Letter Sequence Other |
|---|
TAC:MF2400, Control Room Habitability (Approved, Closed) TAC:MF2401, Control Room Habitability (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML13295A222, ML13323A183, ML13323A186, ML13323A189, ML13323A190, ML13323A191, ML13323B187, ML13323B188, ML13323B191, ML13323B194, ML13323B196, ML13323B198, ML13323B199, ML13323B200, ML13323B201, ML13323B202, ML13323B204, ML13323B207, ML13323B208, ML13323B209, ML13338A165, ML14015A312, ML14052A053, ML14072A076, ML14086A386, ML14086A387, ML14087A126, ML14149A089, ML14149A353, ML14149A354, ML14149A434, ML14149A435, ML14149A437, ML14178A481, ML14178A485, ML14202A045, ML14321A438, ML14321A677, ML14344A545, ML14344A546, ML14344A547, ML14349A790, ML15072A092, ML15091A440, ML15119A326, ML15175A024, ML15183A007, ML15183A009, ML15246A126, ML15246A128... further results
|
MONTHYEARML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results Project stage: Other ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures Project stage: Other NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. Project stage: Other ML13323B1882012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test Project stage: Other ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations Project stage: Other ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition Project stage: Other ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 Project stage: Other ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End Project stage: Other ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal Project stage: Other ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report Project stage: Other ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects Project stage: Other ML13043A0132013-01-31031 January 2013 Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: Request ML13214A0312013-08-13013 August 2013 Acceptance Review, Exemption Requests and License Amendment Request to Revise UFSAR for Resolution of Generic Safety Issue 191, Assessment of Debris Accumulation on PWR Sump Performance (TAC MF0613-MF0614; MF2400-09) Project stage: Acceptance Review ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions Project stage: Other ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) Project stage: Other NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)2013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13295A2222013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5) Project stage: Other ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis Project stage: Other ML13323B1872013-10-31031 October 2013 Submittal of GSI-191 Chemical Effects Test Reports Project stage: Other ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 Project stage: Other ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 Project stage: Other ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 Project stage: Other NOC-AE-13003043, Enclosure 5 - Response to NRC Supplemental Information Items2013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13323A1922013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13316B9052013-11-13013 November 2013 Albrz Testing Update for NRR Final Project stage: Request ML13323A1832013-11-13013 November 2013 To Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 Project stage: Other ML13338A1652013-11-21021 November 2013 To Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Other NOC-AE-13003054, Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal2013-11-21021 November 2013 Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Supplement ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 Project stage: Meeting NOC-AE-13003065, Response to STP-GSI-191-EMCB-RAI-12013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other ML14015A3112013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request 05000498/LER-2013-003, Regarding Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection2013-12-23023 December 2013 Regarding Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection Project stage: Request ML14015A3122013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14009A3072014-01-0909 January 2014 NRR E-mail Capture - Request for Additional Information - TACs MF2400 Through MF2409 Project stage: RAI NOC-AE-13003057, Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application2014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14029A5332014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14015A0452014-01-14014 January 2014 NRR E-mail Capture - RAIs Regarding South Texas Projects Submittal for Risk-Informed Resolution of GS-191 Project stage: RAI ML13358A0622014-01-14014 January 2014 Summary of 12/16/13 Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14052A0542014-02-13013 February 2014 STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT4 Project stage: Request ML14052A0532014-02-13013 February 2014 Submittal of Casa Grande Code & Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Other ML14149A4352014-02-14014 February 2014 ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 Project stage: Other ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 Project stage: Request ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 Project stage: Request ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 Project stage: Request ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 Project stage: Request ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 Project stage: Request ML14072A0762014-02-27027 February 2014 Submittal of GSI-191 Chemical Effects Test Reports Project stage: Other 2013-11-21
[Table View] |
Text
NOC-AE-1 4003103 to Attachment 1 Alion report supporting resolution of APLAB, CASA Grande - LOCA Frequencies: RAI 4 (ALION-REP-STP-8998-02, Rev. 0, "STP CASA Grande Analysis and LAR Enclosure 4-3 RAI Response")
NOC-AE-1 4003103 Page 1 of 5 SCLION SCIENCE AND TECHNOLOGY TECHNICAL DOCUMENT COVER PAGE Document No: ALION-REP-STP-8998-02 Revision:0 Page 1
of 5
Document
Title:
STP CASA Grande Analysis and LAR Enclosure 4-3 RAI 1Response Project No: STP-8898 Project Name: STP Risk Informed GSI-191 Support Client: STP Nuclear Operating Company Document Purpose/Summary: Request for additional information 1 (RAI 1) inquired about reference specific, pertinent weld break frequency information that was used in the STP CASA Grande analysis documentation (LAR Enclosure 4-3).
This document cross references LAR Enclosure 4-3 with references of interest and their contents, and provides high-level clarification of their usage.
This document is not considered safety related. However, it has been prepared, reviewed, and approved.
Design Verification Method:
X Design Review Alternative Calculation
___ Qualification Testing Professional Engineer (if required)
Approval:
N/A Date N/A Dominic Muhioz/ Ernie Kee*
2/14/2014 Prepared By:
Printed/Typed Name Signature Date Bruce Letellier 2/14/2014 Reviewed By:
Printed/Typed Name Signature Date Megan Stachowiak 2/14/2014 Approved By:
Printed/Typed Name Signature Date
NOC-AE-1 4003103 Page 2 of 5 ALION-REP-STP-8998-02 Revision:
0 STP CASA Grande Analvsis and LAR F~nclrv~iir* 4-3 RAI I Rosnrv-n*
Document Number:
Document
Title:
STP CASA Grande Analvsis and LAR Enclosure 4-3 RAI I Resrionse REVISION DATE Description 0
See Cover Initial release.
Page
- Denotes a preparer from outside of the ALION organization. All technical information provided and its correctness are solely the responsibilities of internal staff.
NOC-AE-1 4003103 Page 3 of 5 Table of Contents Table of Contents.......................................................................................................................
3 RA I #1 PRA Licensing Branch (A PLA).............................................................................
4 R e sp o n se.......................................................................................................................................
4 Availability of Reference 8 for Review...........................................................................
4 Confirm ation of References.............................................................................................
4 Specific Aspects of References used in the LA R.........................................................
5 Cross Reference Sum m ary...........................................................................................
5 Clarification Details......................................................................................................
5
NOC-AE-1 4003103 Page 4 of 5 RAI #1 PRA Licensing Branch (APLA)
Volume 3 of the license amendment request (LAR) describes the process used to assign break frequencies to welds in containment and cites two documents listed as references 7 & 8:
- 7. KNF Consulting Services LLC and Scandpower Risk Management Inc. Development of LOCA Initiating Event Frequencies for South Texas Project GSI-191 Final Reportfor 2011 Work Scope.
September 2011.
- 8. University of Texas at Austin. Modeling and Sampling LOCA Frequency and Break Size for STP GSI-191 Resolution. September 2012.
The staff notes that several versions of these documents are publically available in the NRC's Agency-wide Documents Access and Management System (ADAMS). A brief comparison of the fitted Johnson parameters in the above version of Reference 8 to Table 2.2.2 revealed differences between the LAR and the referenced document. Please confirm that Volume 3 contains the correct information from these reports and cites the correct versions of the aforementioned references. Please clarify exactly which aspects of the aforementioned references (e.g., by providing specific section or equation numbers) are used in the STP pilot application.
Response
Availability of Reference 8 for Review LAR Enclosure 4-3 Reference 8 has been sent for publication in the NRC PDR with STP transmittal letter NOC-AE-13003070 (Letter, dated December 23, 2013, M.D. Meier to the NRC Document Control Desk) in order to make it publically available for review.
Confirmation of References The two referenced documents number (7), and (8) in STP's GSI-191 submittal are shown below as listed in LAR Enclosure 4-3.
- 7.
KNF Consulting Services LLC and Scandpower Risk Management Inc. Development of LOCA Initiating Event Frequencies for South Texas Project GSI-191 Final Report for 2011 Work Scope. September 2011.
- 8.
University of Texas at Austin. Modeling and Sampling LOCA Frequency and Break Size for STP GSI-191 Resolution. September 2012.
The revision number and date of LAR Enclosure 4-3 Reference 7 as written has been confirmed to be correct.
The revision number and date of LAR Enclosure 4-3 Reference 8 as written has been confirmed to be correct.
NOC-AE-1 4003103.
Page 5 of 5 Specific Aspects of References used in the LAR Cross Reference Summary Table 1: LAR End 4-3 Cross Reference Matrix Cross Reference -3 (Table)CrsRernc LAR Encl. 4-3 Ref. No.
Ref. Section Ref. Page Ref. Table (37) 7.8 7-55 7.19 Table 2.2.2 (8) 5 44 31 (8) 2.1 7
(8) 5 44 32 Tables 2.2.3-2.2.10 (7) 5 5-1 to5-4 "2 Clarification Details Weld break frequencies are estimated in NUREG 1829 (Ref. 37 of LAR Encl. 4-3). The values from this elicitation are titled "NUREG-1829 Quantiles" in Table 2.2.2 of LAR Encl. 4-3, and are identical to the values given in Table 7.19 (Pg. 7-55) of NUREG-1829 for current-day break frequencies with the exception of two additional break sizes. These two additional break sizes (in LAR Encl. 4-3, Table 2.2.2) were linearly interpolated between NUREG-1829 frequencies to be consistent with the STP probabilistic risk assessment (PRA) SBLOCA and MBLOCA bounding break sizes of 2 inches (SBLOCA-MBLOCA) and 6 inches (MBLOCA-LBLOCA). Interpolation was performed for the 5 th percentile, median, mean, and 9 5 th quantiles of the NUREG-1829 distributions as described in Section 5 of Encl. 4-3 Reference 8, and the interpolated values are shown in Encl. 4-3 Reference 8, Table 31.
The quantiles of current-day break frequencies in NUREG-1829 Table 7.19 were fit to a parametric (Bounded Johnson) distribution as described in Section 2 of LAR Encl. 4-3 Reference 8. The Johnson parameters from Table 2.2.2 of LAR Encl. 4-3 are also described in LAR Encl. 4-3 Reference 8. As described, the parameters of the Johnson distributions closely fit the 5 th percentile, median, and 9 5th percentile of the NUREG-1829 distribution values (Section 2.1, Table 3 of LAR Encl. 4-3 Reference 8) with explicitly listed parameter values in LAR Encl. 4-3 Reference 8 Table 2. The parametric fit for a Johnson distribution at the two additional break sizes at the interpolated values of 2 and 6 inches (described above) are given in LAR Encl. 4-3 Reference 8 Table 32. Estimates of the mean break frequency reported in NUREG-1829 Table 7.19 were not used in this analysis.
Reference 7 Tables 5-1 through 5-4 are the source for the values in LAR Encl. 4-3 Tables 2.2.3-2.2.10. The values from tables 5-1 through 5-4 were used as weighting factors to distribute NUREG-1829 total break frequencies across weld types and to containment locations by matching weld types with containment weld data. In LAR Encl. 4-3, conservation of NUREG-1829 total break frequency is referred to as the "top-down" portion of the "hybrid" break frequency approach. Tables 5-1 through 5-4 from reference 7 represent the product of "bottom-up" aggregation of cross-industry data on observed flaws or degradation that may lead to breaks.