entergy Operations, Inc. to Discuss Development of Tornado Missile Risk Evaluator Methodology ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18092A4422018-03-28028 March 2018 Summary of Public Meeting with Entergy Operations, Inc. Regarding Results of the Annual Assessment of Safety Performance at Grand Gulf Nuclear Station ML17353A1542017-12-22022 December 2017 Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060) ML17340A0612017-12-0808 December 2017 11/8/17 Summary of Teleconference with Entergy Operations, Inc., Tornado Missile Risk Evaluator with Applicability to Submittals from Duke Energy and Southern Nuclear Operating Co, Inc. ML17244A0742017-09-28028 September 2017 8/17/2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17257A0992017-09-26026 September 2017 Summary of Public Meeting with Nuclear Energy Institute and Licensees to Discuss the Tornado Missile Risk Evaluation Tool for Grand Gulf, Shearon Harris, and Vogtle, Units 1 and 2 ML17101A4402017-04-11011 April 2017 Summary of Public Meeting with Entergy Operations, Inc. to Discuss Results of the Annual Assessment of Safety Performance at Grand Gulf Nuclear Station for 2016 ML16280A5062016-10-19019 October 2016 Summary of Teleconference Held on September 28, 2016, Between the NRC and Entergy Co. Concerning Containment Leak Rate Program Pertaining to the Grand Gulf Nuclear Station Unit 1 ML16286A6222016-10-14014 October 2016 Report on the Safety Aspects of the License Renewal Application of the Grand Gulf Nuclear Station, Unit 1 ML16179A3852016-06-27027 June 2016 U.S. Nuclear Regulatory Commission Public Meeting Summary - Open House Meeting with Members of the Public - Grand Gulf Nuclear Station ML15355A0342016-01-12012 January 2016 12/8/2015 Summary of Teleconference for GGNS Set 53 RAI Responses ML15215A0412015-10-14014 October 2015 Summary of Conference Call for GGNS Fire Water System RAI Responses ML14258A1452015-02-19019 February 2015 August 21, 2014, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning RAI Set 51 for the Grand Gulf, Unit 1, License Renewal Application ML14184B1832014-07-10010 July 2014 Summary of Telephone Conference Call Held on June 18, 2014, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Draft RAI 3.0.5-1E (Operating Experience Follow-Up) for the Grand Gulf, Unit 1, License Rene ML14156A3782014-06-25025 June 2014 Summary of Meeting Between Representatives of the Nuclear Regulatory Commission and Entergy Operations Inc. to Discuss Flooding Analysis Associated with Grand Gulf Nuclear Station Unit 1 ML14043A1102014-02-28028 February 2014 01/29/2014 Summary of Public Meetings to Discuss Draft Supplement 50 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Grand Gulf, Unit 1, (TAC Nos ME7385 and ME7386) ML13064A0582013-04-0303 April 2013 Summary of Telephone Conference Call Held on February 19, 2013, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, Licens ML12338A6502013-01-14014 January 2013 LRA RAI Telecon 2012-10-26 ML12334A3472013-01-0303 January 2013 Summary of Telephone Conference Call Held on September 28, 2012, Between the NRC and Entergy, Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA ML12264A6492012-11-15015 November 2012 Summary of Telephone Conference Call Held on August 29, 2012, Between the NRC and Entergy, Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA ML12271A2522012-11-0909 November 2012 Summary of Telephone Conference Call Held on 08/22/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12264A3872012-10-31031 October 2012 Summary of Telephone Conference Call Held on 8/21/12, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12250A1052012-10-31031 October 2012 Summary of Telephone Conference Call Held on 8/15/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML12214A5482012-09-14014 September 2012 7/18/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12209A1482012-08-28028 August 2012 6/8/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12201B5452012-08-28028 August 2012 Summary of Telephone Conference Call Held on 6/5/12, Between NRC and Entergy, Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA ML12240A4162012-08-27027 August 2012 Public Meeting with Entergy Operations, Inc to Discuss the Performance of the Subject Facilities and Current Regulatory Issues ML12193A0712012-08-15015 August 2012 Summary of Telephone Conference Call Held on 5/15/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12201B5042012-08-15015 August 2012 Summary of Telephone Conference Call Held on 5/23/12 Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning the RAIs Pertaining to the Grand Gulf Nuclear Station License Renewal Application ML12202A2142012-08-15015 August 2012 5/30/12 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc., Concerning Requests for Additional Information Pertaining to the Grand Gulf Nuclear Station, LRA ML12180A5412012-07-17017 July 2012 Summary of Telephone Conference Call Held on March 14, 2012, Between NRC and Entergy Operations, Inc., Concerning RAI Pertaining to the Grand Gulf Nuclear Station, LRA 2023-07-17
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML22301A1412022-10-27027 October 2022 Overview of 10 CFR Part 21- Tim Steadham SRI Region IV ML22164A8012022-06-13013 June 2022 Entergy Fleet (GGNS, RBS, and WF-3) - Code Case N-752 RR 6-14-22 Pre-Submittal Public Meeting Presentation Slides ML21319A2452021-11-15015 November 2021 Natrium Energy Island Decoupling Strategy - 11-17-2021 ML21306A3162021-11-0909 November 2021 Digital IC Presentation 11/09/2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21280A0282021-10-0404 October 2021 GG - NRC Slides for the October 4, 2021 Regulatory Performance Meeting and 95002 Supplemental Inspection Exit Meeting ML21280A0322021-10-0404 October 2021 GG - Entergy Presentation Slides for the October 4, 2021 Regulatory Performance Meeting and 95002 Supplemental Inspection Exit Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML21126A3032021-05-10010 May 2021 Entergy Operations, Inc. Pre-Submittal Meeting - Grand Gulf Nuclear Station, Unit 1 Relief Request to Adopt Performance-based Testing for Pressure Isolation Valves (Pivs) ML21092A1542021-04-0202 April 2021 GG 2020 EOC Public Meeting Summary of Public Meeting with Entergy Operations, Inc ML20357B0612020-12-16016 December 2020 Enc 3 - Entergy Slides for Regulatory Conference December 2020 - Final ML20357B0592020-12-16016 December 2020 Enc 2 - Grand Gulf Nuclear Station Regulatory Conference December 2020 - NRC Presentation ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20176A3452020-06-24024 June 2020 Slides for Public Meeting Confirmatory Success Criteria Using Grand Gulf Nuclear Station ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17318A1592017-11-0808 November 2017 Meeting Slides - November 8, 2017 Teleconference with NEI Concerning Feedback on Tornado Missile Risk Evaluator Methodology -Final ML17101A4402017-04-11011 April 2017 Summary of Public Meeting with Entergy Operations, Inc. to Discuss Results of the Annual Assessment of Safety Performance at Grand Gulf Nuclear Station for 2016 ML14142A0412014-05-22022 May 2014 NRC Public Meeting Presentation Grand Gulf Flooding Hazard Reevaluation ML13199A3502013-07-16016 July 2013 Predecisional Enforcement Conference Presentation Slides July 16, 2013 ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML12034A0172012-01-31031 January 2012 License Renewal Process and Environmental Scoping Meeting ML1109600692011-04-0505 April 2011 Licensee Slides from 4/5/11 Pre-Submittal Meeting with Entergy Operations, Inc. Regarding Changes to TSs and QA Program Manual for Unit Staff Qualifications ML1003603572010-02-18018 February 2010 Steam Dryer 2/18/10 NRC Presentation, Redacted Version ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0932102002009-11-12012 November 2009 Licensee Slides, Extended Power Uprate - Impact on Steam Dryer ML0921003112009-07-29029 July 2009 Presentation Slides, SFST June 2009 Monthly Seminar - Operational Experience. ML0909100632009-03-31031 March 2009 Entergy Operations, Inc., Project Planning Slides for March 31, 2009, Nrc/Entergy Pre-Application Meeting - Power Uprates ML0634500682006-12-0505 December 2006 12/5/06 Public Meeting Handout from Entergy/Epri Re GGNS Application of N-716 ML0613103512006-05-11011 May 2006 Summary of Meeting with Entergy Operations, Inc., Annual Performance Assessment for Grand Gulf Nuclear Station ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0615902322006-03-0707 March 2006 2006/03/07- - RIC 2006 Presentation - T1F - Garry G. Young - License Renewal ML0615901582006-03-0707 March 2006 03/07/2006 - RIC 2006 Presentation - T1E - John F. Mccann - License Renewal ML0607204302006-03-0101 March 2006 March 1, 2006 Public Meeting Slides for Proposed Generic Letter Post-Fire Safe-Shutdown Circuit Analysis Spurious Actuations. ML0532206852005-11-17017 November 2005 Nrc/Entergy Operations, Inc. Management Meeting 11/10/05 ML0514701102005-05-25025 May 2005 Summary of End of Cycle Public Meeting with Entergy Operations, Inc. on Grand Gulf Nuclear Station Performance for Period of 01/01/2004 - 12/31/2004 ML0510203182005-05-0404 May 2005 Licensee'S Slides for 04/11/2005 Summary of Category 1 Meeting with Entergy Corporation, to Discuss an Alternate Compliance Strategy for Meeting Fire Wrap Requirements in Certain Plant Areas ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0323705292003-08-22022 August 2003 Summary of Nrc/Entergy Operations, Inc. Management Meeting ML0316400872003-04-28028 April 2003 Summary of Annual Performance Assessment Meeting for Grand Gulf Nuclear Station ML0210903352002-04-17017 April 2002 Annual Performance Assessment Meeting for Grand Gulf to Discuss Safety Performance at Grand Gulf Between 04/01/2001 & 12/31/2001 2023-12-14
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 May 11, 2 0 0 6 George A. Williams, Site Vice President Grand Gulf Nuclear Station Entergy Operations, Inc.
P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
SUMMARY
OF ANNUAL PERFORMANCE ASSESSMENT MEETING FOR GRAND GULF NUCLEAR STATION
Dear Mr. Williams:
This refers to the meeting conducted in Port Gibson, Mississippi, on May 9, 2006, to discuss the safety performance at Grand Gulf Nuclear Station between January 1 and December 31,2005.
Topics discussed during the meeting included the Reactor Oversight Process and the safety performance at Grand Gulf Nuclear Station. Members of the public present at the meeting were allowed to ask questions and comment on the proceedings.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at httD://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely, kriss M. Kennedy, Chief /
Project Branch C Division of Reactor Projects Docket: 50-416 License: NPF-29
Entergy Operations, Inc.
Enclosures:
- 1. Attendance List
- 2. Presentation Slides cc w/enclosures:
Senior Vice President Governor Haley Barbour and Chief Operating Officer Office of the Governor Entergy Operations, lnc. State of Mississippi P.O. Box 31995 P.O. Box 139 Jackson, MS 39286-1995 Jackson, MS 39205 Wise, Carter, Child & Caraway Jim Hood, Attorney General P.O. Box 651 State of Mississippi Jackson, MS 39205 P.O. Box 220 Jackson, MS 39225 Winston & Strawn LLP 1700 K Street, N.W. Dr. Brian W. Amy Washington, DC 20006-3817 State Health Officer State Board of Health Jay Barkley, Chief P.O. Box 1700 Energy & Transportation Branch Jackson, MS 39215 Environmental Compliance and Enforcement Division Robert W. Goff, Program Director Mississippi Department of Division of Radiological Health Environmental Quality Mississippi Dept. of Health P.O. Box 10385 P.O. Box 1700 Jackson, MS 39289-0385 Jackson, MS 39215-1700 President, District 1 Director Claiborne County Board of Supervisors Nuclear Safety & Licensing P.O. Box 339 Entergy Operations, Inc.
Port Gibson, MS 39150 1340 Echelon Parkway Jackson, MS 39213-8298 General Manager Grand Gulf Nuclear Station Director, Nuclear Safety Entergy Operations, Inc. and Regulatory Affairs P.O. Box 756 Entergy Operations, Inc.
Port Gibson, MS 39150 P.O. Box 756 Port Gibson, MS 39150 The Honorable Charles C. Foti, Jr.
Attorney General Richard Penrod, Senior Environmental Department of Justice Scientist State of Louisiana Office of Environmental Services P.O. Box 94005 Northwestern State University Baton Rouge, LA 70804-9005 Russsell Hall, Room 201 Natchitoches, LA 71497
Entergy Operations, Inc. Allen Burks James Gray Supervisor, District 1 Claiborne County Election Commissioner, Claiborne County District #2 2047 Woodvine Road P.O. Box 105 Lorman, MS 39069 Port Gibson, MS 39150 Michael Wells Gary Knight Supervisor, District 2 Claiborne County Election Commissioner, Claiborne County District #3 102 Evergreen Street 116 Willows Lane Port Gibson, MS 39150 Port Gibson, MS 39150 Mott Headley, Jr. Corlean Hughes Supervisor, District 3 Claiborne County Election Commissioner, Claiborne County District #4 1154 Mott Headley Road P.O. Box 161 Port Gibson, MS 39150 Hermanville, MS 39086 Martha Lott, Board Vice President Coney Johnson District 4, Claiborne County Claiborne County Election Commissioner P.O. Box 279 District 5 Port Gibson, MS 39150 5088 Hwy 547 Port Gibson, MS 39150 Charles Shorts, President of Board Supervisor, District 5 The Honorable Amelda Arnold Claiborne County Mayor, Town of Port Gibson 4007 Pine Grove Road P.O. Box 607 Port Gibson, MS 39150 Port Gibson, MS 39150 Diane Davaul Sheriff Frank Davis Claiborne County Tax Claiborne County Assessor/Collector P.O. Box 427 P.O. Box 469 Port Gibson, MS 39150 Port Gibson, MS 39150 Vanessa Waters Roderick Devoual, Director City ,Clerk Port Gibson/Claiborne County P.O. Box 48 Civil Defense Pattison, MS 39144 P.O. Box 558 Port Gibson, MS 39150 Paul W infield City Attorney James Jackson, Sr. 1129 Openwood Street Claiborne County Election Commissioner, Vicksburg, MS 39183 District #1 338 Gordon Station Annex Port Gibson, MS 39150
Entergy Operations, Inc. Eddie Walls, Jr. Phil Bass, Director Ward 1 Office of Pollution Control P.O. Box 239 Department of Environmental Quality Port Gibson, MS 39150 P.O. Box 10385 Jackson, MS 39289 Vera Johnson Ward 2 Federal Emergency Management 605 Greenwood St. Agency, Region IV Port Gibson, MS 39150 ATTN: Kenneth 0. Burris, Jr.
Regional Director Kenneth Davis 3003 Chamblee Tucker Road Ward 3 Atlanta, GA 30341 305 Cedar St.
Port Gibson, MS 39150 Federal Emergency Management Agency ATTN: William E. Peterson Thomas Russum Regional Director Ward 4 Region VI, Federal Center P.O. Box 400 800 North Loop 288 Port Gibson, MS 39150 Denton, TX 76209-3698 Leslie Case The Honorable Edward Brown Ward 5 Mayor, Town of St. Joseph 214 Claremont Drive P.O. Box 217 Port Gibson, MS 39150 St. Joseph, LA 71366 Michael A. White James Paxton Ward 6 Town Attorney 206 Mimosa St. P.O. Box 97 Port Gibson, MS 39150 St. Joseph, LA 71366 The Honorable Haley Barbour Rick Foster, Director Governor, State of Mississippi Tensas Office of Emergency Preparedness P.O. Box 139 P.O. Box 768 Jackson, MS 39205 St. Joseph, LA 71366 Jim Hood, Attorney General A. E. Tindell State of Mississippi Board of Alderpersons P.O. Box 220 District A Jackson, MS 39205 P.O. Box 164 St. Joseph, LA 71366 Robert R. Latham, Jr., Director Mississippi Emergency Jack Grace, Jr.
Management Agency Board of Alderpersons P.O. Box 4501 District B Jackson, MS 39296-4501 P.O. Box 75 St. Joseph, LA 71366
Entergy Operations, Inc. Jimmy S. Clark William Trevillion Board of Alderpersons Tensas Parish Police Jurors District C District 4 P.O. Box 467 HC-61, BOX276 St. Joseph, LA 71366 Waterproof, LA 71375 Theodore Jackson Roderick Dale Webb Board of Alderpersons Tensas Parish Police Jurors District D District 5 P.O. Box 701 P.O. Box 516 St. Joseph, LA 71366 St. Joseph, LA 71366 Dianne Yarrington Roy K. Smith Board of Alderpersons Tensas Parish Police Jurors District E District 6 P.O. Box 782 P.O. Box 539 St. Joseph, LA 71366 Waterproof, LA 71375 Madaline Gibbs Woodrow W. Wiley, Jr., President Town Attorney Tensas Parish Police Jurors 503 Hancock Street District 7 St. Joseph, LA 71366 P.O. Box 33 Waterproof, LA 71375 Erica Turner Municipal Clerk The Honorable Alex Davis P.O. Box 217 Mayor, Town of Newellton St. Joseph, LA 71366 P.O. Box477 Newellton, LA 71357 Emmett Adams Tensas Parish Police Jurors Edwin Britt, Pro Tern District 1 Board of Alderpersons P.O. Box 631 P.O. Box 398 Newellton, LA 71357 Newellton, LA 71357 Danny Clark Clara Bass Tensas Parish Police Jurors Board of Alderpersons District 2 P.O. Box 266 P.O. Box 262 Newellton, LA 71357 Newellton, LA 71357 Billy Mitchell Jane Netterville, Vice President Board of Alderpersons Tensas Parish Police Jurors P.O. Box 632 District 3 Newellton, LA 71357 P.O. BOX125-9 St. Joseph, LA 71366
Entergy Operations, Inc. Kent Morgan Connie McKeel Board of Alderpersons Clerk P.O. Box 684 P.O. Box 139 Newellton, LA 71357 Waterproof, LA 71375 David Delaney The Honorable Kathleen Blanco Board of Alderpersons Governor, State of Louisiana P.O. Box 621 P.O. Box 94004 Newellton, LA 71357 Baton Rouge, LA 70804-9004 Ronda King Administrator City Clerk Department of Environmental Quality P.O. Box 477 P.O. Box 4313 Newellton, LA 71357 Baton Rouge, LA 70821-4313 Mariah Cooper, Mayor Mike Henry Town of Waterproof State Liaison Officer P.O. Box 248 Department of Environmental Quality Waterproof, LA 7 1375-0248 P.O. Box 4313 Baton Rouge, LA 70821-4313 Robert Bethel, Ill Town Council Member Col. Jeff Smith, Acting Assistant Director P.O. Box 135 Louisiana Office of Homeland Security and Waterproof, LA 71375 Emergency Preparedness 7667 Independence Blvd.
Bertha Brown Baton Rouge, LA 70806 Town Council Member P.O. Box 576 Waterproof, LA 71375 Karen Lynn Johnson Town Council Member P.O. Box 44 Waterproof, LA 71375 Herbert Williams Town Council Member P.O. Box 106 Waterproof, LA 71375 Caldwell A. Flood Town Council Member P.O. Box 338 Waterproof, LA 71375
Entergy Operations, Inc.- Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJCI)
Senior Resident Inspector (GBM)
Branch Chief, DRP/C (KMK)
Senior Project Engineer, DRP/C (WCW)
Team Leader, DRP/TSS (RLNl)
RlTS Coordinator (KEG)
SUNS1 Review Completed: vJcd ADAMS: E y e s 0 No Initials: VJCrJ p, Publicly Available Cl Non-Publicly Available 0 Sensitive H Non-Sensitive OFFICIAL RECORD COPY T=Tele phone E=E-mail F=Fax
I N R C UBLIC MEETING ATTENDANCE
/I LlCENSEE/FACI LlTY Entergy Operations, Inc.
Grand Gulf Nuclear Station I DATEKIME May 9,2006,6 p.m. (CST)
LOCAT iON Port Gibson City Hall Port Gibson, MS NAME (PLEASE PRINT) ORGANIZATION R CAlARD BURRLS ZNP6
/
Page of 2
PUBLIC MEETING ATTENDANCE 1 LlCENSEElFAClLlTY Entergy Operations, Inc.
Grand Gulf Nuclear Station I DATEiTIME May 9,2006,6 p.m. (CST)
LOCATION Port Gibson City Halt Port Gibson, MS NAME (PLEASEPRINT) ORGANlZATlON I
I Page 2of _Z
ka W
v 3
0
--I Q) 0 m
z W
u m
aiJ m
a, a, a, $=&
t) c3 s
73 0
0
m m m d) d)
c) 0
$4 m m m
8 d)
$4 d) m m
0 a
m a,
0 8 $4
m m
0 0 EL z 6) h d) 6)
w w 8 kd) 6 6 ccf F1 4 3
8 e
w 6) k 0 .
$z ccf 3 0
a, d) rn F1 s -4 m
Ek d) k Erf 0
CA 6)
F1 d) F1 m 6) d) a 0
&i 3
6) k
+->
F1 d) 6)
L 0
Y
cn 0
d) 1 m G 8
-u a, 0 0 k
- 6) a, *A VI c +
d)
0 I I I I I I I
aF-4 cn 0 k
d) d) 0 u aF-4 cn Ed) h U
03 k
0 cn E
m d) 0 k
eF-4 3 h CF k d) 0 m a m e
1 n
Q)
Q) ih m rl Y A Q) k 0
z z e
8 i CFS Q) k k u
H 2
m VI 0
0 N
Q-4 0
k d) a-G 0
-b-J d) m tc d)
G d) 8 h
0 k ad)
Td a d d)
n m
0 m
00 m
Q) Q)
Q) Q) k k
0
c) d)
E a
6) 0
- 6) =
F:a c, d) a h -a I
-5 4
a, w
8 a,
5 0
d) 3s 4-J
@Is=:
d) 0
k 0 d) d) s=
d)
'0 v3
\