Letter Sequence Request |
|---|
TAC:ME4679, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting
Results
Other: ENOC-11-00021, Entergy Operations, Inc., Entergy Nuclear Operations, Inc., Submittal of Planned Reorganization of Quality Control Reporting Relationship, GNRO-2012/00150, Final Report for Replacement Steam Dryer, GNRO-2017/00039, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages, ML111720830, ML112560396, ML112790370, ML12167A257, ML12167A269, ML12170B091, ML12177A287, ML13108A217, NRC-2012-0105, Environmental Assessment and Finding of No Significant Impact Related Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt
|
MONTHYEARML1010603922010-04-19019 April 2010 Notice of Forthcoming Conference Call with Indiana Michigan Power Company to Discuss the Proposed Responses to Requests for Additional Information Associated with GL 2004-02 for the D. C. Cook Nuclear Plant Project stage: RAI ML1026604002010-08-20020 August 2010 GE-Hitachi Nuclear Energy Americas LLC - Affidavit of Edward Schrull Withholding from Public Disclosure Proprietary Report NEDC-33477P Project stage: Request ML1026603992010-08-31031 August 2010 NEDO-33477, Revision 0, Safety Analysis Report for Grand Gulf Nuclear Station Constant Pressure Power Uprate Project stage: Request ML1026604032010-09-0808 September 2010 License Amendment Request Extended Power Uprate Project stage: Request GNRO-2010/00056, Grid Stability Evaluation2010-09-0808 September 2010 Grid Stability Evaluation Project stage: Request ML1026604072010-09-30030 September 2010 NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Appendix E Through Appendix G Project stage: Request ML1026604062010-09-30030 September 2010 NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Appendix B Through Appendix D Project stage: Request ML1026604012010-09-30030 September 2010 NEDO-33601, Revison 0, Engineering Report Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using Pble Methodology. Cover Through Appendix a Project stage: Request ML1030102002010-11-0909 November 2010 Supplemental Information Needed for Acceptance of License Amendment Request, Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Megawatts Thermal Project stage: Acceptance Review GNRO-2010/00071, Supplemental Information, License Amendment Request, Extended Power Uprate2010-11-18018 November 2010 Supplemental Information, License Amendment Request, Extended Power Uprate Project stage: Supplement GNRO-2010/00073, Supplemental Information License Amendment Request, Extended Power Uprate2010-11-23023 November 2010 Supplemental Information License Amendment Request, Extended Power Uprate Project stage: Supplement ML1034201082010-12-16016 December 2010 Request for Withholding Information from Public Disclosure, 9/7/10 Affidavit Executed by E. Schrull, GEH Re NEDC-33601P Project stage: Withholding Request Acceptance ML1034705862011-01-0505 January 2011 Request for Withholding Information from Public Disclosure, 11/19/10 Affidavit Executed by E. Schrull, GE-Hitachi, Regarding NEDC-33621P Project stage: Withholding Request Acceptance ML1102602812011-01-26026 January 2011 E-mail, Request for Additional Information Instrument and Controls, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1102602872011-01-26026 January 2011 E-mail, Request for Additional Information Fire Protection, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1102701872011-01-27027 January 2011 Request for Additional Information, Emcb Non-Steam Dryer Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1103103902011-01-31031 January 2011 E-mail, Request for Additional Information, Vessels and Internal Integrity Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00005, Core Operating Limits Report Cycle 18 Mid-Cycle Revision2011-02-0808 February 2011 Core Operating Limits Report Cycle 18 Mid-Cycle Revision Project stage: Request ML1103901732011-02-0808 February 2011 Email, Request for Additional Information, Nrr/Dci/Csgb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00007, Request for Additional Information Regarding Extended Power Uprate2011-02-23023 February 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request GNRO-2011/00012, Request for Additional Information Regarding Extended Power Uprate2011-02-23023 February 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request GNRO-2011/00011, Request for Additional Information Regarding Extended Power Uprate2011-02-23023 February 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1105407052011-02-23023 February 2011 E-mail, Request for Additional Information, Nrr/Dirs/Ihpb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1105407122011-02-23023 February 2011 E-mail, Request for Additional Information, Nrr/Dra/Apla Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00013, Request for Additional Information Regarding Extended Power Uprate2011-02-23023 February 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1034200962011-02-25025 February 2011 Request for Withholding Information from Public Disclosure, 8/20/10 Affidavit Executed by E. Schrull, GEH, for NEDC-33477P Project stage: Withholding Request Acceptance ML1106007172011-03-0101 March 2011 Email Request for Additional Information, Round 2, Nrr/Dci/Cvib Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1105504752011-03-0202 March 2011 Request for Additional Information (Redacted), Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00016, Request for Additional Information Regarding Extended Power Uprate2011-03-0909 March 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1107501322011-03-16016 March 2011 Email, Dose Assessment Branch, Request for Additional Information, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1108202242011-03-23023 March 2011 Email, Request for Additional Information, Nrr/Dss/Srxb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1108202272011-03-23023 March 2011 Request for Additional Information, Nrr/Dss/Srxb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00018, Request for Additional Information Regarding Extended Power Uprate2011-03-30030 March 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request GNRO-2011/00021, Response to Request for Additional Information Regarding Extended Power Uprate2011-03-31031 March 2011 Response to Request for Additional Information Regarding Extended Power Uprate Project stage: Response to RAI ML1109401362011-04-0404 April 2011 Email, Request for Additional Information, Nrr/Dci/Csgb Review, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1109502722011-04-0505 April 2011 Email, Request for Additional Information, Nrr/De/Eeeb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1109502812011-04-0505 April 2011 Request for Additional Information, Nrr/De/Eeeb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1110301112011-04-12012 April 2011 Email, Request for Additional Information, Nrr/Dss/Snpb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00024, Response to Request for Additional Information Regarding Extended Power Uprate2011-04-14014 April 2011 Response to Request for Additional Information Regarding Extended Power Uprate Project stage: Response to RAI ML1110401162011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 3/30/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00021 Project stage: Withholding Request Acceptance ML1110401252011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/20/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00013 Project stage: Withholding Request Acceptance ML1110401002011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 3/28/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00018 Project stage: Withholding Request Acceptance ML1110401072011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/17/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00012 Project stage: Withholding Request Acceptance ML1110401132011-04-27027 April 2011 Request for Withholding Information from Public Disclosure, 2/20/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00011 Project stage: Withholding Request Acceptance GNRO-2011/00035, Response to Request for Additional Information Regarding Extended Power Uprate2011-05-0505 May 2011 Response to Request for Additional Information Regarding Extended Power Uprate Project stage: Response to RAI ML1113001562011-05-10010 May 2011 Email, Request for Additional Information, Nrr/Dss/Scvb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI GNRO-2011/00037, Request for Additional Information Regarding Extended Power Uprate2011-05-11011 May 2011 Request for Additional Information Regarding Extended Power Uprate Project stage: Request ML1114002992011-05-20020 May 2011 E-mail, Request for Additional Information, Nrr/Dci/Emcb Review, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI ML1113905252011-05-31031 May 2011 Request for Withholding Information from Public Disclosure, 4/21/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00025 Project stage: Withholding Request Acceptance ML1115204582011-06-0101 June 2011 Email, Request for Additional Information, Nrr/Dra/Aadb Review, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt Project stage: RAI 2011-03-01
[Table View] |
Text
1 GGNS EPU Steam Dryer Review Non-Proprietary Slides January 30, 2012
2 Meeting Objectives
- 1. Review Steam Dryer Safety Basis (Closed) 1.
Replacement Steam Dryer Improvements 2.
Analysis Methodology 3.
Dryer Instrumentation & Power Ascension Testing
- 2. Review Planned RAI Response Approach (Closed)
- 3. Review Schedule
3 Steam Dryer Safety Basis
4 Replacement Steam Dryer Design Improvements
((
))
5
((
))
6 Analysis Conservatism
- End-to-end benchmarking demonstrates load definition & structural FEA methodology have overall conservatism of approximately 25%
- Inherent 100% margin based on applied ASME material strengths
- Analysis & structural design of dryer maintains 2.0 MASR in addition to margins described above
7 Third party review has been conducted by technical experts from LPI
& MPR Independently assessed related GEH Corrective Action Reports Reviewed prior RAI responses and sampling of GGNS analyses & design documentation Third Party Review Focus Areas and GGNS steam dryer design &
qualification is being independently assessed by Expert Panel Expert Panel comprised of:
Dr. Fred Moody - Retired GE. Expert in fluid transients and behavior of structures under fluid loads. National Academy of Engineering member.
Dr. M. K. Au-Yang - Retired Areva. Author of Flow-Induced Vibration of Power and Process Plant Components.
Dr. Peter Griffith - MIT Professor Emeritus. Prior consultant to NRC.
Third Party Expert Review/Oversight
8 Review scope:
Numerous GEH documents including the Grand Gulf dryer submittals, GEH analysis reports, and the RAIs Design and analysis methodology - reviewed interactively with GEH staff Data taken on prior dryers Operating experience, including failures and cracks Design improvements made in the GGNS dryer at previously cracked locations The MSL velocity at GGNS compared to other plants Expert Panel Review
9 The Panel performed a PIRT (Phenomena Identification and Ranking Table) to help focus experience, current understanding, objectives, expert opinion, and actions necessary to complete the review.
The Panel concluded that the new GGNS dryer is stronger at locations where cracks have previously occurred.
Based on a review of the analysis that has been performed by GEH, the Panel concluded the stress margins calculated by the analysis are consistent with the changes that have been made in the hardware.
The Panel continues to review specific data from GEH prior to completion of the review.
Expert Panel Review
10 The preliminary conclusion is that the risk of a dryer structural failure is considered small because:
1)
All known dryer prior cracking experience has been incorporated into strengthening the replacement dryer, 2)
Large conservative margins are included in the current
- analysis, 3)
Important data will be attained during power ascension monitoring of MSL pressures and dryer instrumentation, 4)
The dryer will be inspected following 24 months of operation.
Expert Panel Review
11 Steam Dryer Instrumentation & Test Plan
12 Steam Dryer Instrumentation & Test Plan Vibration Measurement Program Goals
((
))
13 Bases for Sensor Locations
((
))
14 Component Strain Gages Accelerometers Pressure Transducers GGNS RSD Instrumentation Summary
((
))
15 On-Dryer Instrumentation Complexity/Schedule
((
))
16 On-Dryer Instrumentation Sensitivity/Life Span
((
))
17 Power Ascension Test Plan
((
))
18 Planned RAI Response Approach
19 Planned Response Approach - RAI 1 Re-benchmarking and Re-analysis
- Describe how each issue impacting benchmarks, modeling approximations, etc., has been addressed in an adequate manner using acceptable technical approaches
- Provide a quantitative evaluation of the impact of these various modeling approaches and approximations
- Reference use of on-dryer instrumentation to demonstrate analytical conservatism
20 Planned Response Approach - RAIs 2-4
((
))
21 Planned Response Approach - RAIs 5-6
- RAI 5 - Dryer Inspection Plan
- Describe how partial penetration welds will be inspected as part of dryer inspection program
- Describe industry OE does not indicate any concerns or problems associated with partial penetration welds
- Modify SDAR to include discussion of fatigue factors for partial penetration welds
22 Planned Response Approach - RAIs 7-8
- RAI 7 - Assessment of FE Modeling Bias and Uncertainty (SSES Dryer Hammer Test Data)
- RAI 8 - GGNS Steam Dryer Finite Element Model Verification
- Describe the review of the FEM
- Explain how unconnected nodes, mesh quality, and mesh density convergence are evaluated & addressed in the analysis
23 Planned Response Approach - RAI 9 Instrumentation of the Steam Dryer
- Planning to install two strings of on-dryer instrumentation (as described earlier)
- Demonstrate validation of predicted loads using both on-dryer and MSL data during power ascension testing
- Describe how loads determined by MSL data will be compared to dryer pressure measurements
- Predicted strain and acceleration will be compared to measured strain and acceleration
- Bias and uncertainty will be calculated based on a data taken at a minimum of three power plateaus
- Describe calibration methods
- Propose a License Condition for Power Ascension Testing
24 Planned Response Approach - RAIs 10-12
- Remove reference to ESBWR Topical Reports
- Provide GGNS-specific basis
- RAI 11-Repair/Rework of the Replacement Steam Dryer
- Describe the measures utilized to minimize IGSCC potential.
- Confirm procedures implement BWRVIP guidance.
- RAI 12 - Analysis vs. Operating Dryer Cracking Experience
- Summarize root cause of SSES cracking
- Describe the impact on the GGNS model and dryer design
- Describe the location of strain gages to address OE
25 Schedule
- RAIs 2-6, except 4: Responses by 2/6/2012
- RAIs 1, 4, 8-12: Responses by 2/15/2012
- Current outage schedule supporting mid-May power ascension
- License Amendment needed to support optimum data collection capability considering on-dryer instrument life
26 Summary
- Current set of draft RAIs represent all outstanding questions applicable to GGNS. Proposed responses to Draft RAIs address identified issues and provide a basis for a safety determination.
- All modeling inconsistencies, inaccuracies, and approximations have been properly accounted for and justified in the current analysis. This demonstrates that the GGNS replacement steam dryer is adequately designed for service under EPU conditions.
- Adequacy of the replacement steam dryer will be further confirmed through implementation of on-dryer instrumentation and power ascension monitoring and analysis.