Letter Sequence Meeting |
|---|
TAC:MF2400, Control Room Habitability (Approved, Closed) TAC:MF2401, Control Room Habitability (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML13295A222, ML13323A183, ML13323A186, ML13323A189, ML13323A190, ML13323A191, ML13323B187, ML13323B188, ML13323B191, ML13323B194, ML13323B196, ML13323B198, ML13323B199, ML13323B200, ML13323B201, ML13323B202, ML13323B204, ML13323B207, ML13323B208, ML13323B209, ML13338A165, ML14015A312, ML14052A053, ML14072A076, ML14086A386, ML14086A387, ML14087A126, ML14149A089, ML14149A353, ML14149A354, ML14149A434, ML14149A435, ML14149A437, ML14178A481, ML14178A485, ML14202A045, ML14321A438, ML14321A677, ML14344A545, ML14344A546, ML14344A547, ML14349A790, ML15072A092, ML15091A440, ML15119A326, ML15175A024, ML15183A007, ML15183A009, ML15246A126, ML15246A128... further results
|
MONTHYEARML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results Project stage: Other ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures Project stage: Other NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. Project stage: Other ML13323B1882012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test Project stage: Other ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations Project stage: Other ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition Project stage: Other ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 Project stage: Other ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End Project stage: Other ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal Project stage: Other ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report Project stage: Other ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects Project stage: Other ML13043A0132013-01-31031 January 2013 Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: Request ML13214A0312013-08-13013 August 2013 Acceptance Review, Exemption Requests and License Amendment Request to Revise UFSAR for Resolution of Generic Safety Issue 191, Assessment of Debris Accumulation on PWR Sump Performance (TAC MF0613-MF0614; MF2400-09) Project stage: Acceptance Review ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions Project stage: Other ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) Project stage: Other NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)2013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13295A2222013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5) Project stage: Other ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis Project stage: Other ML13323B1872013-10-31031 October 2013 Submittal of GSI-191 Chemical Effects Test Reports Project stage: Other ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 Project stage: Other ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 Project stage: Other ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 Project stage: Other NOC-AE-13003043, Enclosure 5 - Response to NRC Supplemental Information Items2013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13323A1922013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13316B9052013-11-13013 November 2013 Albrz Testing Update for NRR Final Project stage: Request ML13323A1832013-11-13013 November 2013 To Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 Project stage: Other ML13338A1652013-11-21021 November 2013 To Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Other NOC-AE-13003054, Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal2013-11-21021 November 2013 Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Supplement ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 Project stage: Meeting NOC-AE-13003065, Response to STP-GSI-191-EMCB-RAI-12013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other ML14015A3112013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request 05000498/LER-2013-003, Regarding Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection2013-12-23023 December 2013 Regarding Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection Project stage: Request ML14015A3122013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14009A3072014-01-0909 January 2014 NRR E-mail Capture - Request for Additional Information - TACs MF2400 Through MF2409 Project stage: RAI NOC-AE-13003057, Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application2014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14029A5332014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14015A0452014-01-14014 January 2014 NRR E-mail Capture - RAIs Regarding South Texas Projects Submittal for Risk-Informed Resolution of GS-191 Project stage: RAI ML13358A0622014-01-14014 January 2014 Summary of 12/16/13 Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14052A0542014-02-13013 February 2014 STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT4 Project stage: Request ML14052A0532014-02-13013 February 2014 Submittal of Casa Grande Code & Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Other ML14149A4352014-02-14014 February 2014 ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 Project stage: Other ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 Project stage: Request ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 Project stage: Request ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 Project stage: Request ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 Project stage: Request ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 Project stage: Request ML14072A0762014-02-27027 February 2014 Submittal of GSI-191 Chemical Effects Test Reports Project stage: Other 2013-11-21
[Table View] |
Text
LICENSEE:
STP Nuclear Operating Company FACILITY:
South Texas Project, Units 1 and 2
SUBJECT:
SUMMARY
OF DECEMBER 16, 2013, PUBLIC MEETING WITH STP NUCLEAR OPERATING COMPANY TO DISCUSS THE LICENSE AMENDMENT TO USE A RISK-INFORMED APPROACH TO THE RESOLUTION OF GSI-191, "ASSESSMENT OF DEBRIS ACCUMULATION ON PWR SUMP PERFORMANCE" (TAC NOS. MF2400 AND MF2401)
On December 16, 2013, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of STP Nuclear Operating Company (STPNOC, the licensee), at NRC Headquarters, Rockville, Maryland. The meeting notice and agenda, dated December 5, 2013, are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML13330B222. The licensee's and NRC staff handouts from the meeting are available in ADAMS at Accession Nos. ML13352A142 and ML13352A124, respectively. A list of meeting attendees is provided in the Enclosure to this meeting summary.
The purpose of the meeting was for STPNOC to discuss major changes to its license amendment request (LAR) to use a risk-informed approach to the resolution of Generic Safety Issue (GSI)-191, "Assessment of Debris Accumulation on PWR [Pressurized Water Reactor]
Sump Performance," at South Texas Project, Unit 1 and 2 (STP). The LAR was submitted on June 19, 2013 (ADAMS Accession No. ML131750250). STPNOC provided a supplement to the LAR by letter dated November 13, 2013 (ADAMS Accession No. ML13323A128). During the meeting, STPNOC described to the NRC staff the major changes between the June 19 and November 13, 2013, submittals.
Meeting Summary The licensee provided the staff with a high-level overview of the information in the November 13, 2013, submittal, and how the changes from the original submittal dated June 19, 2013, affected the LAR. Specifically, the STPNOC representatives discussed the following revisions found in the November 13, 2013, submittal:
- 1.
Corrected discrepancies between the technical description presented in Volume 3 of the submittal and the quantitative implementation in the CASA Grande calculation.
- 2.
Several numerical changes, including CASAGrande input file changes and code level changes.
- 3.
Editorial changes across all three volumes of the submittal for consistency, as well as removal of sections that the licensee found to be supplementary to or unused in STP's analysis.
Following discussion of the revisions between STPNOC and the NRC staff, the staff presented a high-level schedule for the completion of its review. The staff's target date for completing the review is November of 2015.
Action Items The following action items resulted from the meeting:
- 1.
STPNOC took an action to make the corrective action report associated with the issues that were corrected by the November 13, 2013, submittal available for the staff to audit.
STPNOC indicated that it would likely make the report available to the staff at Westinghouse's offices in Rockville, Maryland, and would inform the staff when the document was available for staff review.
- 2.
STPNOC took an action to provide a cross-walk document highlighting all changes reflected in the November 13, 2013, submittal as compared to the June 19, 2013, submittal. The cross-wall document will be made available for staff review in Westinghouse's offices in Rockville, Maryland.
- 3.
The NRC staff took an action to identify the specific submittal references the staff requested to audit for the purposes of technical review. The list of specific references is required so that STPNOC can make arrangements to allow the staff to review the documents.
- 4.
The NRC staff and STPNOC took an action to make arrangements for publicly noticed meetings via teleconference the weeks of January 6, and January 20, 2014, to discuss issues associated with the review. The purpose of the publicly noticed calls would be to help the staff facilitate the development of the requests for additional information (RAis),
if needed.
- 5.
Both the NRC staff and STPNOC took an action to engage the Advisory Committee on Reactor Safeguards (ACRS) to begin preparations for a May 2014 ACRS subcommittee briefing on GSI-191 resolution. Arrangements include scheduling the briefing, drafting an agenda, and ensuring key personnel are available.
- 6.
STPNOC took an action to provide the staff with the updated slides used for the December 16, 2013, meeting. There were minor changes made to slides 17 and 25 that were discussed during the meeting. Additionally, STPNOC made a clarifying change to slide 20 that was discussed during the meeting. Subsequent to the meeting, STPNOC provided the revised slides to the staff, which are reflected in the slide package that is available in ADAMS.
Please direct any inquiries to me at 301-415-3016, or balwant.singal@nrc.gov.
Docket Nos. 50-498 and 50-499
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv Sincerely,
~0-~'Q&~
~~gal, Senior-f:?roject Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
LIST OF ATTENDEES DECEMBER 16.2013. MEETING WITH STP NUCLEAR OPERATING COMPANY REGARDING RISK-INFORMED APPROACH TO RESOLUTION OF GSI-191 NAME Mike Murray Wayne Harrison Steve Blossom Ernie Kee Bruce Letellier**
Dominic Munoz**
Craig Sellers John H. Swailes Ronald W Holloway Gilbert Zigler*
Maurice Dingler*
Kip Walker*
Jeanette Leavitt*
Roger Anreasen*
Salim Parvez*
Jeffrery Weyhmiller*
Jeffrey Brown*
Paul Leonard*
Jeffrey Miller*
Jim Sande*
Seyed A. Reihani*
Lori A. Christensen*
David Pelton C.J. Fong Matt Yoder Paul Klein Marioly-Diaz Colon Ervin Geiger Steve Smith SOUTH TEXAS PROJECT. UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499 TITLE ORGANIZATION Licensing Manager STP Nuclear Operating Company (STPNOC)
Licensing Manager STPNOC Project Manager STPNOC STPNOC Ali on Ali on Senior Project Manager ENERCON/Calvert Cliffs WMI/Calvert Cliffs Project Manager WCNOC Senior Engineer ENERCON WCNOC ENERCON Ali on Ameren AREVA Entergy APS Nextera Palisades Enercon University of Illinois Point Beach Branch Chief, Generic U.S. Nuclear Regulatory Commission Communications and Power Uprate (NRC)
Branch Reliability and Risk Analyst NRC Senior Chemical Engineer NRC Senior Materials Engineer NRC General Engineer NRC Senior Engineer NRC Reactor Systems Engineer NRC
- Represented STPNOC Enclosure NAME TITLE John Stang Senior Project Manager Jeffrey Rikhoff Senior Environmental Scientist Timothy Collins Senior Technical Assistant Bruce Lin Mechanical Engineer Ashley Guzzetta Reactor Systems Engineer Steve Laur*
Senior Reliability and Risk Analyst Andrea George Project Manager Joe Sebrosky Senior Project Manager
- Represented STPNOC ORGANIZATION NRC NRC NRC NRC NRC NRC NRC NRC
ML13358A062
- via email OFFICE NRR/DORLILPL4-1/PM NRR/DORL/LPL4-1/PM NRR/DORLILPL4/LA NAME AGeorge*
BSingal JBurkhardt DATE 1/6/14 1/8/14 1/2/14 OFFICE NRR/DSS/SSIB/BC NRR/DORLILPL4-1/BC NRR/DORL/LPL4-1/PM NAME JStang*
MMarkley BSingal DATE 1/9/14 1/14/14 1/14/14