Discusses Insp Repts 50-456/97-09 & 50-457/97-09 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000
ML20198R242
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/03/1997
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
Shared Package
ML20198R245 List:
References
50-456-97-09, 50-456-97-9, 50-457-97-09, 50-457-97-9, EA-97-265, NUDOCS 9711130199
Download: ML20198R242 (4)


See also: IR 05000456/1997009

Text

. . _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - - ~ ~ ~ ~ ~ ~ -

,

s# "%o UNITEo STATES

y.- k NUCLEAR REGut.ATORY COMMISSION

q S REGION Hi

I

E' 1E '31 WARRENVILLE ROAD

g usLE, ILUNois 00532-4351 f*

October 3, 1997

EA 97-265 ,

.

Mr. H. G. Stanjay

p

Site Vice President

Braidwood Station

Commonwealth Edison Company

RR #1, Box 84

Braceville, IL 60407

SUBJECT: NOTICE OF VIOLATION f ND PROPOSED IMPOSITION OF CIVIL PENALTY -

$55,000 (NRC Inspectiori 6 sport No. 50-546/97009; 50-457/97009)

Hb

Dear Mr. Stanley:

This refers to the inspection conducted from May 20 through June *o 0,1997, at the Braidwood Unit 1

and Unit 2 reactor facilities. An exit meeting ws conducted on June 30,1997, and the inspection

report was issued on August 26,1997. A predecisional enforcement conference was conducted on

September 11,1997, tn discuss t'a inspection issues related to strict compliance with Technical

Specifications (TS) for the Emerg 2 cy Core Cooling System (ECCS) subsystems. Specifically,

these issues are related to the Centrifugal Charging (CV) system, a subsystem of ECCS,

Based on the information developed during the inspection and the information that you prwided

during the conference, the NRC has determined that a violation of NRC requirements occurred.

The violation is cited in the enclosed Notice of Violation (Notice) and Proposed imposition of Civil

Penalty and the circumstances surrounding it are described in detailin the subject inspection

report.

The violation in the enclosed Notice involves the failure to strictly comply with TS surveillance test

requirement 4.5.2.b(1) which requires the ECCS pump casings and discharge piping high points

outside of containment be vented at least once every 31 days. On February 16,1996, a Braidwood

Station system engineer discovered that the CV pump casing and high points were not being vented

every 31 days as required. The decision to not strictly comply with the TS was partially based by

the Braidwood Station staff on the fact that the CV pump casings did not have vents. A subsequent '

operability justification determined that the intent of the TS was being met based on factors such as

the pressure in the piping and the CV system design and piping configuration. However, this y

operability justification failed to recognize that TS requirements were not being strictly met and that

a TS change was needed. The failure to recognize that the TS requirements J ! Y were not

met and to seek a TS change was identified by the NRC.

The potential safety consehe3delfl!EldiMs low. Venting of the ECCS is required to

ensure that no air is entrained in the ECCS that could result in water hammer or air binding that

could prevent proper pump /6@hlM pMo&n66 Due to the pressure in the CV system piping and

the system contiguration, this was not likely to occur. In addition, the ultrasonic testing, performed

by the Braidwood Station staff, of3 elept34 igh points found no entrained air. However, while

<

the potential safety consequenN EOM, latory significance is high. The Braidwood Station

9711130199 971003

PDR ADOCK 05000456

""

l.llI.ll11ll . . lil.Ill. I.llll .

.

.

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -____ _______ _____ _

..

H. Stanley -2-

f

staff continued to operate outside of TS requirements even after discovering that the TS was not

being strictly complied with and NRC involvement was necessary in order to ensure that strict

compliance with the TS requirements and the necessary TS changes were made. The failure to

request the necessary TS changes denied the NRC the opportunity to determine whether safety

issues were involved,

Based on the foregoing, this violation has been categorized in accordance with the * General

Statement of Policy and Procedures for NRC Enforcement Actions"(Enforcement Policy), NUREG-

1600 at Severity Level ill, in accordance with the Enforcement Policy, a base civil penalty in the

amount of $55,000 is considered for a Severity Level lli violation. Because your facility has been

the subject of escalated enforcement actions within the last 2 years', the NRC considered whether

credit was warranted for /dentification and Corrective Action in accordance with the civil penalty

assessment in Section VI.B.2 of the Enforcement Policy,

identification credit was not warranted because Braidwood Station staff had an opportunity to

currect the violation in February 1996 when the TS noncompliance was identified. The NRC

identified the continued violation of the TS surveillance testing requirements during the 1997

inspection.

Corrective Action credit was warranted based on the corrective actions implemented and discussed

at the enforcement conference. The corrective actions included (1) ultrasonic testing inspection of

vulnerable areas in the CV system; (2) review of selected TS surveillance tests to verify strict

compliance; (3) submittal of appropriate license amendment requests; (4) revision of affected

procedures; and (5) distribution of a Station Manager letter which stresses strict compliance with

TS requirementa.

Therefore, to emphasize the importance of compliance with technical specifications, I have been

authorized, after consultation with the Director, Office of Enforcement, to issue the enclosed Notice

of Violation and Proposed imposition of Civil Penalty (Notice)in the amount of $55,000 for the

Severity Level lli violation.

You are required to respond to this letter and should fo!!ow the instructions specified in the enclosed

Notice when preparing your response. The NRC will use your response, in part, to determine

whether further enforcement action is necessary to ensure complianco with regulatory requirements.

A $100,000 proposed civil penalty and a Notice of Violation was issued on May 16,1996

for Severity Level 111 problems (EA 96-070 and EA 96-102) related to configuration control

of the hydrogen monitoring system and out of service problems associated with the safety

injection system.

l

_._O

.

_______-_

. .

,

,

-

f

H. Stanley 3-

In accordanca with 10 CFR 2.790 of the NRC's Rules of Practice," a copy of this letter, its;

enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).

Sincerely,

9

A. Dill Beach

Regional Administrator

Docket No. 50-456 & 50-457

License No. NPF 72 & NPF-77

Enclosure: Notice of Violation and Proposed

imposition of Civil Penalty

ec w/ encl: R. J. Manning, Executive

Vice President, Generation

M. Wallace, Senior Vice

President, Corporate Services

H. G. Stanley, Vice President

PWR Operations

Liaison Officer, NOC-BOD

- D. A. Sager, Vice President,

Generation Support

D. Farrar, Nuclear Regulatory

c Services Manager .

l. Johnson, Licensing

Operations Manager

Document Control Desk-Licentbg

Braidwood Station Manager

T. Sim gkin, Regulatory

Assurance Supervisor

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General i

. State Liaison Officer

Chairman, Illinois Commerce

Commission .

_

!

.s.

i<'.

- H.. Stanley

-

-4-

/

DISTRIBUTION:

' PUBLIC IE 01

SECY /\

CA

LCallan, EDO t

AThadani, DEDE

,s . LChandler, OGC

JGoldberg, OGC ' .

SCollins, NRR

. ,

RZimmerman, NRR

Enforcement Coordinators.

Rl, Rll and RIV- .

Residont inspector, Braidwood.

. RCapra, NRR

GDick, NRR

JGillitand, OPA t

HBe;i, OlG

g-

'

. GCaputo, 01

' LTrempei, OC -

'

TMartin, AEOD

- OE:ES.

OE:EA (2) '

GJohnson, OC/DAF..

RAO: Rill

SLO:Rlli -

l

PAO:Rlli

OC/LFDCB '

- DRP

- Docket File

. ,

._

%- g

< , .

.

. o