ML15191A251

From kanterella
Revision as of 14:42, 15 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

July 9, 2015 Public Meeting: Comanch Peak Pre- Application Meeting, Emergency Diesel Generator Voltage and Frequency Technical Specification Changes
ML15191A251
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/09/2015
From: Regner L M
Plant Licensing Branch IV
To: Flores R
Luminant Generation Co
Singal B K
References
TAC MF6311, TAC MF6312
Download: ML15191A251 (10)


Text

LuminantPre-Application MeetingAgendaTim Hope, Mgr, Nuclear LicensingIntroductionsRob Slough, Consulting Licensing AnalystCurrent TS 3.8.1 and Proposed SR ChangesJim Andrachek, WestinghouseEvaluation Methodology NRC StaffQuestions/Feedback Tim Hope, Mgr, Nuclear LicensingClosing remarks/summary Need for the Proposed Changes*During several Component Design Basis Inspections (CDBIs), NRC Inspectors have questioned whether the impacts of the allowable tolerances in DG frequency and voltage have been evaluated with respect to ECCS performance.*Issue raised at Comanche Peak during CDBIs in 2010 and 2013, documented in Inspection Reports 2010-006 and 2013-007.*The PWROG developed a methodology to generically address the issue and requested that the NRC recognize that a licensee awaiting NRC approval of the methodology is taking timely corrective action. NRC stated that they do not agree, and that licensees should not wait for approval to take corrective actio .The proposed changes would revise Technical Specifications (TS) 3.8.1, "AC Sources -Operating," Surveillance Requirements (SRs)related to Diesel Generator (DG) voltage (V), and frequency (Hz) to:*Specify a nominalvoltage and frequency in SR 3.8.1.2*Increase the steady state lower voltage limit and narrow (i.e., reduce) the steady state frequency range specified in SRs:3.8.1.73.8.1.15 3.8.1.113.8.1.19 3.8.1.123.8.1.202.The note in SR 3.8.1.13 will be deleted as it contains out-of-date information for Unit 2 that no longer applies to the SR.Summary of Proposed Changes Proposed SR ChangesCurrent LimitsProposed LimitsVoltage>6480 -<7150 V>6555-<7150 VFrequency>5 <61.2 Hz>59.4-<60.6Hz Benefit of Proposed ChangesThe proposed changes will ensure that the effect of variations in EDG steady state voltage and frequency, associated with the EDG voltage regulator and governor, on the equipment powered by the EDGs has been evaluated to ensure that the equipment will continue to perform their specified safety function Precedents*On April 11, 2013, the NRC issued Amendment No. 224, Docket No. 50-361, to Wolf Creek Generating Station Unit No. 1. The amendment revised the TS 3.8.1, "AC Sources -Operating, Surveillance Requirements related to diesel generator test loads, voltage, and frequency. (ML13077A147) *On October 21, 2014, the NRC issued Amendment No. 307, Docket Nos. 50-317 and 50-318, to Calvert Cliffs Nuclear Power Plant Unit Nos. 1 and 2. The amendment revised the TS 3.8.1, "AC Sources -Operating, Surveillance Requirement (SR) 3.8.1.17 and modified SRS 3.8.1.8, 3.8.1.11, and 3.8.2.1. The revisions were related to diesel generator (DG) testing duration, loading requirements, and frequency of DG sequencer testing. (ML14280A522)

ScheduleLuminant Power expects to submit LAR 15-001 for Staff review by August 31, 2015, to be implemented no later than 120 days after issuance of the License Amendmen Description of Methodology 1.Determine the affect of EDG steady-state frequency and voltage tolerances associated with the governor and voltage regulator on:-Essential motor loads such as:*Emergency Core Cooling System (ECCS) pumps,

  • Motor-operated valves (MOVs),
  • Fans and blowers credited in the dose consequence analyses, consistent with the Ventilation Filter Testing Program.-EDG loading calculations

-EDG fuel oil consumption calculations2.Combine the frequency and voltage tolerances with other uncertainties to revise the pump inservice test (IST) curves to account for these tolerances.3.Revise the affected SRs to include the frequency and voltage tolerances and ensure that the EDG operates within the specified tolerance band Example of the Methodology to Adjust the Pump IST Curves Figure 515002000 25003000350040000100200300400500600Flow (GPM)TDH (Feet)Minimum CurveVendor CurveMeasurment UncTotal Unc Questions? Feedback?