Letter Sequence Other |
|---|
TAC:MF2400, Control Room Habitability (Approved, Closed) TAC:MF2401, Control Room Habitability (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML13295A222, ML13323A183, ML13323A186, ML13323A189, ML13323A190, ML13323A191, ML13323B187, ML13323B188, ML13323B191, ML13323B194, ML13323B196, ML13323B198, ML13323B199, ML13323B200, ML13323B201, ML13323B202, ML13323B204, ML13323B207, ML13323B208, ML13323B209, ML13338A165, ML14015A312, ML14052A053, ML14072A076, ML14086A386, ML14086A387, ML14087A126, ML14149A089, ML14149A353, ML14149A354, ML14149A434, ML14149A435, ML14149A437, ML14178A481, ML14178A485, ML14202A045, ML14321A438, ML14321A677, ML14344A545, ML14344A546, ML14344A547, ML14349A790, ML15072A092, ML15091A440, ML15119A326, ML15175A024, ML15183A007, ML15183A009, ML15246A126, ML15246A128... further results
|
MONTHYEARML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results Project stage: Other ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures Project stage: Other NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. Project stage: Other ML13323B1882012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test Project stage: Other ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations Project stage: Other ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition Project stage: Other ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 Project stage: Other ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End Project stage: Other ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal Project stage: Other ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report Project stage: Other ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects Project stage: Other ML13043A0132013-01-31031 January 2013 Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: Request ML13214A0312013-08-13013 August 2013 Acceptance Review, Exemption Requests and License Amendment Request to Revise UFSAR for Resolution of Generic Safety Issue 191, Assessment of Debris Accumulation on PWR Sump Performance (TAC MF0613-MF0614; MF2400-09) Project stage: Acceptance Review ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions Project stage: Other ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) Project stage: Other NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)2013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13295A2222013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5) Project stage: Other ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis Project stage: Other ML13323B1872013-10-31031 October 2013 Submittal of GSI-191 Chemical Effects Test Reports Project stage: Other ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 Project stage: Other ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 Project stage: Other ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 Project stage: Other NOC-AE-13003043, Enclosure 5 - Response to NRC Supplemental Information Items2013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13323A1922013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13316B9052013-11-13013 November 2013 Albrz Testing Update for NRR Final Project stage: Request ML13323A1832013-11-13013 November 2013 To Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 Project stage: Other ML13338A1652013-11-21021 November 2013 To Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Other NOC-AE-13003054, Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal2013-11-21021 November 2013 Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Supplement ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 Project stage: Meeting NOC-AE-13003065, Response to STP-GSI-191-EMCB-RAI-12013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other ML14015A3112013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request 05000498/LER-2013-003, Regarding Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection2013-12-23023 December 2013 Regarding Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection Project stage: Request ML14015A3122013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14009A3072014-01-0909 January 2014 NRR E-mail Capture - Request for Additional Information - TACs MF2400 Through MF2409 Project stage: RAI NOC-AE-13003057, Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application2014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14029A5332014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14015A0452014-01-14014 January 2014 NRR E-mail Capture - RAIs Regarding South Texas Projects Submittal for Risk-Informed Resolution of GS-191 Project stage: RAI ML13358A0622014-01-14014 January 2014 Summary of 12/16/13 Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14052A0542014-02-13013 February 2014 STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT4 Project stage: Request ML14052A0532014-02-13013 February 2014 Submittal of Casa Grande Code & Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Other ML14149A4352014-02-14014 February 2014 ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 Project stage: Other ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 Project stage: Request ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 Project stage: Request ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 Project stage: Request ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 Project stage: Request ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 Project stage: Request ML14072A0762014-02-27027 February 2014 Submittal of GSI-191 Chemical Effects Test Reports Project stage: Other 2013-11-21
[Table View] |
Text
1 NRR-PMDAPEm Resource From:
Harrison Albon [awharrison@STPEGS.COM]
Sent:
Monday, December 01, 2014 7:00 AM To:
Singal, Balwant; Lyon, Fred
Subject:
Fwd: Ernie's slides Attachments:
14SI008 Sldes.pdf; ATT00001.htm Balwant, Fred, This is the other STP presentation.
Note that we are bringing 25 copies of both presentations with us to the meeting.
- Regards, Wayne Harrison 979-292-6413 Begin forwarded message:
From: "Kee, Ernie" <keeej@STPEGS.COM<mailto:keeej@STPEGS.COM>>
To: "Harrison Albon" <awharrison@STPEGS.COM<mailto:awharrison@STPEGS.COM>>
Subject:
Ernie's slides Ernie Kee 5 Pheasant Run Ln Bay City, TX 77414 YK.risk, LLC, w: http://ykriskllc.com h: http://erniestinyworld.com 979.479.2312
Hearing Identifier:
NRR_PMDA Email Number:
1758 Mail Envelope Properties (09EDD282-012B-4012-A115-E62BE6456A9C)
Subject:
Fwd: Ernie's slides Sent Date:
12/1/2014 6:59:58 AM Received Date:
12/1/2014 7:00:07 AM From:
Harrison Albon Created By:
awharrison@STPEGS.COM Recipients:
"Singal, Balwant" <Balwant.Singal@nrc.gov>
Tracking Status: None "Lyon, Fred" <Fred.Lyon@nrc.gov>
Tracking Status: None Post Office:
STPEGS.COM Files Size Date & Time MESSAGE 518 12/1/2014 7:00:07 AM 14SI008 Sldes.pdf 1504181 ATT00001.htm 232 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Bounding Debris Approach:
STPNOC NRC Public Meeting 01 December - 03 December 2014 1 / 12
Summary
- 1. Use STPNOC 2008 validated test data to bound the LAR risk evaluation
- 2. Scale the test data to the current ZOI requirements
- 3. Show the scaled test data indicate adequate strainer performance at break sizes that have corresponding exceedance frequency in Region II or III (assume core damage frequency is the exceedance frequency at the break size)
- 4. Show the frequency for the largest break size below which failure in-vessel (core "ber loading) occurs is also in Region II or Region III (referred to as simulation)
- 5. The scaled frequencies for dierent interpolation methods are shown to be low in Region II (at the boundary of Region III) 2 / 12
Concept
- 1. Use results of previous strainer testing (performed in July 2008) to "nd the largest break size below which strainer failure does not occur Check if the break size is greater than the largest break size below which in-vessel failure occurs (i.e., 7.5 gm/FA)
Use the smallest of the two break sizes to check CDF against NUREG 1829 exceedance frequencies Ensure the exceedance frequency for the smallest break size is in Region II or III of RG 1.174
- 2. Using the PRA, ensure the risk {CDF,CDF}, {LERF,LERF} for breaks above the smaller of the two break sizes (in-vessel or strainer) is in Region III of RG 1.174
- 3. If either the exceedance frequency from the initial screen fails to be in Region II OR the Probabilistic Risk Assessment is not in Region III, the results are unacceptable
- 4. Otherwise the evaluation of the debris risk is acceptable as long as the other requirements of RG 1.174 are met 3 / 12
4 / 12
Volume scaling - 2008 strainer test Although a 5D break would be a single-sided break (that is, half the volume of a DEGB), assume spherical volume and compute the equivalent break size (nominally 5
17D, see what follows) at the 2008 worst case break location that would produce the same amount of "ne debris as that which was assumed in the 2008 test.
Because the 2008 test used a dierent "nes size distribution than that used in the LAR, the more conservative "nes generation amount (ignoring the factor of two) will be used as the basis. That is, if the 2008 testing assumption was more conservative than the LAR, then use a 5D assumption, otherwise, the break needs further scaling to account for missing "nes. As shown in what follows, the 2008 "nes distribution was more conservative (although eectively equivalent) than the LAR methodology.
5 / 12
Fines distribution from dierent methods The 2008 test (AREVA, 2008) used two ZOIs, 7D and 5D. In the 7D to 5D ZOI, all the debris was assumed to be large pieces. In the 5D ZOI, 30% of 60% of the debris (that is, 18% of debris) was assumed to be "nes.
The LAR uses three shells with dierent "nes distributions as summarized in the table below. The 2008 method is more conservative (greater amount of "nes produced in the ZOI).
In order to preserve the same amount of "ber as was tested in 2008, 5D is used as the basis for scaling.
6 / 12
Volume scaling using 5D as a basis V = 4
- 3r3, (1a)
V =
4 3 {(5)(29in)}3 =
4 3 {(17)(Xin)}3,
(1b)
{(5)(29in)}3 = {(17)(X)}3,
(1c) 3
{(5)(29in)}3 =
3
{(17)(X)}3, (1d)
(5)(29in) = (17)(X),
(1e)
X = 5 17(29in),
(1f)
X = 8.53in.
(1g) 7 / 12
5D ZOI scaling produces the same amount of "nes 8 / 12
Looking up the exceedance frequency The initial CDF used is for the exceedance frequency associated with the equivalent break size (8.53 in) determined for the 5D ZOI.
The values from NUREG-1829 (repeated in here below) are used.
Table: NUREG-1829 (Tregoning et al., 2008, Table 7.19) for the mean, median, 5th percentile, and 95th percentile exceedance frequency values for current-day estimates NUREG-1829 Values Category Break Size 5th Median Mean 95th cat1 1
2 6.80E-05 6.30E-04 1.90E-03 7.10E-03 cat2 1 5 8
5.00E-06 8.90E-05 4.20E-04 1.60E-03 cat3 3
2.10E-07 3.40E-06 1.60E-05 6.10E-05 cat4 7
1.40E-08 3.10E-07 1.60E-06 6.10E-06 cat5 14 4.10E-10 1.20E-08 2.00E-07 5.80E-07 cat6 31 3.50E-11 1.20E-09 2.90E-08 8.10E-08 9 / 12
Looking up the exceedance frequency Table: The CDF obtained if failures above the Break Size are assumed to go to failure and those below are success. Break Size data comes from simulation and test and the frequency data (CDF) from (Tregoning et al., 2008, Table 1, page xxi). Note that the in-vessel results, 7.34 inches (STPNOC, 2014, Attachment 1, page 37, APLAB RAI 2b), are included since both the strainer and core need to be considered.
Source Break Size Interpolation Method CDF Test 8.53 Log-Linear 1.02E-06 Test 8.53 Linear-linear 1.29E-06 Simulation 7.34 Log-Linear 1.45E-06 Simulation 7.34 Linear-linear 1.53E-06 10 / 12
Looking up the exceedance frequency Figure: Data for 7 inch and 14 inch equivalent break sizes from (Tregoning et al., 2008, Table 1, page xxi) (diamonds) shown with log-linear interpolated data (squares) and linear data interpolation (triangles) for the equivalent simulated and test break sizes 7.34 inches and 8.53 inches.
11 / 12
References AREVA (2008, August). South Texas Project Test Report for ECCS Strainer Testing. AREVA NP Document 66-9088089-000, AREVA NP, 7207 IBM Drive, Charlotte, NC 28262.
STPNOC (2014, July). South Texas Project Units 1&2 Docket Nos. STN 50-498, STN 50-499 Third Set of Responses to April, 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application (TAC NOs MF2400 and MF2401). STP LTR NOC-AE-14003105/STI32407300, ML14202A045, NRC Public Document Room.
Tregoning, R., L. Abramson, and P. Scott (2008, April). Estimating Loss-of-Coolant Accident (LOCA) Frequencies Through the Elicitation Process. NUREG/CR 1829, Nuclear Regulatory Commission, Washington, DC.
12 / 12
Page 1 of 1 12/15/2014 file://c:\\EMailCapture\\NRR_PMDA\\1758\\attch2.htm