Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML13323A186, ML13323A189, ML13323A190, ML13323A191, ML13323B187, ML13323B191, ML13323B194, ML13323B196, ML13323B198, ML13323B199, ML13323B200, ML13323B201, ML13323B202, ML13323B204, ML13323B207, ML13323B208, ML13323B209, ML14015A045, ML14052A053, ML14072A076, ML14086A386, ML14149A089, ML14149A434, ML14149A435, ML14178A481, ML14321A438, ML14321A677, ML14344A545, ML14344A546, ML14349A790, ML15119A326, ML15175A024, ML15183A007, ML15183A009, ML15246A128, ML15246A129, ML15265A601, ML16230A232, NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI), NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test., NOC-AE-13003065, Response to STP-GSI-191-EMCB-RAI-1, NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3, NOC-AE-14003101, Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application, NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1, NOC-AE-14003104, Revised Affidavit for Withholding for Casa Grande Analyses for Risk-Informed GSI-191 Licensing Application, NOC-AE-14003105, Third Set of Responses to April, 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application, NOC-AE-14003106, Second Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI- 191 Licensing Application, NOC-AE-14003111, Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing Application, NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application, NOC-AE-15003220, Description of Revised Risk-Informed Methodology and Responses to Round 2 Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application... further results
|
MONTHYEARML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results. Project stage: Other ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. Project stage: Other NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. Project stage: Other ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations. Project stage: Other ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. Project stage: Other ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 Project stage: Other ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End Project stage: Other ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. Project stage: Other ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects. Project stage: Other ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. Project stage: Other NOC-AE-13002954, Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-1912013-01-31031 January 2013 Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: Request ML13214A0312013-08-13013 August 2013 Acceptance Review, Exemption Requests and License Amendment Request to Revise UFSAR for Resolution of Generic Safety Issue 191, Assessment of Debris Accumulation on PWR Sump Performance (TAC MF0613-MF0614; MF2400-09) Project stage: Acceptance Review ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. Project stage: Other ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) Project stage: Other NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)2013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). Project stage: Other ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis Project stage: Other ML13323B1872013-10-31031 October 2013 Project, Units 1 & 2, Submittal of GSI-191 Chemical Effects Test Reports (TAC Nos. MF2400 and MF2401) Project stage: Other ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 Project stage: Other ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 Project stage: Other ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 Project stage: Other NOC-AE-13003043, Enclosure 5 - Response to NRC Supplemental Information Items2013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13323A1832013-11-13013 November 2013 Project Units 1 and 2 - Supplement 1 to Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 Project stage: Supplement NOC-AE-13003054, Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal2013-11-21021 November 2013 Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Supplement ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 Project stage: Meeting NOC-AE-13003065, Response to STP-GSI-191-EMCB-RAI-12013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting NOC-AE-13003057, Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application2014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14009A3072014-01-0909 January 2014 NRR E-mail Capture - Request for Additional Information - TACs MF2400 Through MF2409 Project stage: RAI ML13358A0622014-01-14014 January 2014 Summary of 12/16/13 Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14015A0452014-01-14014 January 2014 NRR E-mail Capture - Rai'S Regarding South Texas Project'S Submittal for Risk-Informed Resolution of GS-191 Project stage: Other NOC-AE-14003081, STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT42014-02-13013 February 2014 STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT4 Project stage: Request ML14052A0532014-02-13013 February 2014 Project Units 1 & 2, Submittal of Casa Grande Code & Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Other ML14149A4352014-02-14014 February 2014 Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 Project stage: Other ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 Project stage: Request ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 Project stage: Request ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 Project stage: Request ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 Project stage: Request ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 Project stage: Request ML14072A0762014-02-27027 February 2014 Project, Units 1 and 2, Submittal of GSI-191 Chemical Effects Test Reports (TAC Nos. MF2400 and MF2401) Project stage: Other ML14072A2112014-03-0606 March 2014 NRR E-mail Capture - STP Sensitivity Report and Presentation for Proposed Meeting Project stage: Request NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 32014-03-11011 March 2014 Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 Project stage: Other ML14086A3862014-03-17017 March 2014 STP Risk-Informed GSI-191 Aadb RAI 3 Response, Attachment 2 Project stage: Other ML14086A3852014-03-17017 March 2014 Project, Units 1 & 2 - Response to NRC Accident Dose Branch Request for Additional Information Regarding STP Risk-Informed GSI-191 Application Project stage: Request NOC-AE-14003111, Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing Application2014-03-18018 March 2014 Submittal of Casa Grande Source Code for Stp'S Risk-Informed GSI-191 Licensing Application Project stage: Other NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. Project stage: Request ML14091A4522014-04-0808 April 2014 Request for Withholding Information from Public Disclosure - 12/9/13 G. Powell, STPNOC Affidavit Enclosing RELAP5 Digital Media Related to GSI-191 License Amendment and Exemption Requests Project stage: Withholding Request Acceptance ML14087A0752014-04-15015 April 2014 Request for Additional Information, Request for Exemptions and Revised Pilot License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: RAI NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 12014-04-18018 April 2014 University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1 Project stage: Other 2013-12-05
[Table View] |
|
---|
Category:Graphics incl Charts and Tables
MONTHYEARML22033A5442022-02-0202 February 2022 Inservice Inspection Summary Report -1RE23 ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects. ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations. NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. ML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results. ML1118904202011-07-0606 July 2011 Licensee Slide from 7/7/11 Meeting with STP Nuclear ML11157A0102011-06-0202 June 2011 STP Nuclear Operating Company, Licensee Handouts, 6/2/2011 Meeting Risk-Informed GSI-191 Closure Plan for GSI-191 Resolution ML1112504292011-04-26026 April 2011 Annual Environmental and Annual Radiological Environmental Operating Reports, Part 2 of 2 ML1019004182010-06-28028 June 2010 Quick View Chart ML1005413692010-01-0505 January 2010 TS Pages from Licensee ML0930200982009-10-29029 October 2009 Summary of Meeting with STP Nuclear Operating Company, Licensee for South Texas Project, Units 1 and 2, to Discuss Experience with Implementation of Risk-Managed Technical Specification Pilot Amendment (Initiative 4b) and Other Initiatives ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists NOC-AE-06001960, Inservice Inspection Summary Report2006-01-19019 January 2006 Inservice Inspection Summary Report ML0426502472004-09-13013 September 2004 One Page from 033004 Open Items Table Riv Fire Protection ML0426100732004-09-13013 September 2004 One Page from the Open Items Table CY-02-012, Project Response to AIF Generator Survey2002-02-28028 February 2002 Project Response to AIF Generator Survey 2022-02-02
[Table view] Category:Photograph
MONTHYEARML17173A1392017-06-0909 June 2017 Engine Systems, Inc. - Transmittal of 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0117, Rev. 0 ML15183A0092015-04-0202 April 2015 Photos, Audit Summary, 3/31 to 4/2/15 Audit of Systems, Structures and Equipment at STP Facility; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. ML1112504292011-04-26026 April 2011 Annual Environmental and Annual Radiological Environmental Operating Reports, Part 2 of 2 NOC-AE-11002668, Annual Environmental and Annual Radiological Environmental Operating Reports, Part 1 of 22011-04-26026 April 2011 Annual Environmental and Annual Radiological Environmental Operating Reports, Part 1 of 2 ML0407701682004-04-15015 April 2004 Draft Information Input Photos-Attachment 9 2017-06-09
[Table view] Category:Report
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) ML21266A4262021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report ML21182A2412021-06-30030 June 2021 Commitment Change Summary Report ML17019A0032017-07-11011 July 2017 Attachment 2 to Safety Evaluation - In-Vessel Thermal-Hydraulic Analysis, Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 NOC-AE-17003468, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2017-05-10010 May 2017 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML16302A0152016-10-20020 October 2016 South Texas Project, Units 1 & 2 - Supplement 3 to Revised Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond to Generic Letter (GL) 2004-02 NOC-AE-16003345, LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2016-03-31031 March 2016 LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. NOC-AE-15003249, Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report2015-06-0909 June 2015 Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report ML14357A1362015-01-22022 January 2015 Review of Analysis of Capsule Withdrawal Schedule from Reactor Vessel Radiation Surveillance Program NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application2014-10-30030 October 2014 Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application ML14344A5462014-10-30030 October 2014 Attachment 1 to NOC-AE-14003190 - Alion REP-STP-8998-13, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application Executive Summary NOC-AE-14003178, Update Foreign Ownership, Control, or Influence (FOCI)2014-09-17017 September 2014 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-14003161, Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2.2014-08-31031 August 2014 Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2. ML14260A4382014-08-31031 August 2014 Engineering Report ER-1059, Rev. 1, Bounding Uncertainty Analysis for Thermal Power Determination at South Texas Project Units 1 & 2 Using LEFM System. NOC-AE-14003101, Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application2014-06-25025 June 2014 Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application ML14168A2682014-05-0101 May 2014 Texas Pollutant Discharge Elimination System Major Amendment with Renewal Application for a Major Facility Tpdes Permit No. WQ000190800 NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 12014-04-18018 April 2014 University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1 ML14087A0782014-04-15015 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0178 & MF0179) NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 32014-03-11011 March 2014 Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 NOC-AE-13003067, Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible2014-02-27027 February 2014 Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 ML14072A0872014-02-24024 February 2014 CHLE-016, Calculated Material Release to Estimate Chemical Effects, Revision 3 ML14072A0862014-02-24024 February 2014 CHLE-015, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal, Revision 4 ML14072A0802014-02-24024 February 2014 CHLE-006, STP Material Calculations, Revision 2 ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 ML14072A0882014-02-22022 February 2014 CHLE-018, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions, Revision 3 ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 ML14072A0772014-02-18018 February 2014 CHLE-005, Determination of the Initial Pool Chemistry for the Chle Test, Revision 2 ML14149A4352014-02-14014 February 2014 Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 ML14072A0812014-02-13013 February 2014 CHLE-007, Debris Bed Requirements & Preparation Procedures, Revision 4 ML13339A7362014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13354B8332014-01-23023 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for South Texas Project, Units 1 and 2, TAC Nos.: MF0825 and MF0826 NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. NOC-AE-13003019, Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 20132013-07-18018 July 2013 Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 2013 ML13175A2122013-06-18018 June 2013 Project, Units 1 and 2, Enclosure 4-1 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 1 Project Summary NOC-AE-13002986, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End2013-06-0606 June 2013 Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End 2023-08-31
[Table view] Category:Technical
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) ML21266A4262021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) ML16302A0152016-10-20020 October 2016 South Texas Project, Units 1 & 2 - Supplement 3 to Revised Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond to Generic Letter (GL) 2004-02 NOC-AE-16003345, LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2016-03-31031 March 2016 LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. NOC-AE-14003161, Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2.2014-08-31031 August 2014 Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2. ML14260A4382014-08-31031 August 2014 Engineering Report ER-1059, Rev. 1, Bounding Uncertainty Analysis for Thermal Power Determination at South Texas Project Units 1 & 2 Using LEFM System. NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 32014-03-11011 March 2014 Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 ML14072A0872014-02-24024 February 2014 CHLE-016, Calculated Material Release to Estimate Chemical Effects, Revision 3 ML14072A0862014-02-24024 February 2014 CHLE-015, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal, Revision 4 ML14072A0802014-02-24024 February 2014 CHLE-006, STP Material Calculations, Revision 2 ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 ML14072A0882014-02-22022 February 2014 CHLE-018, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions, Revision 3 ML14072A0772014-02-18018 February 2014 CHLE-005, Determination of the Initial Pool Chemistry for the Chle Test, Revision 2 ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 ML14149A4352014-02-14014 February 2014 Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 ML14072A0812014-02-13013 February 2014 CHLE-007, Debris Bed Requirements & Preparation Procedures, Revision 4 ML13339A7362014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13354B8332014-01-23023 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for South Texas Project, Units 1 and 2, TAC Nos.: MF0825 and MF0826 NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. ML13175A2122013-06-18018 June 2013 Project, Units 1 and 2, Enclosure 4-1 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 1 Project Summary ML13175A2402013-06-0606 June 2013 Project, Units 1 and 2, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 1 of 260 Through Page 160 of 260 NOC-AE-13002986, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End2013-06-0606 June 2013 Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End NOC-AE-13002975, Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.2-462013-03-31031 March 2013 Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.2-46 ML13079A8082013-03-11011 March 2013 Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.3-1 Through End ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects. ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 ML12335A1842012-11-26026 November 2012 Licensee Documents for December 12, 2012 Public Meeting ML12335A1902012-11-26026 November 2012 Licensee Documents for December 12, 2012 Public Meeting ML13025A1382012-10-31031 October 2012 STP GSI-191 Bypass Sensitivity Report - Water Conductivity Added ML12243A4742012-08-30030 August 2012 Email - Risk-Informed Approach to GSI-191, STP Cfd Data Analysis Report - Bypass Test Protocol ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations. NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. ML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results. ML1206100682012-02-28028 February 2012 Southtexas Project, Units 1 and 2 - Test Plan for STP High Temperature Vertical Loops Testing ML1205408162012-02-23023 February 2012 Experimental Setup for Chle Test Equipment ML1205406672012-02-22022 February 2012 Casa Grande Summary ML1205407272012-02-0909 February 2012 Actions Taken to Resolved Pirt Items 2023-08-17
[Table view] |
Text
3.0 Fiber Analysis There were two different types of fiber beds used during test; (1) blender-processed debris beds and (2)
NEI-processed debris beds. The NEI-processed debris bed was used for the duration of the 30-day test followed by the insertion of the blender-processed debris bed exposed to solution for 2 days. At the end of the test, the beds were analyzed by the naked eye to spot any noticeable features (particles, debris, etc.). Sections of the fiber bed with particulate were extracted and sent for SEM analysis. The following images depict samples taken from Test I post-test fiber beds. The name of the sample includes which bed it came from (NEI or Blender) and the approximate description of the visual appearance of the particle being examined is noted in the figure captions. If EDX of a particle was acquired, the location of the particle examined is indicated on the figure by an "X".
Blender, Tight Fiber No Particle, 1 1
Figure 53 - "Blender, Tight Fiber No Particle, 1" Very dirty fiber
Blender, Tight Fiber No Particle, 2 Figure 54 - "Blender, Tight Fiber No Particle, 2" Zoomed in view of dirty fiber Elmt Element % Atomic %
0 56.77065 69.19812 Na 9.799163 8.312148 Mg 1.583022 1.269783 Al 0.82532 0.596501 Si 26.61184 18.47771 Ca 4.410004 2.145727
Blender, Tight Fiber No Particle, 4 Figure 55 - "Blender, Tight Fiber No Particle, 4" Fiber bonded by precipitate
- 1 #2 Elmt Element % Atomic % Elmt Element % Atomic %
0 87.29305 91.56556 0 53.04387 66.44089 Na 7.752471 5.659089 Na 8.375714 7.300892 Si 3.919436 2.341958 Mg 1.601632 1.320186 Ca 1.035042 0.433387 Al 1.01925 0.757006 Si 29.04379 20.72318 Ca 6.915733 3.457829
Blender, White Specks, 1 Figure 56 - "Blender, White Specks, 1" Large particle on fiber Elmt Element % Atomic %
O 38.35108 57.62598 Na 2.812468 2.940913 Al 1.792424 1.596983 Si 1.596614 1.366607 P 21.37774 16.59197 Ca 28.37723 17.02064 Ti 5.69245 2.856915
Blender, White Specks, 2 Figure 57 - "Blender, White Specks, 2" Spider web looking precipitate on fiber
Blender, black strip, 1 Figure 58 - "Blender, black strip, 1" Scattered precipitate Elmt Element % Atomic %
0 72.39867 80.53704 Na 12.47189 9.654976 Al 8.515695 5.616993 Si 6.613756 4.190985
NEI, white flakes, 1 Figure 59 - "NEI, white flakes, 1" Layered particle on fiber
- 1 #2 Elmt Element % Atomic % Elmt Element % Atomic %
0 52.97784 73.97655 0 70.30152 84.59555 Al 0.577575 0.478219 Al 3.347521 2.388497 Si 0.848312 0.674774 Si 5.693091 3.902419 Ca 39.60971 22.07835 Ca 10.33824 4.965859 Ti 5.986553 2.792119 Ti 10.31964 4.147675
Blender, Grey Strip, 1 Figure 60 - "Blender, Grey Strip, 1" Flat precipitate Elmt Element % Atomic %
0 31.24707 52.46994 Al 0.932475 0.928447 Si 1.000949 0.95745 P 10.25309 8.89307 Ca 45.91915 30.7794 Ti 10.64725 5.971675
Blender, Grey Strip, 2 Figure 61 - "Blender, Grey Strip, 2" Small dump on fiber Elmt Element % Atomic %
O 60.32007 78.11366 Na 2.673882 2.40969 Al 0.428939 0.329366 Si 0.669457 0.493845 P 1.023016 0.684295 Ca 34.12969 17.6426 Ti 0.754966 0.32655
Blender, Black Spots, 1 Figure 62 - "Blender, Black Spots, 1" Gunk on fiber Elmt Element % Atomic %
0 97.36662 98.35217 Na 1.190426 0.836816 Si 1.083767 0.62361 P 0.359193 1 0.187412
Blender, Black Spots, 2 Figure 63 - "Blender, Black Spots, 2" Crystal on particle Elmt Element % Atomic %
0 70.31113 80.97112 Na 2.706346 2.168919 Al 4.024393 2.748053 Si 18.12502 11.89015 Ca 4.833108 2.221762
Blender, Black Speck, 1 Figure 64 - "Blender, Black Speck, 1" Precipitate at fiber crossing Elmt Element% Atomic %
0 99.25358 99.54417 Na 0.527579 0.368223 Ca 0.218836 8.76E-02
Blender, Black Speck, 2 Figure 65 - "Blender, Black Speck, 2" Small amount of precipitate Elmt Element % Atomic %
0 57.99848 70.58616 Na 8.362384 7.082506 Mg 1.429282 1.144703 Al 0.63881 0.460992 Si 25.97108 18.00512 Ca 5.599967 2.72053
NEI, Black Specks, 1 Figure 66 - "NEI, Black Specks, 1" Precipitate clump Elmt Element % Atomic %
F 14.68916 27.62317 Al 1.641468 2.173415 Si 2.80432 3.567157 P 2.11163 2.435594 Ca 37.53921 33.46122 Ti 41.21422 30.73944
NEI, Black Specks, 2 Figure 67 - "NEI, Black Specks, 2" Large amount of particulate
- 1 #2 Elmt Element % Atomic % Elmt Element % Atomic %
F 81.71114 90.61282 0 55.41555 68.31646 Al 0.819067 0.639531 Na 7.913568 6.78922 Si 1.33287 0.999803 Mg 1.477881 1.198962 Ca 7.579323 3.983996 Al 1.158964 0.847193 Ti 8.557604 3.763855 Si 29.0257 20.38353 Ca 5.008331 2.46463
NEI, Black Speck, 1
- m " -- 'i. ý 4ý 1 r
Figure 68 - "NEI, Black Speck, 1" Fiber "sunk" in precipitate
NEI, black speck, 2 Figure 69 - "NEI, black speck, 2" Very clean NEI
NEI, Clean Fiber, 1 Figure 70 - "NEI, Clean Fiber, 1" Wispy fiber
4.0 Baseline Fiber The method of preparation of fiber debris samples for SEM analysis was examined to determine if the procedure contributed to the formation of particulates or attributes that may be of interest. Two batches of NEI-processed fiber were prepared and soaked for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in solution of interest. One batch of fiber was allowed to soak in borated-TSP solution, while the other batch was soaked in in deionized (DI) water. Three types of samples were taken from the two batches. One sample was taken from the fiber soaked in the DI water and, a second sample was taken from the borated-TSP solution, and a third sample was taken from the borated TSP solution and quickly rinsed with DI water. All samples were allowed to dry in a desiccator before they were sputter coated. The results of the samples taken are below. A description of the images is given by the caption. If EDX of a particle was acquired, the location of the particle examined is indicated on the figure by an "X".
NEI, Soaked in DI, 1 Figure 71 - "NEI, Soaked in DI, 1"
- 1 #2 Elmt Element % Atomic % Elmt Element % Atomic %
0 41.52557 55.65168 0 46.62602 60.80523 Na 10.70849 9.987221 Na 10.86826 9.863396 Mg 1.639075 1.445552 Mg 1.48125 1.271198 Al 1.025322 0.814782 Al 0.663484 0.51 3052 Si 35.36501 26.99849 Si 29.40307 21.84279 Ca 9.031668 4.831653 Ca 10.9579 5.704335 Fe 0.704875 0.270625
NEI, Soaked in DI, 1 Continued
- 3 Elmt Element % Atomic %
0 50.92377 63.92218 Na 13.0194 11.37302 Mg 1.954836 1.61478 Al 0.886411 0.659758 Si 27.35993 19.56361 Ca 5.37906 2.695271 Fe 0.476584 0.171381
NEI, Soaked in Borated TSP, 1 Figure 72 - "NEI, Soaked in Borated TSP, 1" Elmt Element % Atomic %
0 54.4035 66.84762 Na 13.0756 11.18084 Mg 1.732408 1.400817 Al 0.821988 0.598885 Si 25.17802 17.62315 Ca 4.788505 2.348682
NEI, Soaked Borated TSP, 2 Figure 73 - "NEI, Soaked Borated TSP, 2" Zoomed in picture Elmt Element % Atomic %
0 83.46626 89.07186 Na 8.438155 6.266585 Mg 0.349496 0.245439 Al 0.212037 0.134171 Si 3.75549 2.282964 P 3.109064 1.713779 Ca 0.669499 0.285197
NEI, Soaked Borated TSP rinsed with DI, 1 Figure 74 - "NEI, Soaked Borated TSP rinsed with DI, 1" Elmt Element % Atomic %
0 54.5554 66.89457 Na 13.74195 11.72615 Mg 1.973917 1.592774 Al 0.871655 0.633747 Si 24.30052 16.97351 Ca 4.187444 2.049591 Fe 0.369102 0.129656
NEI, Soaked Borated TSP rinsed with DI, 2 Figure 75 - "NEI, Soaked Borated TSP rinsed with DI, 2" Big particles were not found anywhere. This in one of the very few particles that were actually found, but it is very small.
Elmt Element % Atomic %
0 61.0692 74.41264 Na 7.787324 6.603386 Mg 1.036385 0.831032 Al 1.091318 0.788487 Si 14.75426 10.24106 Cl 4.481705 2.46438 Ca 9.067391 4.410338 Fe 0.712416 0.248686
5.0 Aluminum SEM Aluminum used in the test was taken from aluminum scaffolding obtained from STP. This scaffolding was a non-homogenous sample with unknown constituents from years of use which remained after cleaning and the alloy of aluminum is not known. The samples which were to be submerged were from the side of the scaffolding and had a different texture and appearance than the samples cut for the vapor space. Three types of aluminum samples for submerged and vapor samples were examined using SEM and are as follows: (1) examination of test samples, (2) analysis of pre-test samples (3) examination of test samples after scale removal. Post-test samples were labeled "used", while base line pre-test samples were labeled as "not used". Samples which had scale removed were labeled as "acid washed".
Those that did not have scaled removed were labeled as "not washed". The SEM results of all aluminum samples are shown below. A description of the images is given by the caption. If EDX of a particle was acquired, the location of the particle examined is indicated on the figure by an "X".
Used Submerged, Not Washed, 1 Figure 76 - "Used Submerged, Not Washed, 1"
Used Submerged, Not Washed, 2 Figure 77 - "Used Submerged, Not Washed, 2" Cracking features Elmt Element % Atomic %
0 55.87518 69.72538 Al 20.307 15.02576 Si 15.05654 10.70287 P 2.40957 1.553127 S 1.918446 1.194529 Ca 1.518032 0.756168 Fe 2.915237 1.042171
Used Submerged, Not Washed, 3 Figure 78 - "Used Submerged, Not Washed, 3"
- 1 #2 Elmt Element % Atomic % Elmt Element % Atomic %
0 16.29551 25.04923 0 54.97348 68.3452 Al 78.43685 71.49327 Al 33.83013 24.93889 Si 1.253322 1.097469 Si 0.833296 0.590143 P 1.147492 0.911111 P 2.316628 1.48767 S 0.170633 0.130877 S 5.929717 3.678442 Ca 0.754579 0.463016 Ca 1.468387 0.728719 Fe 1.941611 0.85503 Fe 0.648374 0.230926
Used Submerged, Not Washed, 4 Figure 79 - "Used Submerged, Not Washed, 4" Small cracking Elmt Element % Atomic %
O 32.17372 44.83123 Na 0.809217 0.78469 Al 58.67721 48.48054 Si 1.536704 1.219754 P 5.502426 3.960309 Ca 1.300734 0.723491
Used Submerged, Acid Washed, 1 Figure 80 - "Used Submerged, Acid Washed, 1" Elmt Element % Atomic %
O 5.372327 8.731379 Mg 0.723003 0.773273 Al 93.90467 90.49535
Used Submerged, Acid Washed, 2 Figure 81 - "Used Submerged, Acid Washed, 2" Particulate on surface Elmt Element % Atomic %
0 56.49949 77.71421 Al 3.341963 2.725689 Si 2.877982 2.255002 P 0.707126 0.502398 Ti 36.57345 16.8027
Used Submerged, Acid Washed, 3 Figure 82 - "Used Submerged, Acid Washed, 3" Elmt Element % Atomic %
0 5.693635 9.241012 Al 94.30636 90.75899
Unused Submerged, Acid Washed, 1 Figure 83 - "Unused Submerged, Acid Washed, 1" Elmt Element % Atomic %
C 19.28571 33.93004 0 5.485235 7.244866 Al 72.2487 56.58273 Si 2.980362 2.242369 Note: carbon accidentally got checked in this EDS and is probably not correct due to the way that oxygen was being calculated by changing some carbon readings.
Unused Submerged, Acid Washed, 2 Figure 84- "Unused Submerged, Acid Washed, 2" Elmt Element % Atomic %
0 7.747664 12.41073 Al 91.32348 86.74169 Si 0.928858 0.847577
Unused Submerged, Not Washed, 1 Figure 85 - "Unused Submerged, Not Washed, 1"
- 1 EDS of particle #2 EDS of Face Elmt Element % Atomic % Elmt Element % Atomic %
0 52.90488 66.05394 0 37.43722 50.60629 Na 1.922631 1.670524 Na 1.295838 1.219006 Al 34.75129 25.7272 Al 49.83636 39.94533 P 6.952252 4.483571 Si 5.181171 3.989623 S 2.695725 1.679398 P 3.366714 2.35073 Ca 0.773231 0.385369 S 2.472522 1.667694 Ca 0.410188 0.221334
Unused Submerged, Not Washed, 2 Figure 86 - "Unused Submerged, Not Washed, 2" Shale
- 1 #2 Elmt Element% Atomic% Elmt Element % Atomic %
0 57.54915 70.0183 0 37.02751 50.01065 Al 36.39483 26.25615 Al 57.94616 46.40678 Si 0.570515 0.395405 Si 2.04494 1.573336 S 5.485495 3.330148 S 2.981392 2.009242
Unused Vapor, Acid Washed, 1 Figure 87 - "Unused Vapor, Acid Washed, 1"
Unused Vapor, Acid Washed, 2 Figure 88 - "Unused Vapor, Acid Washed, 2" Rough slope of sample Elmt Element % Atomic %
0 26.18998 37.81557 Al 59.55833 50.99136 Si 11.96874 9.844341 K 2.282946 1.34873
Unused Vapor, Acid Washed, 3 Figure 89 - "Unused Vapor, Acid Washed, 3"
- 1 #2 Elmt Element % Atomic % Elmt Element % Atomic %
0 50.9611 64.47919 0 22.30666 32.73701 Al 5.971625 4.480144 Al 67.56657 58.79698 Si 43.06727 31.04067 Si 10.12677 8.466
Used Vapor, Not Washed, 1 I I I IT Y1.1 I
Figure 90 - "Used Vapor, Not Washed, 1"
Used Vapor, Not Washed, 2 Figure 91 - "Used Vapor, Not Washed, 2" Elmt Element % Atomic %
0 50.54052 65.42443 Na 2.121558 1.911213 Al 19.7753 15.17896 Si 10.50073 7.743242 P 8.120576 5.429785 S 0.888045 0.573602 Ca 5.156328 2.66444 Fe 2.896936 1.074316
Used Vapor, Not Washed, 3 Figure 92 - "Used Vapor, Not Washed, 3" Elmt Element % Atomic %
0 60.19044 72.63639 Na 5.997493 5.036749 Al 16.02977 11.47024 Si 5.435722 3.736689 P 4.377243 2.728493 S 4.587612 2.762412 Ca 3.381714 1.629029
Used Vapor, Acid Washed, 1 Figure 93 - "Used Vapor, Acid Washed, 1" Elmt Element % Atomic %
0 54.62689 67.24589 Al 32.65743 23.83746 Si 12.71568 8.916649
Used Vapor, Acid Washed, 2 Figure 94 - "Used Vapor, Acid Washed, 2" Elmt Element% Atomic %
0 28.34927 40.30083 Al 59.47025 50.12918 Si 10.89308 8.821161 K 1.2873981 0.748822
Unused Vapor, Not Washed, 1 Figure 95 - "Unused Vapor, Not Washed, 1"
- 1 #2 Elmt Element % Atomic %
Elmt Element % Atomic %
0 29.14538 41.61925 0 59.15316 73.00966 Na 0.486218 0.48318 Na 0.63718 0.547291 Mg 0.621621 0.584147 Mg 0.419918 0.341066 Al 58.73953 49.73632 Al 14.66136 10.72989 Si 5.083239 4.134928 Si 11.93555 8.391659 P 1.69262 1.248474 P 6.691381 4.265929 Cl 0.34045 0.219391 Cl 0.591235 0.329308 K 1.333805 0.779311 Ca 2.694184 1.327378 Ca 0.925179 0.52737 Fe 1.676081 0.592639 Fe 1.631967 0.667619 Zn 1.539939 0.465179
Unused Vapor, Not Washed, 2 Figure 96 - "Unused Vapor, Not Washed, 2" Elmt Element % Atomic %
O 31.00385 47.66272 Al 12.4003 11.30353 Si 21.75179 19.04852 P 5.832083 4.631081 Cl 0.62965 0.43682 K 18.24822 11.4783 Ca 5.632656 3.45654 Fe 4.501449 1.982478
Appendix 2 - Aluminum Corrosion, WCAP-16530-NP material release, XPS Summary results
Aluminum Corrosion Calculation I I
¶,.
OaALC al~l AaaM)33k I 27712_.., n! EI. -- IU I I aim 11155 1Al~lI~a.TMAl~.
aiml all3I 16131 Sm.
SI SlIM 535 735 33s 5
llama Ala~a~j a.~SI alAlI al all, lOl,
,.aaa.
SAl, S~S gsa,.,
.31~I ImI I
an, I 313331 StIlli a..
___________ 151511350 Al T333.33Mfl5151.lg,35.
Alin1515~ l~ ~l!lA~~ 3.la3.aa.5A{ IlAI.3,155,Ia..Al 33~J~ 031a7lA*
3315~lj 733l55tim3Alj,1W335155Th -
I -.- 1.--, 1--.- 1---- --- 1- 1-1-1 7 13215515L35115 mm,. I 15 n,.llJhm. 33 2alaaAl I
Calculated Material Release MBLOCA WCAP Calculation-kjh.xlsx 11/19/20121:07 PM 0
0 0
60 0
0 0
0 17 0 0
18 0 19 0 20 0 122 0 0
0 0
0 1
nt
10~~~~Cluae MMMINKIMMIM ý Material Release 22 NK21 MAN 2 .2 12 42 EL~
43NLL 44 IN~~
45 48 47Ior 50 I
Calculated Material Release MBLOCA WCAP Calculation-kjh.xlsx 11/19120121:07 PM A B C D E F G H I J K L M N S T U Start of End of NaAIS6O8 AIOOH Ca 3(P0 4)2 Ca conc in Si conc: in A] conc in Interval Interval Interval Average Average Temp Al Release Precipitate Preapitate Precpitate soluUOn solutiOn soluton 1 Duration (min) (hrs) (hrs) Time (d) Interval pH (F Ca Release (kg) Si Release (kg) (kg) (kg) (kg) (kg) (mg/IL) (mg/L) (mg/L) 2 5.0 0.00 0.1 0.00347222 5.555 119.7 0.0037 0.0014 0.0007 0.004 0.001 0.010 0.00 0.00 0.00 3 0.8 0.08 0.1 0.00405093 6.46 155.6 0.00 0.00 0.00 0.0 0.0 0.01 0.00 0.00 0.00 4 0.8 0.10 0.1 0.00462963 6.46 187.45 0.01 0.00 0.00 0.0 0.0 0.02 0.00 0.00 0.00 5 0.8 0.11 0.1 0.00520833 6.46 181.65 0.01 0.01 0.01 0.0 0.0 0.02 0.00 0.00 0.00 6 1.1 0.13 0.1 0.00596065 6.46 177.85 0.01 0.01 0.01 0.0 0.0 0.02 0.00 0.00 0.00 7 0.6 0.14 0.2 0.00636574 6.46 174.85 0.01 0.01 0.01 0.0 0.0 0.03 0.00 0.00 0.00 8 0.8 0.15 0.2 0,00694444 6.595 167.6 0.01 0.01 0.01 0.0 0.0 0.03 0.01 0.01 0.00 9 3.3 0.17 0.2 0.00925926 6.73 156.95 0.01 0.02 0.01 0.0 0.0 0.04 0.01 0.01 0.01 10 1.7 0.22 0.3 0.01041667 6.805 155.95 0.02 0.02 0.01 0.1 0.0 0.04 0.01 0.01 0.01 11 5.0 0.25 0.3 0.013888889 6.935 162.6 0.02 0.03 0.02 0.1 0.0 0.06 0.01 0.01 0.01 12 10.0 0.33 0.5 0.020833333 7.07 166.75 0.04 0.05 0.04 0.1 0.1 0.10 0.02 0.02 0.02 13 10.0 0.50 0.7 0.027777778 7.175 167.3 0.05 0.07 0.07 0.2 0.1 0.13 0.02 0.03 0.03 14 10.0 0.67 0.8 0.034722222 7.2 165 0.06 0.09 0.09 0.3 0.1 0.17 0.03 0.04 0.04 1510.0 0.83 1.0 0.041666867 7.2 162.35 0.08 0.11 0.11 0.3 0.2 0.20 0.04 0.05 0.05 16 5.0 1.00 1.1 0.045138889 7.2 161.9 0.08 0.12 0.12 0.4 0.2 0.22 0.04 0.06 0.06 17 17.0 1.08 1.4 0.056944444 7.2 163.15 0.11 0.15 0.15 0.5 0.2 0.27 0.05 0.07 0.07 18 34,7 1.37 1.9 0.081018519 7.2 163.85 0.15 0.21 0.22 0.7 0.3 0.39 0.07 0.10 0.11 19 33.3 1.94 2.5 0.104166667 7.2 162.6 0.20 0.28 0.29 0.9 0.4 0.50 0.09 0.13 0.14 20 16.7 2.50 2.8 0.115740741 7.2 161.65 0.22 0.31 0.32 1.0 0.5 0.56 0.10 0.15 0.15 21 33.3 2.78 3.3 0.138886889 7.2 161.95 0.26 0.37 0.38 1.1 0.6 0.67 0.13 0.18 0.18 22 16.7 3.33 3.6 0.150462963 7.2 162.25 0.28 0.40 0.41 1.2 0.6 0.73 0.14 0.19 0.20 23 23.3 3.61 4.0 0.166666667 7.2 162.3 0.31 0.44 0.46 1.4 0.7 0.80 0.15 0.21 0.22 24 60.0 4.00 5.0 0.208333333 7.2 161.95 0.39 0.55 0.58 1.7 0.9 1.00 0.19 0.27 0.28 25 60.0 5.00 6.0 0.250000000 7.2 160.75 0.46 0.66 0.69 2.0 1.1 1.20 0.22 0.32 0.33 26 30.0 6.00 6.5 0.270833333 7.2 159.75 0.50 0.71 0.74 2.2 1.1 1.29 0.24 0.34 0.36 27 90.0 6.50 8.0 0.333333333 7.2 159.5 0.61 0.86 0.76 2.7 1.1 1.58 0.29 0.41 0.36 28 960.0 8.00 24.0 1.000000000 7.2 151.95 1.70 2.18 0.90 6.8 0.4 4.39 0.82 1.05 0.43 29 1440.0 24.00 48.0 2.000000000 7.2 138.55 2.35 3.48 1.02 9.9 0.0 6.07 1.13 1.68 0.49 30 1440.0 48.00 72.0 3.000000000 7.2 128.35 2.35 4.40 1.09 10.6 0.0 6.07 1.13 2.12 0.53 31 2880.0 72.00 120.0 5.000000000 7.2 118.85 2.35 5.71 1.19 11.6 0.0 6.07 1.13 2.75 0.57 32 7200.0 120.00 240.0 10.000000000 7.2 108.85 2.35 7.91 1.34 13.0 0.0 6.07 1.13 3.80 0.65 33 14400.0 240.00 480.0 20.000000000 7.2 101.1 2.35 10.83 1.55 15.0 0.0 6.07 1.13 5.21 0.74 34 14400.0 480.00 720.0 30.000000000 7.2 96.05 2.35 12.76 1.70 16.5 0.0 6.07 1.13 6.14 0.82 Pool volume 73399.987 f13 2078.4562 m3
-w _2078456.2 L 40- __ NOTE: This calculation adjusts only the pool volume and aluminum quantity, and eliminates the marinite
XPS Summary S102 Na2CO3 I54.0 1072.7 Sample Identifier Al2p % 0ls% Cls% Si2s% N ls% P 2p% Na Is% A12p% Os% Cls% Si2s% N 1s% P2p% Nals% Zn2p% CI2p% S2p% Ca2p% Fe2p% Co2p% F15%
Sub A-wash 4&.1 29. 4.7 2.3 Li 8.S 4.7 2-5 2 0.2 0.
unused sub A-wash 16* 335 5(L2 1.4 2. 1.9 114
- 47.
32* 31.
SU 1.* 2-1 1 0. 0.1 1-4 7JA 48.Z M vaporAwash 2A 1.3 0.3 GA 30A 54. 1.2 15 O4 0.2 CIA 4.2 S.0 82 U. 1.9 unused yap A-wash 47.7 3L.6 9.1 1.3 &.7 7.* 411.0 30. 2.0 0.7 0.2 0.2 0.2 Sub non A,&ah 69.3 44* 2.0 0* 0.5 1.2 LI1 03 30.3 32.1 3. 2.1 3-3 0*. 6.1 M37 2.9 Sub unused not A-wash 3an 52*6 U 3.3 L9 5.5 3315 51.0 3.0 3-5 0* OA4 0.2 0.3 0*11 vap non Awh 44.7 3Z.7 SA 2.3 I.P 0. 7A 49-4 Z9.7 7* L9 Li1 015 0.2 0-9 21A unused vap nrumA-wash 4.7 43.3 34.7 11.2 2.2 1.4 0.. 43 44.S 33.1 U-0 2.3 1.1 CA .
U. 0.4 13 0.3 P2psubmergednon wash AlZp% 01s% SiZs% N 1s% PZp% Na Is%
Sub A-wash 17.9 68.4 6.7 3.2 3.0 0.7 I unused sub A-wash 20.4 67.1 310 4A 3.8 13 vapor A-wash 15.1 689. 9.3 3.1 3.0 0.8 unused vap A-wash 11.9 69.7 13.3 2.3 1.8 1.1 Subnon A-wash 12.6 71.7 5.8 2.9 4.8 1.2 Subunusednot A-wash 12-2 71.3 3.8 7.1 3.9 1.7 C .9 vap nornA-wash 14.2 66.2 12.6 3.5 2.6 1.0 a unused napnuon A-wash 7.2 69.5 17.1 3A4 2.1 0.8 a
a 0 ~a a-
- Sam lT AJ2p% I Ols% S12s% NlS% P22% Nals%
Su me 12.2 71.3 3. 7.1 3.9 7 100.0 lVo.P 7.2 69MS3 17.1 3.4 2,1 0.3 100.0 P
C-O-PO AISiPOx A1203/AI(OH)3 C-N=O NO N02 NO/Al, N03/N20 c-C C-N C-N=O/COOH AIPO4 Na3PO4 AIPO4 aluminan AIO(OH) A1203 Sample Identifier 400.24083 402.5605 405.2 407.677 409.636 284.896 286 288.58 134 135.74 74.467 75.2926 76.8307 77.922 Sub A-wash 30.5527 11.33939 43.0909 15.017 54.8923 34.8 10.335 49.52 50.477 21.995 46.6889 22.8212 8.4952 unused sub A-wash 42.216967 9.84835 45.7659 5.44528 60.0041 33.9 59.15 40.855 34.882 35.2147 21.5717 8.3317 vapor A-wash 45.4369 20.6921 30.7312 3.13969 52.6608 40.1 7.2684 23.17 76.834 8.5054 39.4153 26.9466 25.133 unused yap A-wash 67.631133 9.450227 21,2466 1.67211 55.0534 31.9 13.068 81.47 18.527 56.602 32.6624 10.7359 Non-acid washed samples Submerged Test sample 70.6241 9.884277 19.3874 0.1042 57.4947 30 12.504 10O 50.859 49.1406 Submerged background san 91.S441 8.455885 61.0174 26.8 12.21 100 0 57.971 42.0288 Vapor Test sample 35.3401 21.68825 34.9259 8.04576 51.7989 28.5 19.732 100 0 86.562 13.4376 Vapor backgound sample 100 65,7832 22.8 11.399 100 0 83.147 16.8532 Sub unused not A-wash 91.5441 8.455885 61.0174 26.8 12,21 100 0 57.971 42.0288 unused yap non A-wash 100 65,7832 22.8 11,399 100 0 83.147 16.8532