Letter Sequence Withholding Request Acceptance |
|---|
TAC:MF2400, Control Room Habitability (Approved, Closed) TAC:MF2401, Control Room Habitability (Approved, Closed) TAC:MF2402, Control Room Habitability (Open) TAC:MF2403, Control Room Habitability (Open) TAC:MF2404, Control Room Habitability (Open) TAC:MF2405, Control Room Habitability (Open) TAC:MF2406, Control Room Habitability (Open) TAC:MF2407, Control Room Habitability (Open) TAC:MF2408, Control Room Habitability (Open) TAC:MF2409, Control Room Habitability (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML13295A222, ML13323A183, ML13323A186, ML13323A189, ML13323A190, ML13323A191, ML13323B187, ML13323B188, ML13323B191, ML13323B194, ML13323B196, ML13323B198, ML13323B199, ML13323B200, ML13323B201, ML13323B202, ML13323B204, ML13323B207, ML13323B208, ML13323B209, ML13338A165, ML14015A312, ML14052A053, ML14072A076, ML14086A386, ML14086A387, ML14087A126, ML14149A089, ML14149A353, ML14149A354, ML14149A434, ML14149A435, ML14149A437, ML14178A481, ML14178A485, ML14202A045, ML14321A438, ML14321A677, ML14344A545, ML14344A546, ML14344A547, ML14349A790, ML15072A092, ML15091A440, ML15119A326, ML15175A024, ML15183A007, ML15183A009, ML15246A126, ML15246A128... further results
|
MONTHYEARML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results Project stage: Other ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures Project stage: Other NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. Project stage: Other ML13323B1882012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test Project stage: Other ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations Project stage: Other ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition Project stage: Other ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 Project stage: Other ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End Project stage: Other ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal Project stage: Other ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report Project stage: Other ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects Project stage: Other ML13043A0132013-01-31031 January 2013 Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: Request ML13214A0312013-08-13013 August 2013 Acceptance Review, Exemption Requests and License Amendment Request to Revise UFSAR for Resolution of Generic Safety Issue 191, Assessment of Debris Accumulation on PWR Sump Performance (TAC MF0613-MF0614; MF2400-09) Project stage: Acceptance Review ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions Project stage: Other ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) Project stage: Other NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)2013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13295A2222013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5) Project stage: Other ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis Project stage: Other ML13323B1872013-10-31031 October 2013 Submittal of GSI-191 Chemical Effects Test Reports Project stage: Other ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 Project stage: Other ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 Project stage: Other ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 Project stage: Other ML13323A1852013-11-13013 November 2013 Enclosure 3 - License Amendment Request for STP Piloted Risk-Informed Approach to Closure for GSI-191 Project stage: Request NOC-AE-13003043, Enclosure 5 - Response to NRC Supplemental Information Items2013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13323A1922013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13316B9052013-11-13013 November 2013 Albrz Testing Update for NRR Final Project stage: Request ML13323A1832013-11-13013 November 2013 To Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 Project stage: Other ML13338A1652013-11-21021 November 2013 To Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Other NOC-AE-13003054, Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal2013-11-21021 November 2013 Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Supplement ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 Project stage: Meeting NOC-AE-13003065, Response to STP-GSI-191-EMCB-RAI-12013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other ML14015A3112013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request 05000498/LER-2013-003, Regarding Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection2013-12-23023 December 2013 Regarding Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection Project stage: Request ML14015A3122013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14009A3072014-01-0909 January 2014 NRR E-mail Capture - Request for Additional Information - TACs MF2400 Through MF2409 Project stage: RAI NOC-AE-13003057, Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application2014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14029A5332014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14015A0452014-01-14014 January 2014 NRR E-mail Capture - RAIs Regarding South Texas Projects Submittal for Risk-Informed Resolution of GS-191 Project stage: RAI ML13358A0622014-01-14014 January 2014 Summary of 12/16/13 Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14052A0542014-02-13013 February 2014 STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT4 Project stage: Request ML14052A0532014-02-13013 February 2014 Submittal of Casa Grande Code & Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Other ML14149A4352014-02-14014 February 2014 ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 Project stage: Other ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 Project stage: Request ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 Project stage: Request ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 Project stage: Request ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 Project stage: Request ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 Project stage: Request 2013-11-21
[Table View] |
Request for Withholding Information from Public Disclosure - 2/10/14 Affidavit Executed by M. Stachowiak, Alion Science and Technology; Casa Grande Computer Codes and Input; GSI-191 Amendment and Exemption Requests| ML14092A557 |
| Person / Time |
|---|
| Site: |
South Texas  |
|---|
| Issue date: |
06/04/2014 |
|---|
| From: |
Balwant Singal Plant Licensing Branch IV |
|---|
| To: |
Koehl D South Texas |
|---|
| Singal B, NRR/DORL/LPLIV-1 |
| References |
|---|
| GSI-191, TAC MF2400, TAC MF2401, TAC MF2402, TAC MF2403, TAC MF2404, TAC MF2405, TAC MF2406, TAC MF2407, TAC MF2408, TAC MF2409 |
| Download: ML14092A557 (4) |
|
Text
Mr. Dennis L. Koehl President and CEO/CNO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 4, 2014 STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2-REQUEST FOR VVITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS. MF2400, MF2401, MF2402, MF2403, MF2404, MF2405, MF2406, MF2407, MF2408, AND MF2409)
Dear Mr. Koehl:
By letter dated February 13, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14052A053), STP Nuclear Operating Company (STPNOC) submitted an affidavit dated February 10, 2014, executed by Ms. Megan A. Stachowiak, Division Manager, Nuclear Services, Alien Science and Technology (Alien), requesting that information designated as proprietary in the documents listed below be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Part 2, Section 2.390.
However, the affidavit did not specifically reference the documents containing the proprietary information. By letter dated May 15, 2014 (ADAMS Accession No. ML14149A353), STPNOC submitted a revised affidavit dated May 13, 2014, making a specific reference to the following documents containing the proprietary information:
- 1.
STP [South Texas Project]-specific CASA [Containment Accident Stochastic Analysis] Grande Input CASA01 JT4 (Proprietary Version)
- 2.
STP-specific CASAGrande Input CASA09 JT4 (Proprietary Version)
- 3.
STP-specific CASAGrande Input CASA22 JT4 (Proprietary Version)
- 4.
STP-specific CASAGrande Input CASA26 JT4 (Proprietary Version)
- 5.
STP-specific CASAGrande Input CASA43 JT4 (Proprietary Version)
- 6.
Proprietary CD (containing copy of electronic files for items 1 through 5]
The proprietary version of the documents are designated as Attachments 2 through 6 and 2 and the revised Alien affidavit is Attachment to the letter dated May 15, 2014, from STPNOC to the U.S. Nuclear Regulatory Commission (NRC), for the STP, Units 1 and 2.
A non-proprietary copy of the documents (Attachments 2 through 6), provided as Attachments 7 through 11 to the letter dated February 13, 2014, has been placed in the NRC's Public Document Room and added to the NRC Library at ADAMS Accession No. ML14052A054. A non-proprietary version of Attachment 12 (Proprietary CD) was not provided since a copy of the non-proprietary version of documents contained by the CD are already provided as Attachments 7 through 11.
The May 13, 2014, affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
a)
Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by Alien's competitors without license from Alion constitutes a competitive economic advantage over other companies.
b)
Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the information sought to be withheld in the submittal, contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-3016.
Docket Nos. 50-445 and 50-446 cc:
Ms. Megan A. Stachowiak Manager, Nuclear Services Division Alion Science and Technology 6200 Uptown Boulevard NE, Suite 120 Albuquerque, NM 87110 Additional Distribution via Listserv Sincerely, b~~
Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
ML14092A557 OFFICE NRRIDORULPL4-1/PM NRRIDORULPL4-1/LA NAME BSingal JBurkhardt DATE 4/7/14 4/7/14 RidsNrrPMSouthTexas Resource RidsNrrLAJBurkhardt Resource RidsRgn4MaiiCenter Resource EGeiger, NRR/DSS/SSIB NRR/DSS/SSIB/BC NRRIDORULPL4-1/BC VCusumano MMarkley 4/9/14 6/4/14