ML13330B222
Letter Sequence Meeting | |
---|---|
Initiation Administration Questions Answers Results
Other: ML13323A186, ML13323A189, ML13323A190, ML13323A191, ML13323B187, ML13323B191, ML13323B194, ML13323B196, ML13323B198, ML13323B199, ML13323B200, ML13323B201, ML13323B202, ML13323B204, ML13323B207, ML13323B208, ML13323B209, ML14052A053, ML14072A076, ML14086A386, ML14149A089, ML14149A434, ML14149A435, ML14178A481, ML14321A438, ML14321A677, ML14344A545, ML14344A546, ML14349A790, ML15119A326, ML15175A024, ML15183A007, ML15183A009, ML15246A128, ML15246A129, ML15265A601, ML16230A232, NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI), NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test., NOC-AE-13003065, Response to STP-GSI-191-EMCB-RAI-1, NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3, NOC-AE-14003101, Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application, NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1, NOC-AE-14003104, Revised Affidavit for Withholding for Casa Grande Analyses for Risk-Informed GSI-191 Licensing Application, NOC-AE-14003105, Third Set of Responses to April, 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application, NOC-AE-14003106, Second Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI- 191 Licensing Application, NOC-AE-14003111, Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing Application, NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application, NOC-AE-15003220, Description of Revised Risk-Informed Methodology and Responses to Round 2 Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application, NOC-AE-15003241, Attachment 3-4 - UFSAR Markups (Information Only) Through Definitions and Acronyms... further results | |
MONTHYEARML13323B1962012-06-12012 June 2012
[Table View]Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results. Project stage: Other ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. Project stage: Other NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. Project stage: Other ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations. Project stage: Other ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. Project stage: Other ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 Project stage: Other ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End Project stage: Other ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. Project stage: Other ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. Project stage: Other ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects. Project stage: Other NOC-AE-13002954, Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-1912013-01-31031 January 2013 Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: Request ML13214A0312013-08-13013 August 2013 Acceptance Review, Exemption Requests and License Amendment Request to Revise UFSAR for Resolution of Generic Safety Issue 191, Assessment of Debris Accumulation on PWR Sump Performance (TAC MF0613-MF0614; MF2400-09) Project stage: Acceptance Review ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. Project stage: Other ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) Project stage: Other NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)2013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). Project stage: Other ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis Project stage: Other ML13323B1872013-10-31031 October 2013 Project, Units 1 & 2, Submittal of GSI-191 Chemical Effects Test Reports (TAC Nos. MF2400 and MF2401) Project stage: Other ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 Project stage: Other ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 Project stage: Other ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 Project stage: Other NOC-AE-13003043, Enclosure 5 - Response to NRC Supplemental Information Items2013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13323A1832013-11-13013 November 2013 Project Units 1 and 2 - Supplement 1 to Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 Project stage: Supplement NOC-AE-13003054, Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal2013-11-21021 November 2013 Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Supplement ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 Project stage: Meeting NOC-AE-13003065, Response to STP-GSI-191-EMCB-RAI-12013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14009A3072014-01-0909 January 2014 NRR E-mail Capture - Request for Additional Information - TACs MF2400 Through MF2409 Project stage: RAI NOC-AE-13003057, Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application2014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14015A0452014-01-14014 January 2014 NRR E-mail Capture - Rai'S Regarding South Texas Project'S Submittal for Risk-Informed Resolution of GS-191 Project stage: Other ML13358A0622014-01-14014 January 2014 Summary of 12/16/13 Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14052A0532014-02-13013 February 2014 Project Units 1 & 2, Submittal of Casa Grande Code & Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Other NOC-AE-14003081, STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT42014-02-13013 February 2014 STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT4 Project stage: Request ML14149A4352014-02-14014 February 2014 Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 Project stage: Other ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 Project stage: Request ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 Project stage: Request ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 Project stage: Request ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 Project stage: Request ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 Project stage: Request ML14072A0762014-02-27027 February 2014 Project, Units 1 and 2, Submittal of GSI-191 Chemical Effects Test Reports (TAC Nos. MF2400 and MF2401) Project stage: Other ML14072A2112014-03-0606 March 2014 NRR E-mail Capture - STP Sensitivity Report and Presentation for Proposed Meeting Project stage: Request NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 32014-03-11011 March 2014 Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 Project stage: Other ML14086A3852014-03-17017 March 2014 Project, Units 1 & 2 - Response to NRC Accident Dose Branch Request for Additional Information Regarding STP Risk-Informed GSI-191 Application Project stage: Request ML14086A3862014-03-17017 March 2014 STP Risk-Informed GSI-191 Aadb RAI 3 Response, Attachment 2 Project stage: Other NOC-AE-14003111, Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing Application2014-03-18018 March 2014 Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing Application Project stage: Other NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. Project stage: Request ML14091A4522014-04-0808 April 2014 Request for Withholding Information from Public Disclosure - 12/9/13 G. Powell, STPNOC Affidavit Enclosing RELAP5 Digital Media Related to GSI-191 License Amendment and Exemption Requests Project stage: Withholding Request Acceptance ML14087A0752014-04-15015 April 2014 Request for Additional Information, Request for Exemptions and Revised Pilot License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: RAI NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 12014-04-18018 April 2014 University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1 Project stage: Other 2013-12-05 |
ML13330B222 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 12/05/2013 |
From: | Bartlett M A Plant Licensing Branch IV |
To: | Markley M T Plant Licensing Branch IV |
Bartlett M A | |
References | |
TAC MF2400, TAC MF2401 | |
Download: ML13330B222 (4) | |
Similar Documents at South Texas | |
---|---|
Category:Meeting Agenda
MONTHYEARPMNS20240554, Informal Outreach Meeting at Bay City Market Day to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at South Texas Project Electric Generating Station, Units 1 and 22024-04-16016 April 2024
[Table view]Informal Outreach Meeting at Bay City Market Day to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at South Texas Project Electric Generating Station, Units 1 and 2 PMNS20240189, Presubmittal Meeting with STP Nuclear Operating Company Regarding Proposed Quality Assurance Plan Change Regarding the Condition Adverse to Quality Definition for South Texas Project, Units 1 and 22024-03-0606 March 2024 Presubmittal Meeting with STP Nuclear Operating Company Regarding Proposed Quality Assurance Plan Change Regarding the Condition Adverse to Quality Definition for South Texas Project, Units 1 and 2 PMNS20230826, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at South Texas Project Nuclear Power Plant, Units 1 and 22023-07-11011 July 2023 Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at South Texas Project Nuclear Power Plant, Units 1 and 2 ML22229A4872022-08-17017 August 2022 Presubmittal Teleconference with STP Nuclear Operating Company Regarding Proposed License Amendment Request to Revise the Dose Consequence Analysis for MSLB and LRA Events for South Texas Project, Units 1 and 2 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220262, Meeting with South Texas Project Nuclear Operating Company (STPNOC) Regarding Its Exemption Request Related to an Inspection Requirement for One Multipurpose Canister at the STP Units 1 and 2 Independent Spent Fuel Storage Installation2022-03-21021 March 2022 Meeting with South Texas Project Nuclear Operating Company (STPNOC) Regarding Its Exemption Request Related to an Inspection Requirement for One Multipurpose Canister at the STP Units 1 and 2 Independent Spent Fuel Storage Installation (Isf PMNS20220173, Meeting with South Texas Project Nuclear Operating Company Regarding Expected Submittal of Exemption/Relief Request Related to a non-compliance with ASME Code Testing Requirements2022-02-25025 February 2022 Meeting with South Texas Project Nuclear Operating Company Regarding Expected Submittal of Exemption/Relief Request Related to a non-compliance with ASME Code Testing Requirements ML21196A4132021-07-15015 July 2021 Teleconference and Webinar with STP Nuclear Operating Company Regarding the License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirement for South Texas Project, Units 1 and 2 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML16113A1992016-04-22022 April 2016 Public Meeting - Discussion Between South Texas Project, Units 1 and 2, and NRC Staff Regarding the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the Facility ML15182A1802015-06-25025 June 2015 Talking Points for 7/2/15 Public Call ML14008A2252014-01-0808 January 2014 Notice of Category I Public Meeting Concurrence by NRO, to Discuss Resolution of Open Items and Outstanding Requests for Additional Information (RAI) Responses to Support the Safety Review of the South Texas Project (STP) Units 3... ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 ML13119A0802013-04-30030 April 2013 Notice Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed Approach to Resolve Generic Safety Issue 191 for South Texas, Units 1 and 2 ML13101A3142013-04-12012 April 2013 Notice of Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed Approach to Resolve Generic Safety Issue 191 for South Texas, Units 1 and 2 ML13023A3342013-02-25025 February 2013 1/15/2013 Summary of Public Meetings Conducted to Discuss Draft Supplemental Environmental Impact Statement Related to Review of South Texas Project, Units 1 & 2, License Renewal Application ML13046A0652013-02-22022 February 2013 3/5/13 Notice of Preapplication Meeting Via Conference Call with STP Nuclear Operating Company to Discuss License Amendment Request for Fire Protection Program to Credit Additional Operator Actions for South Texas, Units 1 and 2 ML12331A2922012-11-27027 November 2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and ML12297A3312012-11-27027 November 2012 Summary of Prelicensing Meeting with STP Nuclear Operating Company to Discuss Proposed Amendment for Approval of Revised Fire Protection Program Related to Alternate Shutdown Capability for South Texas, Units 1 and 2 ML12340A1352012-11-27027 November 2012 Meeting Notice by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution South Texas Project, Units 1 and 2 ML12321A1222012-11-20020 November 2012 12/3/12 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Unit ML12270A4692012-10-23023 October 2012 August 27, 2012, Summary of Meeting Held on Between NRC and STPNOC Representatives to Discuss the STP, LRA ML12243A4042012-09-25025 September 2012 Notice of Prelicensing Meeting with STP Nuclear Operating Company to Discuss Proposed Amendment for Approval of Revised Fire Protection Program Related to Alternate Shutdown Capability for South Texas, Units 1 and 2 ML12261A3012012-09-21021 September 2012 Notice of Forthcoming Public Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach ML12227A5902012-08-23023 August 2012 9/6/2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Uni ML12226A4552012-08-15015 August 2012 Forthcoming Meeting with STP Nuclear Operating Company Regarding License Renewal for the South Texas Project, Units 1 and 2 ML12146A0202012-05-31031 May 2012 Notice of 6/11/12 Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Unit ML1207400312012-03-15015 March 2012 3/29/12 Notice of Meeting Viaconference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for Units 1 and 2 ML1203400432012-02-0303 February 2012 Notice of Forthcoming Meeting Via Conference Call with STP Nuclear Operating Company ML1203003642012-02-0202 February 2012 3/8/12 Forthcoming Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, U ML1200901012012-01-10010 January 2012 Notice of Forthcoming Public Meeting Via Conference Call with South Texas Project Nuclear Operating Company ML1132104112011-11-0101 November 2011 Revised Notice of by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, ML1129701092011-11-0101 November 2011 Notice of Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, Resolution Approach for South Texas, Units 1 & 2 ML1127900992011-10-11011 October 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 an ML1127901512011-10-11011 October 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 & ML1125101482011-09-15015 September 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Co. to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML1121301822011-08-0202 August 2011 Meeting Notice with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 (TAC ME5358-ME5359 ML1118615292011-07-12012 July 2011 Notice of Conference Call with STP Nuclear Operating Company to Discuss Risk-informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML1116402112011-06-24024 June 2011 Notice of Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 & 2 ML1113302442011-05-16016 May 2011 Notice of Meeting with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML1114706522011-05-16016 May 2011 Correction 06/02/2011 Notice of Meeting with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 ML1106701312011-03-0707 March 2011 Ltr to D. Rencurrel Re Participation in Commission Meeting on the Cumulative Effects of Reactor Regulation on 5/12/11 ML1104105052011-02-10010 February 2011 2/22/11 Notice of Forthcoming Public Meeting with STP Nuclear Operating Co., Units 1 & 2, to Discuss Risk-informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, Resolution Option Approach ML1035106972011-01-25025 January 2011 3/02/11 Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for South Texas Project, Units 1 and 2 License Renewal Application Review ML1023004452010-08-27027 August 2010 Notice of Conference Call with STP Nuclear Operating Corp., to Discuss Request for Additional Information for Generic Letter 2004-02 ML1021803392010-08-0505 August 2010 Ltr to E. Halpin Re Participation in Commission Meeting on the Resolution of Generic Safety Issue (GSI) - 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Performance on 09/29/10 ML0925703902009-09-17017 September 2009 Notice of Meeting with STP Nuclear Operating Company to Discuss Experience with Implementation of Risk Managed Technical Specification Pilot Amendment (Initiative 4b) and Other Initiatives ML0807100082008-03-11011 March 2008 Notice of Meeting with Arizona Public Service, Entergy Operations, Inc., Exelon Generation Co., FPL Energy, Luminant Generation Co., South Carolina Electric & Gas Co., STP Electric Generating Co., & Southern Nuclear Operating Co 2024-04-16 Category:Meeting Notice MONTHYEARPMNS20240554, Informal Outreach Meeting at Bay City Market Day to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at South Texas Project Electric Generating Station, Units 1 and 22024-04-16016 April 2024
[Table view]Informal Outreach Meeting at Bay City Market Day to Discuss the Nuclear Regulatory Commissions (NRC) 2023 Annual Assessment of Safety Performance at South Texas Project Electric Generating Station, Units 1 and 2 PMNS20240189, Presubmittal Meeting with STP Nuclear Operating Company Regarding Proposed Quality Assurance Plan Change Regarding the Condition Adverse to Quality Definition for South Texas Project, Units 1 and 22024-03-0606 March 2024 Presubmittal Meeting with STP Nuclear Operating Company Regarding Proposed Quality Assurance Plan Change Regarding the Condition Adverse to Quality Definition for South Texas Project, Units 1 and 2 PMNS20230826, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at South Texas Project Nuclear Power Plant, Units 1 and 22023-07-11011 July 2023 Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at South Texas Project Nuclear Power Plant, Units 1 and 2 ML22229A4872022-08-17017 August 2022 Presubmittal Teleconference with STP Nuclear Operating Company Regarding Proposed License Amendment Request to Revise the Dose Consequence Analysis for MSLB and LRA Events for South Texas Project, Units 1 and 2 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220262, Meeting with South Texas Project Nuclear Operating Company (STPNOC) Regarding Its Exemption Request Related to an Inspection Requirement for One Multipurpose Canister at the STP Units 1 and 2 Independent Spent Fuel Storage Installation2022-03-21021 March 2022 Meeting with South Texas Project Nuclear Operating Company (STPNOC) Regarding Its Exemption Request Related to an Inspection Requirement for One Multipurpose Canister at the STP Units 1 and 2 Independent Spent Fuel Storage Installation (Isf PMNS20220173, Meeting with South Texas Project Nuclear Operating Company Regarding Expected Submittal of Exemption/Relief Request Related to a non-compliance with ASME Code Testing Requirements2022-02-25025 February 2022 Meeting with South Texas Project Nuclear Operating Company Regarding Expected Submittal of Exemption/Relief Request Related to a non-compliance with ASME Code Testing Requirements ML21196A4132021-07-15015 July 2021 Teleconference and Webinar with STP Nuclear Operating Company Regarding the License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirement for South Texas Project, Units 1 and 2 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML16113A1992016-04-22022 April 2016 Public Meeting - Discussion Between South Texas Project, Units 1 and 2, and NRC Staff Regarding the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the Facility ML15271A3042015-09-28028 September 2015 Public Phone Call Meeting Description of Supplement 2 to STPNOC Risk-Informed Licensing Application to Address GSI-191 and Respond to GL-2004-02 ML14008A2252014-01-0808 January 2014 Notice of Category I Public Meeting Concurrence by NRO, to Discuss Resolution of Open Items and Outstanding Requests for Additional Information (RAI) Responses to Support the Safety Review of the South Texas Project (STP) Units 3... ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 ML13119A0802013-04-30030 April 2013 Notice Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed Approach to Resolve Generic Safety Issue 191 for South Texas, Units 1 and 2 ML13101A3142013-04-12012 April 2013 Notice of Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed Approach to Resolve Generic Safety Issue 191 for South Texas, Units 1 and 2 ML13046A0652013-02-22022 February 2013 3/5/13 Notice of Preapplication Meeting Via Conference Call with STP Nuclear Operating Company to Discuss License Amendment Request for Fire Protection Program to Credit Additional Operator Actions for South Texas, Units 1 and 2 ML12340A1352012-11-27027 November 2012 Meeting Notice by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution South Texas Project, Units 1 and 2 ML12331A2922012-11-27027 November 2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and ML12321A1222012-11-20020 November 2012 12/3/12 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Unit ML12243A4042012-09-25025 September 2012 Notice of Prelicensing Meeting with STP Nuclear Operating Company to Discuss Proposed Amendment for Approval of Revised Fire Protection Program Related to Alternate Shutdown Capability for South Texas, Units 1 and 2 ML12261A3012012-09-21021 September 2012 Notice of Forthcoming Public Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach ML12227A5902012-08-23023 August 2012 9/6/2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Uni ML12226A4552012-08-15015 August 2012 Forthcoming Meeting with STP Nuclear Operating Company Regarding License Renewal for the South Texas Project, Units 1 and 2 ML12195A3632012-07-13013 July 2012 08/1/2012 Notice of Open House Meeting with the Public to Discuss Results of South Texas Project License Renewal Inspection ML12146A0202012-05-31031 May 2012 Notice of 6/11/12 Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Unit ML1207400312012-03-15015 March 2012 3/29/12 Notice of Meeting Viaconference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for Units 1 and 2 ML1203400432012-02-0303 February 2012 Notice of Forthcoming Meeting Via Conference Call with STP Nuclear Operating Company ML1203003642012-02-0202 February 2012 3/8/12 Forthcoming Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, U ML1200901012012-01-10010 January 2012 Notice of Forthcoming Public Meeting Via Conference Call with South Texas Project Nuclear Operating Company ML1132104112011-11-0101 November 2011 Revised Notice of by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, ML1129701092011-11-0101 November 2011 Notice of Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, Resolution Approach for South Texas, Units 1 & 2 ML1127900992011-10-11011 October 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 an ML1127901512011-10-11011 October 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 & ML1125101482011-09-15015 September 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Co. to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML1121301822011-08-0202 August 2011 Meeting Notice with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 (TAC ME5358-ME5359 ML1118615292011-07-12012 July 2011 Notice of Conference Call with STP Nuclear Operating Company to Discuss Risk-informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML1116402112011-06-24024 June 2011 Notice of Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 & 2 ML1114706522011-05-16016 May 2011 Correction 06/02/2011 Notice of Meeting with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 ML1113302442011-05-16016 May 2011 Notice of Meeting with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML1111804402011-04-27027 April 2011 Notice of Public Meeting with South Texas Project Nuclear Operating Company Present and Discuss Performance Results for the Period of January 1 Through December 31, 2010 ML1104105052011-02-10010 February 2011 2/22/11 Notice of Forthcoming Public Meeting with STP Nuclear Operating Co., Units 1 & 2, to Discuss Risk-informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, Resolution Option Approach ML1035106972011-01-25025 January 2011 3/02/11 Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for South Texas Project, Units 1 and 2 License Renewal Application Review ML1023004452010-08-27027 August 2010 Notice of Conference Call with STP Nuclear Operating Corp., to Discuss Request for Additional Information for Generic Letter 2004-02 ML1008101622010-03-22022 March 2010 Design Acceptance Criteria (DAC) Working Group Category 2 Public Meeting ML0925703902009-09-17017 September 2009 Notice of Meeting with STP Nuclear Operating Company to Discuss Experience with Implementation of Risk Managed Technical Specification Pilot Amendment (Initiative 4b) and Other Initiatives ML0913801712009-05-18018 May 2009 Notice of Annual Assessment Meeting with South Texas Project Nuclear Operating Co. to Discuss Performance Results ML0811900722008-04-28028 April 2008 Notice of Meeting with South Texas Project Regarding End of Cycle Assessment ML0807100082008-03-11011 March 2008 Notice of Meeting with Arizona Public Service, Entergy Operations, Inc., Exelon Generation Co., FPL Energy, Luminant Generation Co., South Carolina Electric & Gas Co., STP Electric Generating Co., & Southern Nuclear Operating Co 2024-04-16 Category:Memoranda MONTHYEARML24297A6392024-10-30030 October 2024
[Table view]Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML19102A0162019-04-16016 April 2019 4/10/2019 Summary of Public Teleconference Regarding Potential Submission of a Relief Request to Allow Use of Carbon Fiber Reinforced Polymer for Selected Piping Repairs at South Texas, Units 1 and 2 ML18304A2902018-11-19019 November 2018 STP ISFSI PSP Rev 23 Review ML18289A5652018-10-16016 October 2018 Memorandum to D. White Technical Assistance Request - Review of Physical Security Plan for the South Texas Project Generating Station Independent Spent Fuel Storage Installation (CAC No.001027) ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML17233A0082017-08-21021 August 2017 Notification of Administrative Correction to Renewed Facility Operating License ML17187A1782017-07-0606 July 2017 License Renewal Application ML17137A3252017-05-17017 May 2017 Safety Evaluation of LAR by South Texas Project Nuclear Operating Company to Adopt a Risk-Informed Resolution of Generic Safety Issue-191 ML15190A0422017-05-12012 May 2017 the NRC Staff Evaluation of the Final Rule for Continued Storage of Spent Nuclear Fuel for the License Renewal Environmental Review for South Texas Project, Units 1 and 2 ML16334A4002017-03-24024 March 2017 Climate Change Review Analysis for South Texas Project, Units 1 and 2 - License Renewal Application ML16302A0162016-10-12012 October 2016 Corrected After Action Report/ Improvement Plan for Plume Phase Exercise Conducted on 07/13/2016 ML16013A0662016-01-14014 January 2016 Summary of 11/9 and 12/30/15 Conference Calls with STP Nuclear Operating Company to Discuss the Fall 2015 Steam Generator Tube Inspection Activities (CAC No. A11018) ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 ML13324A4942013-11-19019 November 2013 Deferral of Baseline Inspection Activities ML13303A9742013-10-31031 October 2013 PubMtgNotice-Nov13-2013-update ML13119A0802013-04-30030 April 2013 Notice Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed Approach to Resolve Generic Safety Issue 191 for South Texas, Units 1 and 2 ML13101A3142013-04-12012 April 2013 Notice of Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed Approach to Resolve Generic Safety Issue 191 for South Texas, Units 1 and 2 ML13023A3342013-02-25025 February 2013 1/15/2013 Summary of Public Meetings Conducted to Discuss Draft Supplemental Environmental Impact Statement Related to Review of South Texas Project, Units 1 & 2, License Renewal Application ML13046A0652013-02-22022 February 2013 3/5/13 Notice of Preapplication Meeting Via Conference Call with STP Nuclear Operating Company to Discuss License Amendment Request for Fire Protection Program to Credit Additional Operator Actions for South Texas, Units 1 and 2 ML12342A3972013-01-0303 January 2013 Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of South Texas Project, Units 1 and 2 ML12340A1352012-11-27027 November 2012 Meeting Notice by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution South Texas Project, Units 1 and 2 ML12331A2922012-11-27027 November 2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and ML12321A1222012-11-20020 November 2012 12/3/12 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Unit ML12312A2342012-11-13013 November 2012 Memo to File Summary Verbal Authorization Provided on 11/6/12 for Relief Request RR-ENG-3-10, RPV Head Flange O-Ring Leakoff Lines NDE, Third 10-Year Inservice Inspection Interval ML12243A4042012-09-25025 September 2012 Notice of Prelicensing Meeting with STP Nuclear Operating Company to Discuss Proposed Amendment for Approval of Revised Fire Protection Program Related to Alternate Shutdown Capability for South Texas, Units 1 and 2 ML12261A3012012-09-21021 September 2012 Notice of Forthcoming Public Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach ML12227A5602012-09-12012 September 2012 Summary of Telephone Conference Call Held on August 9, 2012, Between NRC and STPNOC, Concerning Clarification of One Part of Response to RAI 4.3-13. Pertaining to the STP, Units 1 and 2, LRA ML12227A5902012-08-23023 August 2012 9/6/2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Uni ML12226A4552012-08-15015 August 2012 Forthcoming Meeting with STP Nuclear Operating Company Regarding License Renewal for the South Texas Project, Units 1 and 2 ML12206A3032012-08-0707 August 2012 Summary of Telephone Conference Call Held on 7/3/12, Between the U.S. NRC and STP Nuclear Operating Company, Concerning Debris from Coating Failures - Followup, Pertaining to the South Texas Project, Units 1 and 2, LRA, TAC Nos. ME4936 and ML12146A0202012-05-31031 May 2012 Notice of 6/11/12 Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Unit ML12080A0352012-04-19019 April 2012 Summary of Telephone Conference Call Held on February 22, 2012 Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Regarding Requests for Additional Information STP - Record of Conference Call-02222012 on RAIs- ML12080A0442012-04-11011 April 2012 STP - Record of Conference Call-02092012 on RAIs-TLAAs ML12080A0402012-04-11011 April 2012 STP - Record of Conference Call-020162012 on RAIs-RVIs-31180-etc ML12080A0492012-04-11011 April 2012 STP - Record of Conference Call-03012012 on RAIs-RV Beltline ML12080A0552012-04-11011 April 2012 STP - Record of Conference Call-03082012 on RAIs-SGTI-RxHeadStudClosures ML1207400312012-03-15015 March 2012 3/29/12 Notice of Meeting Viaconference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for Units 1 and 2 ML1203400432012-02-0303 February 2012 Notice of Forthcoming Meeting Via Conference Call with STP Nuclear Operating Company ML1203003642012-02-0202 February 2012 3/8/12 Forthcoming Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, U ML1200901012012-01-10010 January 2012 Notice of Forthcoming Public Meeting Via Conference Call with South Texas Project Nuclear Operating Company ML11348A0392012-01-0404 January 2012 and 12/1/11, Summary of Telephone Conference Calls Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project LRA - Set 9 ML11320A1162011-12-0505 December 2011 November 9, 2011, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project Units 1 and 2 ML1129701092011-11-0101 November 2011 Notice of Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, Resolution Approach for South Texas, Units 1 & 2 ML1124114192011-10-0404 October 2011 8/22/11 Summary of Meeting with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 (TAC M ML1125101482011-09-15015 September 2011 Notice of Meeting by Conference Call with STP Nuclear Operating Co. to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 ML11216A2632011-08-23023 August 2011 Summary of Telephone Conference Call Held on July 28, 2011, Between the U.S. NRC and STP Nuclear Operating Company, Concerning RAI Pertaining to the South Texas Project, LRA ML1121301822011-08-0202 August 2011 Meeting Notice with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Units 1 and 2 (TAC ME5358-ME5359 2024-10-30 |
Text
MEMORANDUM TO: FROM:
SUBJECT:
DATE & TIME: LOCATION: PURPOSE: CATEGORY* UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 5, 2013 Michael T. Markley, Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Matt Bartlett, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FORTHCOMING MEETING REGARDING MODIFICATIONS TO THE SOUTH TEXAS PROJECT, UNITS 1 AND 2 RISK-INFORMED GENERIC SAFETY ISSUE-191 APPLICATION (TAC NOS. MF2400 AND MF2401) Monday, December 16, 2013 8:30 a.m. -2:30 p.m. EST U.S. Nuclear Regulatory Commission 11555 Rockville Pike, Room 3WFN-1C03 Rockville, Maryland STP Nuclear Operating Company (STPNOC) is meeting with the U.S. Nuclear Regulatory Commission (NRC) staff to discuss "Supplement 1 to Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 ,"dated November 13, 2013, for South Texas Project, Units 1 and 2. STPNOC will describe the changes proposed in this documentation which supersedes its prior submittal in its entirety. NRC will discuss its draft review plan and schedule. This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion but before the meeting is adjourned. *Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002.
M. Markley PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). M. Bartlett J. Sebrosky J. Stang S. Smith E. Geiger NRC C. Fong M. Yoder E.Wong P. Klein STPNOC M. Murray S. Blossom E. Kee W. Harrison Interested members of the public may participate in this meeting in person or via a toll-free audio teleconference. Please e-mail or call (e-mail preferred) one of the meeting contacts listed below before December 13, 2013, 3:00p.m. (Eastern Standard Time), to get the telephone number and the pass code. MEETING CONTACTS: Matt Bartlett, NRR 301-415-1577 Matthew.Bartlett@nrc.gov Joseph Sebrosky, NRR 301-415-1132 Joseph.Sebrosky@ nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. To receive a summary of this meeting and begin receiving other specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. Docket Nos. 50-498 and 50-499
Enclosure:
Agenda cc w/encl: Distribution via Listserv AGENDA FORTHCOMING MEETING REGARDING MODIFICATIONS TO THE SOUTH TEXAS PROJECT, UNITS 1 AND 2 RISK-INFORMED GENERIC SAFETY ISSUE-191 APPLICATION DOCKET NOS. 50-498 AND 50-499 MONDAY, DECEMBER 16,2013 8:30a.m.-2:30p.m. EST
- Introductions.
- Description of major changes in new submittal (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13323A 128) dated November 13, 2013.
- NRC review plan and schedule.
- Identify next steps and path forward.
- Adjourn. Enclosure M. Markley PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). M. Bartlett J. Sebrosky J. Stang S. Smith E. Geiger NRC C. Fong M. Yoder E .Wong P. Klein STPNOC M. Murray S. Blossom E. Kee W. Harrison Interested members of the public may participate in this meeting in person or via a toll-free audio teleconference. Please e-mail or call (e-mail preferred) one of the meeting contacts listed below before December 13,2013, 3:00p.m. (Eastern Standard Time), to get the telephone number and the pass code. MEETING CONTACTS: Matt Bartlett, NRR 301-415-1577 Matthew.Bartlett@nrc.gov Joseph Sebrosky, NRR 301-415-1132 Joseph.Sebrosky@ nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. To receive a summary of this meeting and begin receiving other specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. Docket Nos. 50-498 and 50-499
Enclosure:
Agenda cc w/encl: Distribution via Listserv DISTRIBUTION: LPL4*1 Reading RidsAcrsAcnw_MaiiCTR Resource RidsNrrDeEsgb Resource RidsNrrDorl Resource RidsNrrDor1Lpl4 Resource RidsNrrDraApla Resource RidsNrrDss Resource ADAMS Accession No. ML13330B222 RidsNrrDssSsib Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMSouthTexas Resource RidsOpaMail Resource RidsRgn4MaiiCenter Resource CFong, NRRIDRA/APLA EWong, NRR/DE/ESGB EGeiger, NRRIDSS/SSIB JStang, NRR/DSS/SSIB MYoder, NRRIDE/ESGB PKiein, NRRIDE/ESGB JSebrosky, NRRIDORULPL4*1 SSmith, NRR/DSS/SSIB OFFICE NRR/DORULPL4*1 /PM NRR/DORULPL4*1 /PM NRR/DORULPL4-1 /LA NRRIDORULPL4-1 /BC NRR/DORULPL4-1/PM NAME MBartlett JSebrosky (MBartlett for) JBurkhardt MMarkley MBartlett DATE 11/27/13 12/05/13 11/26/13 12/05/13 12/05/13 OFFICIAL RECORD COPY