IR 05000269/1978007

From kanterella
Revision as of 00:33, 2 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Rept 50-269/78-07,50-270/78-07, 50-287/78-07 on 780328-31 & Notice of Violation
ML19316A200
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/18/1978
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19316A196 List:
References
NUDOCS 7911280732
Download: ML19316A200 (2)


Text

.

~-

.

.

[gs4 4C g

W UNITED ST ATES c.,

NUCLEAR REGULATORY COMMISSION

,

[

,.. ( ; q REGION H

,

. * ( v '

g 230 PE ACHTRE E STREET. N W SUtTE 1217

?

[

ATL ANTA. GE ORotA 30303

.

%..... *

APR !8 193

In Reply Refer To:

RII:GRJ 50-269/78 7 55~'ETd/ 78-7 50-287/76-7 Duke Power Company Attn:

!k. 'a'1111am O. Parker, Jr.

Vice President, Steam Production P. O. Box 2175 422 South Church Street Charlotte, North Carolina 28242 Gentlemen:

This refers to the inspection conducted by 12. G. R. Jenkins, of this office on March 2S-31, 1978, of activities authorized by NRC Operating License Nos. DPR-3S, DPR-47 and DPR-55 for the Oconee 1, 2 and 3 facilities,

-

-

- and to the discussion of our findings held with Mr. J. E. Smith at t'ne

^ ~

conclusion of thc inspection.

Areas exarined during the inspection and our findings are discussed ir the enclosed inspection report. i.fithin these areas, the inspectier consisted of selectivc exar.inations of procedures and representative records, interviews with personnel, and observations by the inspecter.

'se have examined actions you have taken with regard te previously

.

identified enforcement matters and unresolved itens.

The status of these items is discussed in the enciesed report.

Du r i n.: the inspection it was found that certai activities under ccur

'icense appear to be in noncompliance with NRC-r-equirements.

This iter and rcierences to pertinent requirements are listed in the Netice of Violation enclosed herewith as Appendix A.

Corrective actions te prevent recurrences were completed prior to the conclusien ei this inspection; therciore, a reply is not requested.

I During the inspection it was found that certain activities under ycur ifcense appear to deviate from commitments to the Con =ission, and have safet. sienificance. This item is identified in the Notice of Deviatien enclosed herewith as Appendix B.

Please provide us in writing within

-

20 days of your receipt of this letter your comments including a descrip-tion of corrective actions that have been or will be taken, corrective actions which will be taken to avoid further deviations, and the date corrective actions were or will be completed.

c.,

79112.80 7 3 2

.

.

-

-.

-

.. - -

. - - -

-

-

.

!

AP' I 8157E

^

(~)

'

i Duke Power Compcny-2-

i

.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so

'

that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we vill be glad to discuss them with ynu.

Sincerely,

-

-.

_ _ _ ___

. fff

_

i e

- -. -... - -

.*

.. - -

J. T. Sutherland, Chief Fuel Facility and.'hterials safety Branch Enclosures:

1.

Appendix A, Notice of Violation 2.

Appendix B, Notice of Deviation 3.

Inspection Report Nos. 50-269/78-7, 50-270/78-7 and 50-287/78-7 cc w/ enc 1:

?!r. J. E. Smith, Station.'bnager Oconee Nuclear Plant P. O. Box 1175

,

'

Seneca, South Carolina 29678

.

,..,,.e---

-4--

--e e e eesw+-+W-**==~~r*

---

  • P#-"

' ' *

~ ' *

' ' '

-

r

'

-l

-